Category:Letter
MONTHYEARML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 ML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML24213A1412024-07-31031 July 2024 Requalification Program Inspection NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 NMP1L3591, Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request2024-05-18018 May 2024 Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request NMP1L3589, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-05-16016 May 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable ML24158A2052024-05-15015 May 2024 Annual Radioactive Environmental Operating Report NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 22024-05-15015 May 2024 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 IR 05000220/20240012024-05-10010 May 2024 Integrated Inspection Report 05000220/2024001 and 05000410/2024001 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds 05000410/LER-2024-001, Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum2024-05-0101 May 2024 Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report2024-04-30030 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report NMP2L2877, 2023 Annual Environmental Operating Report2024-04-19019 April 2024 2023 Annual Environmental Operating Report NMP2L2878, Core Operating Limits Report2024-04-16016 April 2024 Core Operating Limits Report ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24092A3352024-04-0101 April 2024 NRC Office of Investigations Case No. 1-2023-002 ML24074A2812024-03-14014 March 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3577, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-03-13013 March 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable IR 05000220/20230062024-02-28028 February 2024 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2, (Reports 05000220/2023006 and 05000410/2023006) IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation 05000410/LER-2023-001, Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater2024-01-30030 January 2024 Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000220/LER-2023-002, Average Power Range Monitors Declared Inoperable Due to Trip of Reactor Recirculation Pump 122023-12-15015 December 2023 Average Power Range Monitors Declared Inoperable Due to Trip of Reactor Recirculation Pump 12 NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station 2024-09-04
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NMP1L3484, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Reatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-15015 December 2022 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Reatment of Structures, Systems and Components for Nuclear Power Reactors NMP1L3482, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-12-15015 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML22298A0112022-10-25025 October 2022 License Amendment Request to Adopt Technical Specification Task Force TSTF-295-A, Modify Note 2 to Actions of (Post-Accident Monitoring) PAM Table To. RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration NMP1L3477, License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise.2022-08-12012 August 2022 License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise. NMP1L3467, License Amendment Request - Revision to Alternative Source Term Calculation for Main Steam Isolation Valve (MSIV) Leakage and Non-MSIV Leakage2022-06-29029 June 2022 License Amendment Request - Revision to Alternative Source Term Calculation for Main Steam Isolation Valve (MSIV) Leakage and Non-MSIV Leakage NMP2L2799, License Amendment Request - Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators2022-05-24024 May 2022 License Amendment Request - Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments NMP2L2780, Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-09-30030 September 2021 Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position NMP2L2762, License Amendment Request Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2021-05-26026 May 2021 License Amendment Request Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments NMP1L3369, Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0 Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-12-18018 December 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0 Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements RS-20-031, License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process2020-04-30030 April 2020 License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process NMP2L2716, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2019-12-26026 December 2019 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors NMP2L2706, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.2019-10-31031 October 2019 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. RS-19-044, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions2019-08-28028 August 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability NMP1L3278, License Amendment Request - Administrative Changes to the Technical Specifications2019-06-26026 June 2019 License Amendment Request - Administrative Changes to the Technical Specifications RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-06-25025 June 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program