ML063110579

From kanterella
Revision as of 12:16, 23 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of Change in Level 1 Management at the University of Texas at Austin Nuclear Engineering Teaching Laboratory (NETL)
ML063110579
Person / Time
Site: University of Texas at Austin
Issue date: 10/27/2006
From: O'Kelly S
University of Texas at Austin
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML063110579 (1)


Text

Department of Mechanical Engineering

)* THE UNIVERSITY OF TEXAS AT AUSTIN Nuclear Engineering Teaching Laboratory *Austin, Texas 78758 512-232-5370 FAX 512-471-4589" http//www.me. utexas.edu/- netl/net.html October 27, 2006 Nuclear Regulatory Commission Attn: Document Control Desk Washington D.C., 20555

Subject:

Notification of Change in Level 1 Management at The University of Texas at Austin Nuclear Engineering Teaching Laboratory (NETL)

Reference:

Facility License R-129, Docket 50-602 Sirs:

President Larry R. Faulkner has retired from the University of Texas and been replaced by William Powers, Jr. President Powers has appointed Dr. Stephen Monti as the new Executive Vice-President and Provost. Both of these positions are Level I line management of the NETL research reactor The following is the list of Level 1 and Level 2 Line Management for the R-129 license.

President of the University of Texas at Austin William Powers, Jr.

Exec. Vice President and Provost Stephen Monti College of Engineering Dean Benjamin G. Streetman Department of Mech. Engineering Chair Joseph J. Beaman NETL Director Sheldon Landsberger NETL Associate Director David S. O'Kelly Please contact the NETL if you have any questions at 512-232-5373.

Sincerely,

.Sean 0 NETL Associate Director cc: NRC Correspondence Files A02-~