ML19317H099

From kanterella
Revision as of 06:41, 1 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Ack Receipt of Insp Rept 50-313/73-02 on 730116-19.No Proprietary Info
ML19317H099
Person / Time
Site: Arkansas Nuclear 
Issue date: 03/23/1973
From: Phillips J
ARKANSAS POWER & LIGHT CO.
To: Jennifer Davis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19317H100 List:
References
NUDOCS 8004140580
Download: ML19317H099 (2)


Text

  1. '

O .

g -

ARKANS AS POWER & LIGHT COMPANY STM AVENUE ANQ AtNE STREET

  • AtNE SLUFF. AAKANSAS 71801 e (5011534-1330 March 23,1973 Mr. John G. Davis, Director Directorate of Regulatory Operations - Region II United States Atomic Energy Commission 230 Peachtree Street, N.W. - Suite 818 Atlanta, Georgia 30303

REFERENCE:

Arkansas Nuclear One - Unit 1

. Site Inspection Report RO:II:VLB '

50-313/73-2

Dear Mr. Davis:

We have received the subject inspection report c.onducted by Messrs.

Sw.n and Conlon on January 16-19, 1973, and forwarded to us with your letter of March 7, 1973. This report has'been reviewed as requested in your letter and does not contain proprietary information.

Yours truly, ,

-) r (; /[15 '

--;,r;g 9 J. D. PHILLIPS Vice President & Chief Engineer JDP: NAM:mb U.

8004140Sgp TAX P AYING. INVESTQ A QWNEQ MEMSGR MIDDLE SQUTH UTILITIES SYSTEM

m r.

1 i

Letter from Arkansas Power and Light Company

dated March 23, 1973 - 50-313/73-2 APR 2 1973 DISTRIBUTION

J J. B. Henderson, RO:HQ J. G. Keppler, RO:HQ -

-^ -[p3>RO:dQ (5)

Directorate of Licensing (13)

DR Central Files Regulatory Standards (3)

PDR Local PDR NSIC .

OIS, OR ,

State 9

.3 : -

N\'

f t '!n/

t -

,;

O V

,- -