ML19249D809

From kanterella
Revision as of 21:10, 23 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 79-063/03L-0
Date released: 09/20/2019 Download: ML19249D809


LER 79-063/03L-0:on 790824,daily Core Parameter Check Hat Revealed That Linear Heat Generation Rate Was 13.69 Kw/Ft or Greater than Allowable Max of 13.4 Kw/Ft.Caused by Not Completing All Preventive Measures of LER 1-79-022
ML19249D811
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 09/20/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19249D811 (1)
Forwards LER 79-063/03L-0
ML19249D808
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 09/20/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19249D808 (1)