MONTHYEARML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24073A3602024-03-13013 March 2024 Request for Additional Information (RAI) Alternative Request PR-03 Sixth Interval Inservice Testing Program ML24045A2892024-02-14014 February 2024 R. E. Ginna Nuclear Power Plant Acceptance Review: IST Relief Request for B Auxiliary Feedwater Pump ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23312A1302023-11-0707 November 2023 Final Rci/Rai - Constellation R. E. Ginna Nuclear Power Plant - Exemption from Security Rule (EPID L-2023-LLE-0029) (Email) ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22325A0052022-11-18018 November 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-273-A, Revision 2 ML22339A0032022-09-28028 September 2022 R. E. Ginna Nuclear Power Plant - Ginna: Acceptance Review: to Revise Technical Specifications (TS) TS 5.6.5, Core Operating Limits Report ML22269A4522022-09-22022 September 2022 R. E. Ginna Nuclear Power Plant - Acceptance Review: to Revise Technical Specifications (TS) TS 5.6.5, Core Operating Limits Report (COLR) ML22255A0132022-09-0909 September 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22138A1672022-05-16016 May 2022 R. E. Ginna Nuclear Power Plant - Acceptance Review TS to Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes (EPID-L-2022-LLA-0057) ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22116A0242022-04-25025 April 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, and Ginna Request to Adopt TSTF-246 ML22088A1562022-03-0202 March 2022 NRR E-mail Capture - Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5.b, the Core Operating Limits Report (COLR) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML21308A5592021-11-0404 November 2021 NRR E-mail Capture - NRC Request for Additional Information for Ginna Biennial EP Exercise Exemption Request ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21293A2342021-10-19019 October 2021 R. E. Ginna Nuclear Power Plant - Acceptance of Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, Section IV.F.2.C ML21293A1332021-10-19019 October 2021 R. E. Ginna Nuclear Power Plant - Acceptance of Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, Section IV.F.2.C ML21279A1122021-10-0606 October 2021 R. E. Ginna Nuclear Power Plant - Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, Section IV.F.2.c ML21273A1092021-09-30030 September 2021 R. E. Ginna Nuclear Power Plant - Acceptance Review - Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (EPID L-2021-LLR-0074 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21172A2702021-06-22022 June 2021 E-Mail Acceptance of Application - Risk Informed Completion Times in Accordance with TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, ML21172A2692021-06-22022 June 2021 E Mail Acceptance of Application to Adopt 10 CFR 50.69, _Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors (Epid_ L-2021-LLA-0092) ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21123A2442021-05-0303 May 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood/Byron/Ginna - Application to Address the Issues Identified in Westinghouse Documents NSAL-09-5 and NSAL-15-1 (L-2021-LLA-0066) ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21076A5152021-03-17017 March 2021 R. E. Ginna Nuclear Power Plant - RAI Steam Generator LAR to Revise Technical Specifications for Steam Generator Tube Inspection Frequency (EPID L-2020-LLA-0207) (e-mail) ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML21029A3302021-01-29029 January 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative Request to Use ASME Code Case N-885 ML20357A2232020-12-17017 December 2020 Update on Ginna POV - 3504A and 4562 (Email Request for Inspection Information) ML20350B5582020-12-14014 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC -Alternative Request for Documentation of Replacement of Pressure Retaining Bolting ML20335A5692020-11-30030 November 2020 R. E. Ginna Nuclear Power Plant - Acceptance Review: Alternative to ASME Code, Section XI ML20325A1002020-11-20020 November 2020 Acceptance Review: Force-on-Force Temporary Exemption Request ML20294A4942020-10-20020 October 2020 R. E. Ginna Nuclear Power Plant - Acceptance Review: to Revise Technical Specifications for Steam Generator Tube Inspection Frequency ML20276A1032020-10-0202 October 2020 R. E. Ginna Nuclear Power Plant - Acceptance Review - Exemptions from 10 CFR 2.109(b), Effect of Timely Renewal Application 2024-09-06
[Table view] |
Text
NRR-PMDAPEm Resource From: Thadani, Mohan Sent: Monday, October 27, 2014 3:23 PM To: Harding Jr, Thomas:(GenCo-Nuc)
Cc: Lilley, Michael:(GenCo-Nuc) (michael.lilley@exeloncorp.com); ONeal, Daniel
Subject:
RE: Ginna NFPA-805 call Attachments: Ginna follow up RAIs 10 27 14.docx Tom:
We had a good discussion of the NFPA-805 draft RAI during the conference call on 10/23/2014. As agreed with Michael Lilley, attached please find the finalized RAI to be used for response to NRC.
