ML19322A154

From kanterella
Revision as of 06:28, 19 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Final Rept of Significant Constr Deficiency No 8 Re Containment Electric Penetration Bolting Failure
Date released: 12/02/2019 Download: ML19322A154


Bolted Connections That Connect Horizontal Channel Sections of the Termination Subassembly to the Header Mounting Brackets Were Loose or Disengaged.Termination sub-assembly Connections Were Redesigned to Use Welded Pemnuts
ML19322A157
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/27/1978
From:
ARKANSAS POWER & LIGHT CO.
To:
References
Download: ML19322A157 (1)
Forwards Final Rept of Significant Constr Deficiency No 8 Re Containment Electric Penetration Bolting Failure
ML19322A153
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/29/1978
From: Aswell D
LOUISIANA POWER & LIGHT CO.
To: SEYFRIT K V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19322A153 (1)