NMP2L2699, License Amendment Request to Revise Technical Specifications Main Steam Isolation Valve Leak Rate2019-05-31031 May 2019 License Amendment Request to Revise Technical Specifications Main Steam Isolation Valve Leak Rate RS-19-003, Application to Adopt TSTF-564, Safety Limit Mcpr.2019-02-0101 February 2019 Application to Adopt TSTF-564, Safety Limit Mcpr. NMP2L2694, Emergency License Amendment Request: One Time Extension to the High Pressure Core Spray Completion Time and Associated Surveillances2018-12-0606 December 2018 Emergency License Amendment Request: One Time Extension to the High Pressure Core Spray Completion Time and Associated Surveillances NMP1L3192, License Amendment Request - Revise Technical Specification 3.3.1 for Primary Containment Oxygen Concentration2018-06-26026 June 2018 License Amendment Request - Revise Technical Specification 3.3.1 for Primary Containment Oxygen Concentration RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement RS-17-161, Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR)2018-03-0101 March 2018 Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) NMP1L3188, License Amendment Request - Proposed Change to Remove Boraflex Credit from Spent Fuel Racks2018-02-0909 February 2018 License Amendment Request - Proposed Change to Remove Boraflex Credit from Spent Fuel Racks NMP1L3142, License Amendment Request - Revise Technical Specifications to Apply TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22017-12-15015 December 2017 License Amendment Request - Revise Technical Specifications to Apply TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 RS-17-137, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2017-11-0808 November 2017 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NMP2L2660, License Amendment Request - Safety Limit Minimum Critical Power Ratio Change2017-11-0303 November 2017 License Amendment Request - Safety Limit Minimum Critical Power Ratio Change NMP2L2652, License Amendment Request - Revise Surveillance Requirement 3.5.1.2 to Remove Note2017-08-22022 August 2017 License Amendment Request - Revise Surveillance Requirement 3.5.1.2 to Remove Note ML17164A1542017-05-31031 May 2017 Enclosure 4C - EAL Basis Document for Nine Mile Point Nuclear Station, Unit 1 ML17164A1552017-05-31031 May 2017 Enclosure 4D - EAL Front Matter for Nine Mile Point Nuclear Station, Unit 1 NMP2L2641, License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 02017-05-31031 May 2017 License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 0 ML17164A1532017-05-31031 May 2017 Enclosure 4B - EAL Red-Line Basis Document for Nine Mile Point Nuclear Station, Unit 1 NMP1L3158, Enclosure 4E - Procedure Matrix for Nine Mile Point Nuclear Station, Unit 12017-05-31031 May 2017 Enclosure 4E - Procedure Matrix for Nine Mile Point Nuclear Station, Unit 1 JAFP-17-0050, Exigent License Amendment Request to Revise Emergency Action Level HU1.52017-05-19019 May 2017 Exigent License Amendment Request to Revise Emergency Action Level HU1.5 ML17037C4192017-05-11011 May 2017 Amendment to Operating License/Change to Appendix a of Technical Specification Concerning Certain Repairs at Facility and Concomitantly to Allow a Continuation of a Slightly Lower Water Level in the Reactor... NMP2L2643, License Amendment Request-Adoption of TSTF-283-A, Revision 3, Modify Section 3.8 Mode Restriction Notes2017-04-0505 April 2017 License Amendment Request-Adoption of TSTF-283-A, Revision 3, Modify Section 3.8 Mode Restriction Notes RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process2017-03-28028 March 2017 Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process NMP2L2640, License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22017-02-28028 February 2017 License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 NMP2L2639, Supplement to License Amendment Request - Proposed Revision to Technical Specification in Response to GE Energy- Nuclear 10 CFR Part 21 Safety Communication SC05-032017-02-17017 February 2017 Supplement to License Amendment Request - Proposed Revision to Technical Specification in Response to GE Energy- Nuclear 10 CFR Part 21 Safety Communication SC05-03 2024-09-26
[Table view] Category:Technical Specification
MONTHYEARNMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NMP1L3482, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-12-15015 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML22298A0112022-10-25025 October 2022 License Amendment Request to Adopt Technical Specification Task Force TSTF-295-A, Modify Note 2 to Actions of (Post-Accident Monitoring) PAM Table To. ML22292A1312022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Technical Specification Bases, Rev. 69 RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration NMP1L3477, License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise.2022-08-12012 August 2022 License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise. NMP2L2780, Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-09-30030 September 2021 Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements NMP2L2762, License Amendment Request Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2021-05-26026 May 2021 License Amendment Request Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2020-06-22022 