ML19331C651

From kanterella
Revision as of 17:34, 31 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Application for Amend to Licenses DPR-57 & NPF-5,revising Offsite & Unit Organization Charts to Reflect Recent Changes in Company Organization & Clarify Senior Reactor Operator Requirements for Personnel
ML19331C651
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/12/1980
From: Widner W
GEORGIA POWER CO.
To:
Shared Package
ML19331C652 List:
References
NUDOCS 8008190265
Download: ML19331C651 (1)


Text

f a w;a n erc r=a~

230 Pea.**rea $*reat p s c ce eu asas 1 v'a ^2ec74 30 9'2

. e m c 2 52: m w.a. w,on., GeorgiaPower August 12, 1980 ljl3."3[,',l,["' Virage. , ,

Tills DOCUMENT CONTAINS U. S. Nuclear Reculatory Commission Office of Nuclear Reactor Regulation P00R QUAUTY PAGES Washington, D. C. 20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 ORGANIZATIONAL CHANGE Gentlemen:

Pursuant to 10 CFR 50.90 as required by 10 CFR 50.59(c)(1), Georgia Power Company hereby proposes amendments to Plant Hatch Units 1 and 2 Technical Specifications (Appendix A to the Operating Licenses). The proposed amendments consist of revisions to offsite and unit organization charts. These revisions will reflect recent changes in Company organization and clarify Senior Reactor Operator (SRO) requirements for onsite personnel.

Attachment I contains a determination of amendment class for the proposed amendment. Attachment 2 contains the proposed amendment for Unit 1 and Attachment 3 contains the proposed Unit 2 amendment.

In addition to the Technical Specification revisions, we are including for information an organization chart which illustrates the division of responsibility between the two assistant plant managers. Minimum staffing requirements are shown as solid lines. Dotted lines represent current personnel in excess of minimum requirements.

l We request your early review and approval of this administrative action.

Very truly yours,

}-l ~.*c .': .. -

W. A. Widner l

REB /mb Q[

l Attach =ents 7 Swor to and subscribed before =e this 12th day of August, 1980. ///

l L, , i [d lxu, W 6ch.'[?yoo.00 Notary Public notary put,<., Georp, state at Large My Cwc.m Eagares Soot. 20,1983 xc: Ruble A. Thomas George F. Troweridge, Esquire R. F. Rogers, III

,8008190 2 66 P