Monthly Operating Rept for Mar 1974
ML19317E619
Person / Time
Site: Oconee  
Issue date: 04/10/1974
From:
DUKE POWER CO.
To:
Shared Package
ML19317E613 List:
References
NUDOCS 7912180814
Download: ML19317E619 (2)


Text

UNIT Oconce Un.'

DATE April 10. 1974

,9 0PERATING STATUS 6

1.

RZPORTING PERIOD:

March 1 TO March 31. 1974 GROSS I!OURS IN REPORTING PERIOD:

744 2.

CURRENTLY AUTHORIZED POWER LEVEL Pfde 2568 lide-NET 2

3.

POWER LEVEL TO WilICll RESTRICTED (IF ANY):

None 4.

REASONS FOR RESTRICTIONS (IF ANY):

Oconee Unit 2 is currently in power escalation testing and is not commercially operable. Items 10-13 are not applicable.

- THIS CUMULATIVE MONTH YK-TO-DATE TO DATE 0

85.6 743.0 5.

Il0URS REACTOR WAS CRITICAL O

64.0 577.2 6.

Il0URS GENERATOR ON-LINE 0

104099 709271 7.

GROSS THER!!AL POWER GENERATED (MWH) 8.

GROSS ELECTRICAL POWER GENERATED (MWilj' 0

33000 209310 9.

NET ELECTRI \\L POWER CENERATED (MWH)

-2165 21447 173734 10.

REACTOR AVAILABILITY FACTOR (1) 11.

PLANT AVAILABILITY FACTOR (2) 12.

PLANT CAPACITY FACTOR (3) 13.

FORCED OUTAGE RATE (4) 14.

SHUTI;0WNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE AND DURATION OF EACH):

15.

IF SilUTDOWN AT END OF REPORT PERIOD, ESTI!!ATED DATE OF STARTUP:

16.

PLANTS IN TEST STATUS (PRIOR TO C0121ERCIAL OPERATION) REPORT THE FOLLOWINC:

DATE LAST DATE REASON FOR FORECAST ACllIEVED DIFFERENCE INITIAL CRITICALITY 11/11/73 INITIAL ELECTRICAL 12/5/73 POWER GENERATION 5/15/74 IDIERCIAL OPERATION (1) REACTOR AVAILABILITY FACTOR = 110URS REACTOR WAS CRITTCAL

  • 100 GROSS Il0URS IN REPORTING FERIOD (2) PLANT AVAILABILITY FACTOR = _ HOURS CENERATOR ON-LINE
  • 100 GROSS !!OURS IN REPoliTIT.G PERIOD (3) PLANT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED CURRENTLY LICEN5ED l'0WLR LEVEL
  • GROSS 110URS IN REPORTING PERI
  • (4) FORCED OUTAGE RATE = FORCED OUTACE 110URS
  • 100

~

HOURS GENERATOR OU-LINE + FORCEDMT7d;1f110'URS

~

s _

~~

e.--.-

9.

s s

N SLM:ARY In:IT NAE Odonee Unit 2 DATE April 10, 1974 4

FIFORT MONTH March, 1974 i

PLANT SHUTDOWNS TYPE MET *40D OF F-TORCED DUPATION SHUTTIND DOL'N NO.

DATE S-SuiEDULED (110URS)

FIASON (1)

THE REACTOR (2)

CO:MNTS 3

740122 F

754' A

B i

(1) REASON:

(2) 1:ETHO3:

A-EQUIPMENT FAILURE (EXFLAIN)

A- ?UO*UAL B-MAINT. OR TEST B- !:/.iUAL SCFRi C-REFUELING C.8UTO'1ATIC SCRAM D-REGULATORY RESTRICTION E-OPE:tATOR T:'AINING AND LICESSE ext';INATION F-ADi!!!:ISTRATIVE G-OPERATIONAL ERROR (EXPLAIN) i

.