June 2020 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability NMP2L2718, Supplemental Information No.1 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 22019-12-12012 December 2019 Supplemental Information No.1 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls NMP2L2693, Technical Specification Bases, Rev. 572018-10-24024 October 2018 Technical Specification Bases, Rev. 57 NMP2L2664, Supplemental Information No. 2 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22018-01-12012 January 2018 Supplemental Information No. 2 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 NMP2L2652, License Amendment Request - Revise Surveillance Requirement 3.5.1.2 to Remove Note2017-08-22022 August 2017 License Amendment Request - Revise Surveillance Requirement 3.5.1.2 to Remove Note NMP2L2640, License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22017-02-28028 February 2017 License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 ML16309A4002016-10-24024 October 2016 Revision 47 to Technical Specification Bases, List of Effective Pages ML16309A4022016-10-24024 October 2016 Revision 47 to Technical Specification Bases, Section B2.0, Safety Limits (Sls) ML16309A4032016-10-24024 October 2016 Revision 47 to Technical Specification Bases, Section B3.0, Limiting Condition for Operation (LCO) Applicability ML16309A4052016-10-24024 October 2016 Revision 47 to Technical Specification Bases, Section B3.2, Power Distribution Limits ML16309A4012016-10-24024 October 2016 Revision 47 to Technical Specification Bases, Table of Contents ML16309A4132016-10-24024 October 2016 Revision 47 to Technical Specification Bases, Section B3.9, Refueling Operations ML16309A4082016-10-24024 October 2016 Revision 47 to Technical Specification Bases, Section B3.5, Emergency Core Cooling Systems (ECCS) and Reactor Core Isolation Cooling (RCIC) System ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. NMP1L3070, License Amendment Request - Reactivity Anomalies Surveillance2016-03-18018 March 2016 License Amendment Request - Reactivity Anomalies Surveillance NMP2L2592, Supplemental Information Regarding TSTF-425 License Amendment Request2015-09-24024 September 2015 Supplemental Information Regarding TSTF-425 License Amendment Request NMP1L3027, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)2015-05-12012 May 2015 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) ML15089A2312015-03-26026 March 2015 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) NMP1L3010, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)2015-03-26026 March 2015 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) NMP2L2576, License Amendment Request - Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual2015-03-23023 March 2015 License Amendment Request - Relocation of Secondary Containment Bypass Leakage Paths Table from Technical Specifications to the Technical Requirements Manual NMP2L2563, License Amendment Request - Primary Containment Isolation Instrumentation Technical Specification Allowable Value Change2014-11-17017 November 2014 License Amendment Request - Primary Containment Isolation Instrumentation Technical Specification Allowable Value Change ML14191A2552014-07-10010 July 2014 Nine Mile Point and Ginna, Unit 1 - Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process ML12156A3632012-06-0101 June 2012 Emergency License Amendment Request Pursuant to 10 CFR 50.90: Revision of the Main Steam Isolation Valve Allowable Leakage Rate Limit ML11306A2982011-10-27027 October 2011 Submittal of Revision 22 to the Final Safety Analysis Report (Updated), 10 CFR 50.59 Evaluation Summary Report, Technical Specifications Bases Changes, and Report Consistent with 10 CFR 54.37(b) ML11214A2142011-07-25025 July 2011 License Amendment Request, Extension of the Completion Time for Inoperable Diesel Generator - Response to NRC Request for Additional Information ML1109602832011-03-30030 March 2011 License Amendment Request Pursuant to 10 CFR 50.90: Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage ... ML0935000902009-12-0909 December 2009 License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery - Technical Specification 3.8.4, DC Sources - Operating ML0931602572009-10-26026 October 2009 Submittal of Revision 21 to the Final Safety Analysis Report (Updated), 10 CFR 50.59 Evaluation Summary Report, Technical Specifications Bases Changes, and Report Consistent with 10 CFR 54.37(b) ML0907802502009-03-0909 March 2009 Submittal of Amendment Request for Technical Specification Improvement to Revise Control Rod Scram Time Testing Frequency ML0906403012009-03-0303 March 2009 License Amendment Request Pursuant to 10 CFR 50.90: Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report ML0827502992008-09-29029 September 2008 Technical Specifications ML0802501622008-01-24024 January 2008 Response to NRC Request for Additional Information Regarding Nine Mile Point Nuclear Station, Unit No. 1, Revision of Rod Worth Minimizer Limiting Condition for Operation During Startup ML0726401032007-09-19019 September 2007 License Amendment Request for Adoption of TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities. ML0721906052007-07-30030 July 2007 Application for Technical Specification Change TSTF-477, Rev. 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process ML0721205922007-07-23023 July 2007 Application for Technical Specification Improvement to Adopt TSTF-476, Revison 1, Improved BPWS Control Rod Insertion Process (NEDO-33091), Using the Consolidated Line Item Improvement ML0721205872007-07-23023 July 2007 License Amendment Request Pursuant to 10 CFR 50.90: Revision of Rod Worth Minimizer Limiting Condition for Operation During Startup - Technical Specification Section 3.1.1.b ML0720504232007-07-12012 July 2007 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process 2024-07-31
