ML19316A483

From kanterella
Revision as of 23:02, 19 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards RO-269/77-30
Date released: 11/26/2019 Download: ML19316A483


LER 77-030/03L-0:on 771220,2.8 Gallon Per Minute Leak Indicated by Reactor Bldg Normal Sump Level rate-of-change Monitor.Caused by Valve 1RC-2 Packing Failure.Valve Repacked & Tested Using PT/1/600/10 RCS Breakage
ML19316A485
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 01/19/1978
From: Ken Wilson
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19316A485 (1)
RO 269/77-30:on 771220,primary Leak Through Pressurizer Spray Bypass Valve RC-2 Indicated.Caused by Packing Leak on Pressurizer Spray Bypass Valve.Valve RC-2 Repacked & Tested for Leaks
ML19316A484
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 01/19/1978
From:
DUKE POWER CO.
To:
References
Download: ML19316A484 (1)
Forwards RO-269/77-30
ML19316A482
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 01/19/1978
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19316A482 (2)