ML072040283

From kanterella
Revision as of 04:25, 23 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Revised Pages of Facility Operating License DPR-40 to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026
ML072040283
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 07/26/2007
From: Dyer J
Office of Nuclear Reactor Regulation
To:
Wang, A B, NRR/DORL/LPLIV, 415-1445
Shared Package
ML072040093 List:
References
EA-02-026, TAC MD4534
Download: ML072040283 (2)


Text

ENCLOSURE 1 REVISED PAGES OF RENEWED FACILITY OPERATING LICENSE NO. DPR-40 FORT CALHOUN STATION, UNIT NO. 1 DOCKET NO. 50-285 Replace the following page of the Renewed Facility Operating License with the attached revised page. The revised page is identified by the date of the letter issuing this page and contain marginal lines indicating the areas of change.

REMOVE INSERT Page 5 Page 5

G. Mitigation Strategy License Condition l l

Develop and maintain strategies for addressing large fires and explosions and that l include the following key areas: l l

(a) Fire fighting response strategy with the following elements: l

1. Pre-defined coordinated fire response strategy and guidance l
2. Assessment of mutual aid fire fighting assets l
3. Designated staging areas for equipment and materials l
4. Command and control l
5. Training of response personnel l l

(b) Operations to mitigate fuel damage considering the following: l

1. Protection and use of personnel assets l
2. Communications l
3. Minimizing fire spread l
4. Procedures for implementing integrated fire response strategy l
5. Identification of readily-available pre-staged equipment l
6. Training on integrated fire response strategy l
7. Spent fuel pool mitigation measures l l

(c) Actions to minimize release to include consideration of: l

1. Water spray scrubbing l
2. Dose to onsite responders l
4. This renewed license is effective as of the date of issuance and shall expire at midnight on August 9, 2033.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed by:

J. E. Dyer J. E. Dyer, Director Office of Nuclear Reactor Regulation Attachments: 1. Appendix A - Technical Specifications

2. Appendix B - Additional Conditions Date of Issuance: November 4, 2003 Renewed Operating License No. DPR-40 Revised by letter dated July 26, 2007