MONTHYEARHL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5493, Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant HL-5475, Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5447, Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5416, Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5393, Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5364, Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 2 HL-5332, Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant1997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant HL-5314, Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant1997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant HL-5296, Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5283, Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 2 HL-5265, Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5249, Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 2 HL-5237, Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20116J3821996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5202, Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20112J0661996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Ehnp ML20116J3971996-05-31031 May 1996 Revised MOR for May 1996 for Ei Hatch Nuclear Plant Unit 1 ML20112J0691996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant ML20116J3901996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant Unit 1 ML20111B0061996-04-30030 April 1996 Monthly Operating Repts for April 1996 for Ei Hatch Nuclear Plant HL-5144, Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant1996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant ML20111B0131996-03-31031 March 1996 Revised Pages E2-4 for March 1996 for Ei Hatch Nuclear Plant Unit 2 ML20101B1911996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5111, Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant ML20101B2001996-01-31031 January 1996 Revised Page E1-2 for Monthly Operating Rept for Jan 1996 for Ei Hatch Unit 1 HL-5098, Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant HL-5085, Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant1995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D3061999-10-13013 October 1999 SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A6641999-09-13013 September 1999 Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With ML20210J9631999-08-0202 August 1999 SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9271999-08-0202 August 1999 SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal Binding HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207E7631999-06-0303 June 1999 Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 Acceptable HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with ML20206G1691999-05-0404 May 1999 SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii) HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207M1891999-03-11011 March 1999 SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential Weld HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20206P6981999-01-0707 January 1999 Ehnp Intake Structure Licensing Rept HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20196J4931998-12-0707 December 1998 Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15 HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With ML20155B6121998-10-28028 October 1998 Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20153G2481998-09-24024 September 1998 SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) Request ML20239A2531998-09-0303 September 1998 SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 Encl HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20238F7131998-08-31031 August 1998 9,change 2 to QAP 1.0, Organization HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5657, Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures1998-07-30030 July 1998 Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures ML20236W3441998-07-30030 July 1998 Safety Evaluation Accepting Relief Requests for Second 10-yr ISI for Plant,Units 1 & 2 ML20236V5191998-07-28028 July 1998 Safety Evaluation Accepting Proposed License Amend Power Uprate Review ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20236L1821998-07-0707 July 1998 Safety Evaluation Accepting 980428 Proposed Alternative to ASME Boiler & Pressure Vessel Code,Section Xi,Repair & Replacement Requirements Under 10CFR50.55a(a)(3) HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20248B8651998-05-15015 May 1998 Quadrennial Simulator Certification Rept HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20216B2711998-02-28028 February 1998 Extended Power Uprate Safety Analysis Rept for Ei Hatch Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20199B0561997-12-31031 December 1997 Rev 0 GE-NE-B13-01869-122, Jet Pump Riser Weld Flaw Evaluation Handbook for Hatch Unit 1 HL-5581, Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 21997-12-31031 December 1997 Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20212A1981997-10-16016 October 1997 Safety Evaluation Denying Licensee Request for Relief from Implementation of 10CFR50.55a Requirements Re Use of 1992 Edition of ASME Code Section XI for ISI of Containments ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H5311997-10-0101 October 1997 Rev 2 to Unit 1,Cycle 17 Colr ML20211H5251997-10-0101 October 1997 Rev 3 to Unit 1,Cycle 17 Colr 1999-09-30
[Table view] |
Text
, . .
(,!Ghti lill,illR as DD c-23 0 N OPERATING DATA REPORT - 1 M
CO DOCKET H0. 50-366 DO g"
0
_ _ _ . . . . . - . . DATE 07-10-81
- COMPLETED BY DEHVER ATWOOD TELEPHONE (912) 3o7-7781 x 203 k
06 _.__- -_ .-
~~' ~~ ' " ' ~ ~ ' ' ' ' ~ ' ' ' ' * ~ ' '
~ ~ ~ - ~ ' ^ * * ~ ' ' * * ~ ~ ~ ~ ' ~~ ****~ '
Oo OM~~~~
~
~~~~~ ~~' ~ ~ ~ " ' * * ~ ~ '
gJ'~P F R A T 1 H G S T A T'~U'~S~ ' ' '
OOnit . . Hanet E.1.Hstch Huclear Plant Unit 2
. . _ . _2436_ _ _
Licensed Thermal Pouer (MWt)f MWe): 817.0 .