[Table view] Category:Bases Change
MONTHYEARNMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML22292A1312022-10-0505 October 2022 5 to Updated Final Safety Analysis Report, Technical Specification Bases, Rev. 69 RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration NMP1L3477, License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise.2022-08-12012 August 2022 License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise. NMP2L2780, Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-09-30030 September 2021 Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements NMP2L2762, License Amendment Request Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2021-05-26026 May 2021 License Amendment Request Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability NMP2L2693, Technical Specification Bases, Rev. 572018-10-24024 October 2018 Technical Specification Bases, Rev. 57 ML16309A4132016-10-24024 October 2016 Revision 47 to Technical Specification Bases, Section B3.9, Refueling Operations ML16309A4082016-10-24024 October 2016 Revision 47 to Technical Specification Bases, Section B3.5, Emergency Core Cooling Systems (ECCS) and Reactor Core Isolation Cooling (RCIC) System ML16309A4052016-10-24024 October 2016 Revision 47 to Technical Specification Bases, Section B3.2, Power Distribution Limits ML16309A4032016-10-24024 October 2016 Revision 47 to Technical Specification Bases, Section B3.0, Limiting Condition for Operation (LCO) Applicability ML16309A4022016-10-24024 October 2016 Revision 47 to Technical Specification Bases, Section B2.0, Safety Limits (Sls) ML16309A4012016-10-24024 October 2016 Revision 47 to Technical Specification Bases, Table of Contents ML16309A4002016-10-24024 October 2016 Revision 47 to Technical Specification Bases, List of Effective Pages ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. NMP1L3070, License Amendment Request - Reactivity Anomalies Surveillance2016-03-18018 March 2016 License Amendment Request - Reactivity Anomalies Surveillance NMP2L2592, Supplemental Information Regarding TSTF-425 License Amendment Request2015-09-24024 September 2015 Supplemental Information Regarding TSTF-425 License Amendment Request ML15089A2312015-03-26026 March 2015 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) NMP1L3010, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)2015-03-26026 March 2015 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) NMP2L2563, License Amendment Request - Primary Containment Isolation Instrumentation Technical Specification Allowable Value Change2014-11-17017 November 2014 License Amendment Request - Primary Containment Isolation Instrumentation Technical Specification Allowable Value Change ML12156A3632012-06-0101 June 2012 Emergency License Amendment Request Pursuant to 10 CFR 50.90: Revision of the Main Steam Isolation Valve Allowable Leakage Rate Limit ML11306A2982011-10-27027 October 2011 Submittal of Revision 22 to the Final Safety Analysis Report (Updated), 10 CFR 50.59 Evaluation Summary Report, Technical Specifications Bases Changes, and Report Consistent with 10 CFR 54.37(b) ML11214A2142011-07-25025 July 2011 License Amendment Request, Extension of the Completion Time for Inoperable Diesel Generator - Response to NRC Request for Additional Information ML0931602572009-10-26026 October 2009 Submittal of Revision 21 to the Final Safety Analysis Report (Updated), 10 CFR 50.59 Evaluation Summary Report, Technical Specifications Bases Changes, and Report Consistent with 10 CFR 54.37(b) ML0802501622008-01-24024 January 2008 Response to NRC Request for Additional Information Regarding Nine Mile Point Nuclear Station, Unit No. 1, Revision of Rod Worth Minimizer Limiting Condition for Operation During Startup ML0726401032007-09-19019 September 2007 License Amendment Request for Adoption of TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities. ML0721906052007-07-30030 July 2007 Application for Technical Specification Change TSTF-477, Rev. 