| Site | Start date |
---|
10 CFR 50.69 Implementation Inspection (Limerick 2020) | Limerick | 10 February 2020 |
2019 Ginna SRO Retake Exam Inspection (Ginna 2019) | Ginna | 21 July 2019 |
2019 Quad Cities Retake Exam Inspection (Quad Cities 2019) | Quad Cities | 22 July 2019 |
50.59 Inspection (Arkansas Nuclear 2019) | Arkansas Nuclear | 18 November 2019 |
50.59 Inspection (Beaver Valley 2019) | Beaver Valley | 5 August 2019 |
50.59 Inspection (Braidwood 2020) | Braidwood | 13 January 2020 |
50.59 Inspection (Browns Ferry 2020) | Browns Ferry | 4 May 2020 |
50.59 Inspection (Brunswick 2020) | Brunswick | 18 May 2020 |
50.59 Inspection (Byron 2020) | Byron | 31 August 2020 |
50.59 Inspection (Calvert Cliffs 2020) | Calvert Cliffs | 15 June 2020 |
50.59 Inspection (Calvert Cliffs 2021) | Calvert Cliffs | 21 June 2021 |
50.59 Inspection (Catawba 2020) | Catawba | 3 February 2020 |
50.59 Inspection (Clinton 2021) | Clinton | 1 February 2021 |
50.59 Inspection (Columbia 2020) | Columbia | 13 April 2020 |
50.59 Inspection (Cook 2020) | Cook | 13 July 2020 |
50.59 Inspection (Cooper 2019) | Cooper | 16 September 2019 |
50.59 Inspection (Davis Besse 2020) | Davis Besse | 23 March 2020 |
50.59 Inspection (Diablo Canyon 2020) | Diablo Canyon | 9 March 2020 |
50.59 Inspection (Duane Arnold 2019) | Duane Arnold | 2 December 2019 |
50.59 Inspection (Ginna 2020) | Ginna | 14 September 2020 |
50.59 Inspection (Grand Gulf 2021) | Grand Gulf | 17 May 2021 |
50.59 Inspection (Hope Creek 2020) | Hope Creek | 13 December 2020 |
50.59 Inspection (Indian Point 2020) | Indian Point | 26 October 2020 |
50.59 Inspection (Limerick 2020) | Limerick | 20 July 2020 |
50.59 Inspection (McGuire 2019) | McGuire | 15 July 2019 |
50.59 Inspection (North Anna 2020) | North Anna | 6 July 2020 |
50.59 Inspection (Palisades 2019) | Palisades | 28 October 2019 |
50.59 Inspection (Palo Verde 2020) | Palo Verde | 3 February 2020 |
50.59 Inspection (Peach Bottom 2019) | Peach Bottom | 22 September 2019 |
50.59 Inspection (Perry 2019) | Perry | 12 August 2019 |
50.59 Inspection (Prairie Island 2020) | Prairie Island | 22 June 2020 |
50.59 Inspection (River Bend 2021) | River Bend | 25 January 2021 |
50.59 Inspection (Saint Lucie 2020) | Saint Lucie | 16 November 2020 |
50.59 Inspection (Saint Lucie 2021) | Saint Lucie | 1 March 2021 |
50.59 Inspection (Salem 2021) | Salem | 13 June 2021 |
50.59 Inspection (Seabrook 2021) | Seabrook | 16 May 2021 |
50.59 Inspection (Sequoyah 2021) | Sequoyah | 8 March 2021 |
50.59 Inspection (South Texas 2020) | South Texas | 11 May 2020 |
50.59 Inspection (Summer 2019) | Summer | 4 November 2019 |
50.59 Inspection (Turkey Point 2021) | Turkey Point | 1 February 2021 |
50.59 Inspection (Waterford 2021) | Waterford | 5 April 2021 |
50.59 Inspection (Watts Bar 2021) | Watts Bar | 29 March 2021 |
95001 SUPPLEMENTAL- EP Inspection (Watts Bar 2019) | Watts Bar | 29 July 2019 |
95001 Supplemental- 2 White PIs Inspection (Grand Gulf 2019) | Grand Gulf | 8 July 2019 |
ALARA Inspection (Braidwood 2021) | Braidwood | 16 February 2021 |
ALARA Inspection (Byron 2019) | Byron | 16 September 2019 |
ALARA Inspection (Byron 2020) | Byron | 12 October 2020 |
ALARA Inspection (Callaway 2020) | Callaway | 18 May 2020 |
ALARA Inspection (Calvert Cliffs 2020) | Calvert Cliffs | 6 January 2020 |
ALARA Inspection (Clinton 2021) | Clinton | 1 February 2021 |