- Thanks, Mohan C Thadani Senior Project Manager Millstone, Ginna, and Constellation Fleet Plants Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-1476 Mohan.Thadani@nrc.gov 1
Hearing Identifier: NRR_PMDA Email Number: 1670 Mail Envelope Properties (Mohan.Thadani@nrc.gov20141027152300)
Subject:
RE: Ginna NFPA-805 call Sent Date: 10/27/2014 3:23:00 PM Received Date: 10/27/2014 3:23:00 PM From: Thadani, Mohan Created By: Mohan.Thadani@nrc.gov Recipients:
"Lilley, Michael:(GenCo-Nuc) (michael.lilley@exeloncorp.com)" <michael.lilley@exeloncorp.com>
Tracking Status: None "ONeal, Daniel" <Daniel.ONeal@nrc.gov>
Tracking Status: None "Harding Jr, Thomas:(GenCo-Nuc)" <thomas.hardingjr@exeloncorp.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 509 10/27/2014 3:23:00 PM Ginna follow up RAIs 10 27 14.docx 27379 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
Ginna RAIs PRA RAI 11.02.1 With respect to PRA RAI 11.02, provide additional information to evaluate main control room (MCR) fire risk, as well as discuss if abandonment is credited for fires outside the MCR. The following question addresses fires, both inside and outside the MCR, which could lead to abandonment due to loss of control (LOC). This RAI does not replace the work to which Ginna has committed to complete the response to PRA RAI 11.02 with respect to CCDP values for MCR abandonment.
a) Indicate if credit is taken for MCR abandonment for fires outside the MCR. If so, for what fire areas?
b) Summarize the feasibility study done for the alternate shutdown procedure. According to the RAI response on MCR abandonment for MCR fire risk, the alternate shutdown procedure will be revised such that the required fire actions are called from the existing EOPs as well as the fire procedures. Provide a conclusion regarding the feasibility of this procedure.
c) Identify the procedural criteria for abandonment due to LOC and discuss the process for how these criteria are implemented in the PRA d) The response to PRA RAI 11.02 indicates that for MCR fires leading to MCR abandonment the logic for abandonment was integrated into the logic model, and each scenario was treated specifically to the exact functional failures that the scenario caused. Ginna concludes that the continuum of complexity in their analysis covers the three bins in PRA RAI 11.02 as a result.
Provide a discussion on how fire affected equipment failure is included in the MCR abandonment scenarios for LOC driven abandonment. Include a description of how individual equipment, single spurious, and multiple spurious operational failures are developed for different scenarios. Questions to answer as a part of the discussion include the following: Do different abandonment scenarios have different sets of equipment failed, e.g. are there sets of ignition sources which fail different sets of equipment for abandonment? Was the treatment for fires outside the MCR due to LOC driven abandonment regarding this issue also applied to fires inside the MCR leading to abandonment due to LOC?
Please provide the answer to this question for MCR fires leading to abandonment due to loss of habitability as well.
e) Provide the range of CCDP/CLERP values used to estimate the MCR abandonment CDF and LERF for abandonment due to LOC according to the different fire areas.
Please distinguish between CCDPs for initiators which cannot be mitigated by remote shutdown operations (i.e. CCDP =1 always) and high CCDPs due to equipment failures (CCDP will exhibit a range), if this applies for your application
PRA RAI 19.1.1 With respect to the PRA RAI 19.1 response it is not clear how the qualitative reasons provided in the response are sufficient to address the large delta CDF exceedance due to the NUREG/CR-6850 fire ignition frequency sensitivity analysis. Please expand on the response to address the fire ignition frequency sensitivity risk results in accordance with the FAQ 08-0048.
FAQ 08-0048 states that for those cases where the results from this sensitivity analysis indicate a change in the potential risk significance associated with elements of the Fire PRA or plant change evaluations which affects the decisions being made (e.g., what is acceptable with the new frequencies from EPRI 1016735 might not be acceptable with the current applicable set from NUREG/CR-6850), the licensee must address this situation by considering fire protection, or related, measures that can be taken to provide additional defense-in-depth. The defense in depth measures to address the delta CDF exceedance may be supported by qualitative and/or quantitative considerations (e.g., relevant sensitivity analyses, delta-risk calculation method, etc.).
PRA RAI 22.01.1 The PRA RAI 22.01 response notes that the Fire PRA assumes no core damage from an ISLOCA if the flow loss is within the capacity of makeup flow. ISLOCA sequences may need to be considered for the Fire PRA model if core damage results from no recirculation and from associated impacted equipment. Please discuss the basis for not including ISLOCA sequences due to these aspects.
.