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process ML0721205922007-07-23023 July 2007 Application for Technical Specification Improvement to Adopt TSTF-476, Revison 1, Improved BPWS Control Rod Insertion Process (NEDO-33091), Using the Consolidated Line Item Improvement ML0721205872007-07-23023 July 2007 License Amendment Request Pursuant to 10 CFR 50.90: Revision of Rod Worth Minimizer Limiting Condition for Operation During Startup - Technical Specification Section 3.1.1.b ML0720504232007-07-12012 July 2007 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0630406022006-10-19019 October 2006 License Amendment Request Pursuant to 10 CFR 50.90: Revision to Control Rod System Surveillance Requirements - Technical Specification 4.1.1 ML0236505402002-12-19019 December 2002 License Amendment Request Pursuant to 10 CFR 50.90: Update and Clarification of Shutdown Margin Requirements ML17037C4131977-07-22022 July 1977 Letter Enclosing Application for Amendment to Operating License and Proposed Changes to Technical Specifications Concerning Changes in Management and Organization ML17037C4141977-07-18018 July 1977 Letter Enclosing an Application for Amendment to Operating License and Proposed Changes to the Technical Specifications to Provide for More Flexible Operation and Concerning Load Line Limit Analysis ML17037C4181977-05-19019 May 1977 Letter Enclosing an Application to Amend Operating License and a Requested Change in the Technical Specifications Relating to Instrumentation Used to Monitor Drywell Suppression Chamber Differential Pressure and Suppression .. ML17037C1751975-12-24024 December 1975 Letter Regarding Approved Model Technical Specifications Relating to Hydraulic Snubbers and an Enclosed Copy of Revised Model Technical Specifications and Bases ML17037C2721975-01-21021 January 1975 Letter Transmitting Four Proposed Changes to the Technical Specifications Concerning Changes in Plant Organization and Set Points for Reactor Water Levels ML17037C3331972-04-21021 April 1972 Letter Responding to the March 21, 1972 Letter Requesting Additional Information Regarding Proposed Changes to the Technical Specifications and Bases ML17037C3351971-06-18018 June 1971 Letter Responding to the April 14, 1971 Letter Regarding Change No. 4 to the Technical Specifications and Enclosing a New Printing with Changes No. 1 and 3 and a Number of Additional Changes ML18018B0801969-08-22022 August 1969 Appendix a to Provisional Operating License DPR-17 Technical Specifications and Bases 2024-07-31
[Table view] |
Text
Keith J. Poison P.O. Box 63 Vice President-Nine Mile Point Lycoming, New York 13093 315.349.5200 315.349.1321 Fax 0 Constellation Energy Nine Mile Point Nuclear Station July 30, 2007 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Nine Mile Point Nuclear Station Unit No. 2; Docket No. 50-410 Application for Technical Specification Change TSTF-477, Revision 3, "Add Action for Two Inoperable Control Room AC Subsystems" to the Technical Specifications Using Consolidated Line Item Improvement Process Pursuant to 10 CFR 50.90, Nine Mile Point Nuclear Station, LLC, (NMPNS) hereby requests an amendment to Nine Mile Point Unit 2 (NMP2) Renewed Operating License NPF-69. The proposed amendment would modify the Technical Specifications (TS) by adding an action statement for two inoperable control room air conditioning (AC) subsystems to the plant specific TS.
Attachment (1) provides a description of the proposed change, the requested confirmation of applicability, and plant-specific verifications. Attachment (2) provides the existing TS pages marked up to show the proposed change. Attachmnent (3) provides the existing TS Bases pages marked up to show the proposed change in accordance with 10 CFR 50.36(a). TS Bases changes are provided for information only and will be processed in accordance with TS 5.5.10, "Technical Specifications (TS) Bases Control Program."
NMPNS requests approval of the proposed license amendment by January 30, 2008 with the amendment being implemented within 60 days of receipt of the approved amendment.
In accordance with 10 CFR 50.91, a copy of this license amendment application, with attachments, is being provided to the appropriate state representative.
Document Control Desk July 30, 2007 Page 2 Should you have any questions regarding the information in this submittal, please contact T. F. Syrell, Licensing Director, at (315) 349-5219.
Very truly yours, STATE OF NEW YORK TO WIT:
COUNTY OF OSWEGO I, Keith J. Poison, being duly sworn, state that I am Vice President-Nine Mile Point, and that I am duly authorized to execute and file this request on behalf of Nine Mile Point Nuclear Station, LLC. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other Nine Mile Point employees and/or consultants. Such information has been reviewed in accordance with company practice and I believe it to be reliable.
Subscribed and sworn before me, a Notary Public in and for the State of New York and County of Oswego, this 30C"-day of
WITNESS my Hand and Notarial Seal: .(-
Notary Public My Commission Expires: 0o/z 5/o j Date SANDRA A. OSWALD Notary Public, State of New York No. 01OS6032276 Qualified in Oswego County Commission Expires ,o-2 *-V KJ.P/GB Attachments: (1) Description and Assessment of the Proposed Changes (2) Proposed Technical Specification (TS) Changes (Marked Up Pages)
(3) Proposed Technical Specification (TS) Bases Changes (Marked Up Pages)
Document Control Desk July 30, 2007 Page 3 cc: S. J. Collins, NRC Region I Administrator E. C. Knutson, Senior NRC Resident Inspector M. J. David, NRC Project Manager J. P. Spath, NYSERDA
ATTACHMENT (1)
DESCRIPTION AND ASSESSMENT OF THE PROPOSED CHANGES TABLE OF CONTENTS
- 1. DESCRIPTION
- 2. ASSESSMENT
- 3. REGULATORY ANALYSIS
- 4. ENVIRONMENTAL EVALUATION
- 5. REFERENCES Nine Mile Point Nuclear Station, LLC July 30, 2007
ATTACHMENT (1)
DESCRIPTION AND ASSESSMENT OF PROPOSED CHANGES
1.0 DESCRIPTION
This letter is a request to amend Operating License 50-4 10 for Nine Mile Point Unit 2 (NMP2).