Hs.n sp la t e .Ra t in g ( Gros s
- Des ign_Electr ical _ Rati ng (Het MWe1:MWe): 784.0 ._
- Maxinun Dependable. Capacity (Gross * * ***************,**************************************
, Maximun Dependable C a p a c i,t y,,( N e t MWe): 772.7 Number _3_Thr_ough_7) Since Last, Report, Give Reasons:
4 .8I r Ch an g es _0 c cur _ i n. Ca pac i t y R ot h.ngs,( It en s F
- 9. Pouer Level To Which_ Restricted, If Any (Het MWe ):
h i10. Reasons For Restrictior.s, If Any* _ _ .
W-L -~ ~~ ~~~ ~'
This Month Yr.-to-Date Cumulative p...___ ___
4343 15960
>1 1 . Hours In Peporting Period 720 _ . 2895.0 11128.8
_ _ _____ _ , _ 720.0 L
j 12. Number Of Hours Peactor Was Cr i t i ca l' 0.0 O .,0, 0.0,__ _10449.7 ,. _
I13. Reactor Reserv' Shutdoun Hours .715.8 _
_ , _ 2761.3 ._ __
0.0
>14.
p Hours Generator On-Line _, . ._____
0.0 0.0 23074833 i 15. Unit Reserve Shutdoun Hours 1578924 5976935 I16. Gross Thernal Energy Generated (HWH ) 1924050 7591330 496780 7231703
>17. Gross Electrical Energy Generated (MWH) 474358 1829589 65.5 18._Het Electeical En e rgy Gen er a te d ( MWH_) 99.4 63.6 65.5
- 19. Unit Service Factor 99.4 63.6 L8.6
>20._ Unit Availability Factor _
85.3 54.5 57.8
_21. Unit _ Capacity Factor (Using MDC Net). _
84.0 53.7
- 22. Unit Capacity Factor ( Us i ng DER Het) 0.6 12_.1.
11.9
>23._ Unit _ Forced 0.utage Rate Scheduled 0ver Hext 6_ M on th s ( Typ e, Date, and Duration of Each ): -_ -
_2 4 ,.__S h u_t d o u n s - . - - ---
- 25. If Shut Doun At End Of R e p o__r t_ P e r i o d , _ Estinated Date_of Startup: Forecast Achieved
- 26. Units In Test Status (Prior to Connercial Operation): _ . . _ . - - - . _ . ~ . .
._ INITIAL CRITICALITY _ _ _ . . _ . _ . . _..______ ... .._,_.,_,... ......____. __
!HITIAL ELECTRICITY . __ - .. __. _ _ . _ . . . _ _ _ _ _ _ . . _
.C O M M E R C I A L _ D P E R A T.I D H.- _ _ _
( 9 / 7. 7 ).-
~ -.. -
- - - - . . __._ . . . - ._, ~ ~ -
, ~. . ~ .. .. .~.~ ....
...nn.n-._..... _ - . . . - - . . _ . . _ - . . . _ . .-
- . _ _ _ _ . . _ _ . , . . _ . , , - _ . . . _ - .*4.W&r'**
^' . . W. e.M-...D N .6 64.h. h.'N 6 .W .*M..- WP .N-"'-
.r*_ ..m,."-.h4N .WWW.M.
W_W.g.fum.'.p... ' . . +'_m. hee.- . ..i. ".
..WW--
W6W>
H 6 MM'. ~
.W _-e._.. .
-g
~ M & M .W.9 .
- . fI g
( N ,] ..l* h .
