ML051660210

From kanterella
Revision as of 08:20, 9 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Tech Spec Pages for Amendments 226 and 221 the Deletion of Technical Specification Requirements to Maintain Hydrogen Recombiners and Hydrogen/Oxygen Monitors and Related Surveillance Requirements
ML051660210
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 06/14/2005
From:
NRC/NRR/DLPM
To:
Dick G F, NRR/DLPM, 415-3019
Shared Package
ML050960457 List:
References
TAC MC4498, TAC MC4499
Download: ML051660210 (2)


Text

PAM Instrumentation 3.3.3.1 SURVEILLANCE REQUIREMENTS


NOTES -----------------------------------

1. These SRs apply to each Function in Table 3.3.3.1-1. I
2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the other required channel in the associated Function is OPERABLE.

SURVEILLANCE FREQUENCY SR 3.3.3.1.1 Perform CHANNEL CHECK. 31 days SR 3.3.3.1.2 Perform CHANNEL CALIBRATION. 24 months I Quad Cities 1 and 2 3.3.3. 1-3 Amendment No.226 / 221

PAM Instrumentation 3.3.3.1 Table 3.3.3.1-1 (page I of 1)

Post Accident Monftoring Instrumentation CONDITIONS REFERENCED REQUIRED FROM REQUIRED FUNCTION CHANNELS ACTION 0.1

1. Reactor Vessel Pressure 2 E
2. Reactor Vessel Water Level
a. Wide Range 2 E
b. Narrow Range 2 E
3. Torus Water Level 2 E
4. Drywell Pressure
a. Wide Range 2 E
b. Narrow Range 2 E
5. Drywell Radiation Monitors 2 F
6. Penetration Flow Path.PCIV Position 2 per penetration E flow path(j)(1)
7. Torus Water Temperature 2 E I

(a) Not required for isolation valves whose associated penetration flow path Is isolated by at least one closed and deactivated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.

(b) Only one position indication channel is required for penetration flow paths with only one Installed control room indication channel.

Ouad Cities 1 and 2 3.3.3.1-4 Amendment No. / 226/221