The proposed amendment would modify Technical Specifications (TS) 3.7.3, "Control Room Envelope Air Conditioning (AC) System," by adding an Action Statement to the Limiting Condition for Operation (LCO). The new Action Statement allows a finite time to restore one control room envelope AC subsystem to operable status and requires verification that the control room temperature remains < 900 F every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
The changes are consistent with Nuclear Regulatory Commission (NRC) approved Industry/Technical Specification Task Force (TSTF) TSTF-477, Revision 3 (Reference 1). The availability of this TS improvement was published in the FederalRegister on March 26, 2007 (72 FR 14143) (Reference 2) as part of the consolidated line item improvement process (CLIIP).
2.0 ASSESSMENT 2.1 Applicability of TSTF-477, and Published Safety Evaluation Nine Mile Point Nuclear Station, LLC (NMPNS) has reviewed TSTF-477, Revision 3, and the NRC model safety evaluation (SE) (Reference 3) as part of the CLIIP. NMPNS has concluded that the information in TSTF-477, as well as the SE prepared by the NRC staff are applicable to NMP2 and justify this amendment for the incorporation of the changes to the NMP2 TS.
2.2 Optional Changes and Variations NMPNS is not proposing any significant variations or deviations from the TS changes described in TSTF-477 or the NRC staff s model safety evaluation dated December 18, 2006. The NMP2 TS 3.7.3 does contains one minor deviation from the TS changes provided in the TSTF for the BWR 4 model.
Specifically, NMP2 TS 3.7.3 Condition A contains two applicable conditions which stipulate that if the condition of "One control room envelope AC subsystem inoperable" OR "Two control room envelope AC subsystems inoperable with safety function maintained," take required Action A.1. The Control Room Envelope AC System consists of two 100% capacity air conditioning subsystems. During normal operation, at least one subsystem operates. The ability of the Control Room Envelope AC System to maintain control room envelope temperature within limits is an implicit assumption of the safety analysis evaluated in the Updated Safety Analysis Report (USAR) Chapter 6, Engineering Safety Features, and Chapter 15, Accident Analysis. Due to the design of the system, when both subsystems are inoperable, the capability for the Control Room Envelope AC System to perform its design function may still exist by having sufficient components operable from both subsystems to meet its safety function. This TS deviation was part of the NMP2 conversion to the Standard Technical Specifications (STS) and does not impact or alter the application of the SE.
Since Condition A includes two inoperable subsystems with the safety function maintained, new Condition B is modified to specify that the condition is for two inoperable subsystems without the safety function being maintained.
Page 1 of 3
ATTACHMENT (1)
DESCRIPTION AND ASSESSMENT OF PROPOSED CHANGES
3.0 REGULATORY ANALYSIS
3.1 No Significant Hazards Consideration Determination NMPNS has reviewed the proposed no significant hazards consideration determination (NSHC) published in the FederalRegister as part of the CLIIP. NMPNS has concluded that the proposed NSHC presented in the Federal Register notice is applicable to NMP2 and is hereby incorporated by reference to satisfy the requirements of 10 CFR 50.9 1(a).
3.2 Verification and Commitments As discussed in the notice of availability published in the FederalRegister on March 26, 2007 for this TS improvement, plant-specific verifications were performed as follows:
NMPNS has reviewed References 1 and 2, and the model Safety Evaluation published on December 18, 2006 (71 FR 75774) as part of the CLIIP Notice for Comment. NMPNS has utilized References 1 and 2 to develop the proposed TS changes. NMPNS has also concluded that the justification presented in TSTF-477, Revision 3 and the model Safety Evaluation prepared by the NRC staff is applicable to NMP2, and justify this amendment for the incorporation of the changes to the NMP2 TS.