AVEP4GE DAILY UNIT POWER LEVEL ,
~ - ~ -
DOCKET NO. 50-366 P
._.__ _ _ _ _ . . ._- .___ .. ~ '- ~ ~ ~ ~ ' ~ ~ " '~ - - ~ - ~ ~ ~ ' ~ ~ - '- ~ ~~~~~ ~~ ~~ ~-~
~ - - ~'
DATE 07-10-81 COMPLETED BY DEHYER ATu00D TELEPHONE ( 912 ) 367-7781 x 203 06 81
- - - ~
M 014T H -
" - - ~ ~- ~ ~ ~ ~ ~ -- - ' -- - - - ' ~~~~
TiW AVER A C FD A I LY' P OUE R T EV EL-- D'A Y '-' AVE R AC E D AI LY P O W E R T E V E L~ ~ ~"~ ~-
~
(MWe-Net) ~ ~~
~~ ~ ~
~~ P (MUe-Het)~
~ ~ ~~ ~ ~ ~~ ~ ~ ~ ~~ ~
- 738~~ ~-~1 7 " -- - ~ - ~'~~ -~~ 6 7 2 ~ ~
~ - - ~ ~ ~ ~ -~ - ' -- ' ' ' ' - ~~~-" --~ - - ' - ~~ ~ ~~~=
~ -~' -- ' ' ~
~ -' ~- ~~ ' ' - - ~ '
675
~ ~
._.2-~-~~~'-~~-~~'~~~M ~~~
18 ~ -- ~ ~ -
3~ 734 19 676 g
~
. g . _._ . . __ _ _._ _ _.. _ ._ __. ..._. _ _ . _ .. _ _ . _ - . ._._ _ . . - ___.
- ~ - - - ~ ~ ~
~ ~ ~ ~
~ ~ ~ --
~ 7?' -.
21 449 2 3 ' - - ~ ~~ ~ -~ ~ 657 ~- ~~ ~
_ _ . .__ -- '~ ~~ ~ -- ~ - ~ ~ ~ ~ ~~ '~~
-- ' ~ ~ -~ ~ ~ ~ ~ ~ ~
24 676
~
.__._q _. . .' 731 - ~ ~~-- ~~
630 25 673
~ ~
___9.____.~- ~
~ ~~~ - - ~ ~ - - ~ ~ ~ ~ ~~ - ~ ~ - - ' ~
10 439 ~-- 2 o ---
.__ _e.. __. ' --' -- ^ ~ - '
665'~- -~~~- - - - ~~~~ ~' ' ~~ ~
545
~ '- - ~
493
~ '~~ --~
-'27
~
._.g______ _._ _ ._ .-. _ . ~
28 679
' ~ ~
1J - 6 3 T 2 9 ~ ~- ~ - ' 6 8 7 - --~'
--~~~ - - - - ~ ~~~ - ~
4e_.~ ~ ~ ' - - ~ ~ 688
. _ . - -~ ~ -- ~ ~ ~ ~
683
- - ~ '- ~ ~
3 0. -
__. ~ - ~ ~ ~' ~ ~
- 673 ~ 31 g 7 g-- = --
. _.__ .__=_ ___ _ _ _. ... . .._ - _ ._ _ _ _ . .
) . __ . _.
.u- 6.,we_ .-p4.msmisannee_--. - -.+e. = maeai-+ , - e s. e e. . . -gm.mmmmee.e.-- ,ga eg,. +e .e .__e . _ e _. _ . . _
- We M4e .'th*.* *N" mW M we9 we.S.96 ea em _ . 6 ew6N_Ogw qw.' ee geee -.e_e e= +--un m e Ne-e .- e..em em.w aw= ** . -_m ._i-p 6-o w - . ee.-.-e...ee%--,. -- m_.- -a-.,- -m-- 4.. . . . . . .e.- - - - .-eum.. .e..
.-.-e - e e.-. -=_e.- - * = = . .
. 4 4-+-- _-.e_em+
6 e'h8 . W We m & Oh e41u.mmu. .w 6w e6*- g sum.Wne-- NM M *S W _SW hem Se h49.hm. g e.- M-* . N .h @M -Wwemum@_-W*.W9 *Gue.N e.-_.- .e ._ -m,, -+- e -+.-_ - m. e-h- =e.-.e us-. .. -e e-==+ =em. .m--a ee . - w- a me.
1 b ____ . _ . . _ _ _ _ . ._ _ _ __ _ _. . . _ ___. _ _
1
-- ._ ... .-_ __ __.- . __. __. _ -_e . _ .
