Whiteville to Fayetteville
ML051220140
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/30/2005
From: Kozyra J
Progress Energy Carolinas, Progress Energy Co
To: Emch R
NRC/NRR/DRIP/RLEP
References
Download: ML051220140 (3)


Text


,1Richard Emch - FW: Whiteville to Fayetteville Page Page 1 1tI Richard Emch FW: Whiteville to Fayetteville

-

I From: "Kozyra, Jan" <jan.kozyra~pgnmail.com>

To: "Richard Emch" <RLE@nrc.gov>

Date: Wed, Mar 30, 2005 1:53 PM

Subject:

FW: Whiteville to Fayetteville I have received the following from Tetra tech regarding the induced shock issue for the Whiteville-to-Fayetteville transmission line:

Tetra Tech NUS examined the plan and profile drawings (TD-1 1680, sheets 30A to 63) for the Whiteville-to-Fayetteville spans of the Brunswick-to-Fayetteville transmission line, identifying 30 paved road crossings. Almost all crossings had clearances greater than 40 feet at either 200 degrees Fahrenheit or 212 degrees Fahrenheit, depending on the specific drawing. Three exceptions had clearances as follows:

NCSR 2023 at 2900+76 39 feet NCSR 1134 at 3380+371 36 feet NCSR 119 at 3807+61 36 feet The spans used the standard medium tangent H-frame used by all the Brunswick transmission lines.

These specific road crossings were compared with previous analyses for Brunswick transmission lines, the lowest clearances of which had the following induced current.

Line Location Road Clearance Induced Current Whiteville 816+53 US 17

Richard Emch - FW: Whiteville to Favetteville -Page 2 i Richard Emch FW: Whiteville to Favetteville

- Pane 2 ii 35 feet 1.8 ma Jacksonville 1000+10 US 17 28 feet 1.9 ma Delco West 1431+38 SR 1849 27 feet 2.8 ma Delco East 1551+88 US 74/76 30.5 feet 1.8 ma Tetra Tech NUS concludes that given the similar construction, the clearances for the Whiteville-to-Fayetteville spans, ranging from 36 to 39 feet, would have lower induced current than those analyzed with clearances from 27 to 35 feet. Accordingly, the analysis results presented in Progress Energy's Environmental Report, Operating License Renewal Stage, Brunswick Steam Electric Plant would bound the impacts of the Whiteville-to-Fayetteville spans.

CC: 'Moore, Philip' <MooreP~ttnus.com>

c:\termp\qW)00001 .TMP Page11

.... . . . . . .. .

Mail Envelope Properties (424AF5B9.CBA: 9: 36026)

Subject:

FW: Whiteville to Fayetteville Creation Date: Wed, Mar 30, 2005 1:53 PM From: "Kozyra, Jan" <jan.kozyra@pgnmail.com>

Created By: jan.kozyra@pgnmail.com Recipients nrc.gov OWGWPOO2.HQGWDO01 RLE (Richard Emch) ttnus.com MooreP CC (Philip Moore)

Post Office Route OWGWPO02.HQGWDO01 nrc.gov ttnus.com Files Size Date & Time MESSAGE 1675 Wednesday, March 30, 2005 1:53 PM TEXT.htm 17070 Mime.822 1 Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed

Subject:

No Security: Standard