In addition, NMPNS has proposed TS Bases consistent with TSTF-477 which provide guidance and details on how to implement the new requirements. Finally, NMPNS has a Bases Control Program consistent with Section 5.5 of the Standard Technical Specifications (STS).
4.0 ENVIRONMENTAL EVALUATION The amendment changes requirements with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR part 20. The NRC staff has determined that the amendment adopting TSTF-477, Revision 3, involves no significant increase in the amounts or no significant change in the types of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that TSTF-477, Revision 3, involves no significant hazards considerations, and there has been no public comment on the finding in FederalRegister Notice 71 FR 75774, December 18, 2006. Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
5.0 REFERENCES
- 1. TSTF-477, Revision 3, "Adding Action Statement for Two Inoperable Control Room AC Subsystems."
- 2. FederalRegister Notice: "Notice of Availability Concerning Technical Specification Improvement to Add an Action Statement for Two Inoperable Control Room Air Conditioning Subsystems to the Technical Specifications Using the Consolidated Line Item Improvement Process," published on March 26, 2007 (72 FR 14143).
Page 2 of 3
ATTACHMENT (1)
DESCRIPTION AND ASSESSMENT OF PROPOSED CHANGES
- 3. FederalRegister Notice: "Notice of Opportunity To Comment on Model Safety Evaluation and Model License Amendment Request on Technical Specification Improvement Regarding Adding an Action Statement for Two Inoperable Control Room Air Conditioning Subsystems," published on December 18, 2006 (71 FR 75774).
Page 3 of 3
ATTACHMENT (2)
PROPOSED TECHNICAL SPECIFICATION (TS) CHANGES (MARKED UP PAGES)
TS Page 3.7.3-1 TS Page 3.7.3-2 TS Page 3.7.3-3 Nine Mile Point Nuclear Station, LLC July 30, 2007
Control Room Envelope AC System 3.7.3 3.7 PLANT SYSTEMS 3.7.3 Control Room Envelope Air Conditioning (AC) System LCO 3.7.3 Two control room envelope AC subsystems shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3, During movement of irradiated fuel assemblies in the secondary containment, During CORE ALTERATIONS, During operations with a potential for draining the reactor vessel (OPDRVs).
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One control room A.1 Restore control room 30 days envelope AC subsystem envelope AC inoperable. subsystem(s) to OPERABLE status.
OR Two control room envelope AC subsystems inoperable with safety function maintained.
_.._
C, C,
'N Required Action and 1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
' Associated Completion Time of Condition A o,, 13 AND not met in MODE 1,2, C.
or 3. '&2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)
-lwsr-RiV 'i.j "
NMP2 3.7.3-1 Amendment' l,_
INSERT "1" B. Two control room B.1 Verify control room Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> envelope AC subsystems envelope area inoperable with safety temperature < 90'F.
function not maintained in MODES 1, 2, or 3. AND B.2 Restore one control 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> room envelop AC subsystem to OPERABLE status.
Control Room Envelope AC System 3.7.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME b.
NS, Required Action and ------------ NOTE ----------
associated Completion LCO 3.0.3 is not applicable.
Time of Condition A -
not met during b, movement of irradiated "6,,1 Place OPERABLE Immediately fuel assemblies in the components of control secondary containment, room envelope AC during CORE subsystem(s)
ALTERATIONS, or during equivalent to a OPDRVs. single control room envelope AC subsystem in operation.
OR b.
"G.2.1 Suspend movement of Immediately irradiated fuel assemblies in the secondary containment.
AND "6,2.2 Suspend CORE Immediately ALTERATIONS.
AND b3,
",?.3 Initiate action to Immediately IDýTo o m D.1 Enter LCO 3.0.3.. e envelope AC subsy inoperable with safety function not maintained in MOD._D5 .- '-",ý (continued)
NMP2 3.7.3-2 Amendment'94*j
Control Room Envelope AC System 3.7.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME E. om pgoonrl -NOTE
- <e..-,~ r~I A-"tA' ki r~+I-r~
LCO 3.0.3 is not applicable.
inpoablc with sa3fety rpee during E.1 Suspend movement of Immediately movement of irradiated irradiated fuel fuel assemblies in the assemblies in the secondary containment, secondary during CORE containment.
ALTERATIONS, or during OPDRVs. AND E.2 Suspend CORE Immediately ALTERATIONS.