-.-- -4ew-e . e._w_- .-e+.. =. - . . . _ m+- .= - _e- w. e amm = m - - = -i. =_- --
-.*.mmmemmese--w_,. gum e
..=u.wige .e w e====%- ++- hi.ow . -h- e - ee- _ -e e m.mm.e eee_ = . e-_ mm. m.
emp e ai sim eme.up eee n m. m ene. ump _e agem_ am. .==*e= ___ pen.e e-6 wee-.se.s- emmee _ .,=.e e-.,e-.-g>*e.=e.e-w=_.m -m l
t .
+ _ - . - . - . _ _ ._ .- - -. - . - _. ._. . ._ . _
1
._ . ._ ... . . - -. . ... - - _ -.-e _ _..._ . .
1 1 --
DOCKET NO. 50-366 UNIT SHLTDOWNS AND POWER REDUCTIONS UNIT NAME Hatch 2 -
DATE 7-10-81 y COMPLETED BY D. G. Atwood REPORT MONTil June ,81 TELEPHONE 912-367-7851 w B E Date g
,5 ? };; Yh
}o ,j 5 Licensee Eg jg Cause & Corrective No. 3g Event (3 g3O Action to H y5 5 j gi g Report # mO g Prevent Recurrence .
3 81-48 810609 F 6.5 A 5 NA HC HTEXCH Load reduction due to loss of conden-ser vacuum and f,looded SJAEs 81-49 810610 F 4.2 A 1 NA HC HTEXCH Off line to stabilize condenser vacuum 81-50 810610 F 38.4 A 5 NA HC HTEXCH Recovery from #81-49 81-51 810613 S 6.3 B 5 NA HA TURBIN Load reduction to p'rform e weekly tur-bine test '
81-52 810620 F 20.43 A 5 NA HF HTEXCH Load reduction to allow inspection of circulating water boxes 81-53 810626 S 1.'3 8 5 NA HA TURBIN Load redu.ction to perform weekly turbine test 81-54 810626 S 21.8 B 5 NA Z'Z CONROD Load reduction for rod sequence ex-j change 1 2 3 4 i F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A. Equipment Tailure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C-Reiecling 3-Automatic Scram. Event Report (LER) File (NUREG-D. Regulatory Restriction 4 -Continuations 0161)
E-Operator Training & License Examination 5-Icad Pcduction F Administtativ; 5 G-Operational Error (Explain) 9-Other (Explain) Exhibit I- Same Source (9/77) 1101her(Explain)
^
,- 7 ~ J _
x.
NARRATIVE REPORT UNIT 2 June 1st Load reduced due to minor steam leaks and feedwater heater problems ,
June 6th Load reduced at 0025 to perform weekly turbine test; also reduced due to minor steam leaks and feedwater heater problems June 9th Reduced load at 0948 due to loss of vacuum due to flooded SJAE. Load also reduced due to minor steam leaks and feedvater heater problems June 1001 1155 unit off line to stabilize condenser vacuum; 1605 unit on line but load still reduced due some to minor steam leaks and feedwater heater problems Juen lith Load reduced due to vacuum problems, minor steam leaks and feedwater heater problems June 13th At 0026 load reduced to perform weekly turbine test; 0305 increasing load from weekly turbine test, but still operating at reduced load due to cond. vac. problems and feedwater beater problems June 14th At 0839 load was reduced to lower cond temp to prevent vacuum loss; feedwater heater problems still occurring l
June 20th At 2317 loid was reduced to inspect circ water boxes; feedwater heater problems and vacuum problems still occurring June 21st At 0035 stopped decreasing load te perfora daily turbine ^est; 0045 resumed decreasine load at 0245 stopped decreasing load; 1400 started increasing load but feedwater heater and vacuum problems still occurring June 22nd At 0830 load reduced per SCSI request June 23rd 1000 decreasing load to help alleviate vacuum problems resulting from increased ambient temp; 1910 increasing load; feedwater heater problems still occurring June 26th At 2110 load reduced in order to perform week-
. ly turbine test; 2235 load reduced for rod sequence exchange; feedwater heater and vacuum
- problems still occurring i .
l T
~~..
HATCH 2 SAFETY-RELATED MAINTENANCE REQUESTS TO BE REPORTED FOR JUNE 1981 No MRs were closed out for Unit 2 during the month of June.