ML19317H099
| ML19317H099 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 03/23/1973 |
| From: | Phillips J ARKANSAS POWER & LIGHT CO. |
| To: | Jennifer Davis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19317H100 | List: |
| References | |
| NUDOCS 8004140580 | |
| Download: ML19317H099 (2) | |
Text
- '
e H EL PIN G BUILO ARKANSAS O
g ARKANS AS POWER & LIGHT COMPANY STM AVENUE ANQ AtNE STREET
- AtNE SLUFF. AAKANSAS 71801 e (5011534-1330 March 23,1973 Mr. John G. Davis, Director Directorate of Regulatory Operations - Region II United States Atomic Energy Commission 230 Peachtree Street, N.W. - Suite 818 Atlanta, Georgia 30303
REFERENCE:
Arkansas Nuclear One - Unit 1 Site Inspection Report RO:II:VLB 50-313/73-2
Dear Mr. Davis:
We have received the subject inspection report c.onducted by Messrs.
Sw.n and Conlon on January 16-19, 1973, and forwarded to us with your letter of March 7, 1973. This report has'been reviewed as requested in your letter and does not contain proprietary information.
Yours truly,,
-) r (; /[15 '
--;,r;g 9
J. D. PHILLIPS Vice President & Chief Engineer JDP: NAM:mb U.
8004140Sgp TAX P AYING. INVESTQ A QWNEQ MEMSGR MIDDLE SQUTH UTILITIES SYSTEM
m r.
1 i
Letter from Arkansas Power and Light Company 50-313/73-2 APR 2 1973 dated March 23, 1973 DISTRIBUTION:
J J. B. Henderson, RO:HQ J. G. Keppler, RO:HQ
-^ -[p3>RO:dQ (5)
Directorate of Licensing (13)
DR Central Files Regulatory Standards (3)
PDR Local PDR NSIC OIS, OR State 9
.3 : -
N\\'
f t '!n/
t O
V
,- -