ML19308D114

From kanterella
Revision as of 08:09, 20 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards RO-77-02
Date released: 11/18/2019 Download: ML19308D114


RO-77-02:on 761220,suction Valve Found Shut During RCS Heatup in Raising Pressure to 150 Psig,As Makeup Pump 3C Was Started.Caused by Failure to Perform Visual Check Before Starting Pump.Operators Cautioned
ML19308D266
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/11/1977
From: Stewart W
FLORIDA POWER CORP.
To:
References
Download: ML19308D266 (1)
Forwards RO-77-02
ML19308D113
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/11/1977
From: Stewart W
FLORIDA POWER CORP.
To: MOSELEY N C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
Download: ML19308D113 (1)