T(9o mpk2,' 1(i AND 1,0t-- iief-i E.3 Initiate action to Immediately suspend OPDRVs.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 Verify each control room envelope AC 24 months subsystem has the capability to remove the assumed heat load.
NMP2 3.7.3-3 Amendment X)
ATTACHMENT (3)
PROPOSED TECHNICAL SPECIFICATION (TS) BASES CHANGES (MARKED UP PAGES)
TS Bases Page B 3.7.3-3 TS Bases Page B 3.7.3-4 TS Bases Page B 3.7.3-5 Nine Mile Point Nuclear Station, LLC July 30, 2007
Control Room Envelope AC System B 3.7.3 BASES APPLICABILITY temperature limitations in these MODES. Therefore, (continued) maintaining the Control Room Envelope AC System OPERABLE is not required in MODE 4 or 5, except for the following situations under which significant radioactive releases can be postulated:
- a. During movement of irradiated fuel assemblies in the secondary containment;
- b. During CORE ALTERATIONS; and
- c. During operations with a potential for draining the reactor vessel (OPDRVs).
ACTIONS A.1 With one control room envelope AC subsystem inoperable, or with both control room envelope AC subsystems inoperable but the Control Room Envelope AC System safety function maintained, the inoperable control room envelope AC subsystem(s) must be restored to OPERABLE status within 30 days. The Control Room Envelope AC System safety function is maintained when the Control Room Envelope AC System components equivalent to one control room envelope AC subsystem are OPERABLE. With the unit in this condition, the remaining OPERABLE control room envelope AC subsystem (or OPERABLE components in both subsystems) is adequate to perform the control room envelope air conditioning function.
However, the overall reliability is reduced because a single failure in the OPERABLE subsystem (or remaining OPERABLE portions of the subsystems, as applicable) could result in loss of the control room envelope air conditioning function.
The 30 day Completion Time is based on the low probability of an event occurring requiring control room envelope isolation, the consideration that the remaining subsystem (or components in both subsystems) can provide the required INS E- I.f protection, and the availability of alternate cooling methods.
C' Ia. 1 and2 In MODE 1, 2, or 3, if the inoperable control room envelope AC subsystem(s) cannot be restored to OPERABLE status within the associated Completion Time, the unit must be placed in a MODE that minimizes risk. To achieve this status the unit (continued)
NMP2 B 3.7.3-3 RevisionN)
INSERT "BI" B.1 and B.2 If both control room envelope AC subsystems are inoperable, and the safety function can not be maintained, the Control Room Envelope AC System may not be capable of performing its intended function.
Therefore, the control room envelope area temperature is required to be monitored to ensure that temperature is being maintained low enough that equipment in the control room envelope is not adversely affected. With the control room envelope temperature being maintained within the temperature limit of < 90' F (Reference 2), 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is allowed to restore a control room envelope AC subsystem to OPERABLE status. This completion time is reasonable considering that the control room envelope temperature is being maintained within limits and the low probability of an event occurring requiring control room isolation.
Control Room Envelope AC System B 3.7.3 BASES C
ACTIONS -B.1 and-B-2 (continued) must be placed in at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.
b 1 bb
-'.1-e'V.2.1 ,-@.2.2, and--&.2.3 LCO 3.0.3 is not applicable while in MODE 4 or 5. However, since irradiated fuel assembly movement caii occur in MODE 1, 2, or 3, the Required Actions of Condition--are modified by a Note indicating that LCO 3.0.3 does not apply. If moving irradiated fuel assemblies while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations.
Entering LCO 3.0.3 while in MODE 1, 2, or 3 would require the unit to be shutdown, but would not require immediate suspension of movement of irradiated fuel assemblies. The Note to the ACTIONS, "LCO 3.0.3 is not applicable," ensures that the actions for immediate suspension of irradiated fuel assembly movement are not postponed due to entry into LCO 3.0.3.
During movement of irradiated fuel assemblies in the secondary containment, during CORE ALTERATIONS, or during OPDRVs, if Required Action A.1 cannot be completed within the required Completion Time, the OPERABLE components of the control room envelope AC subsystem(s) equivalent to a single control room envelope AC subsystem (e.g., the control building chilled water subsystem and air conditioning units do not have to be powered from the same electrical division) may be placed immediately in operation. This action ensures that the remaining subsystem (or components in both subsystems equivalent to a single control room envelope AC subsystem) is OPERABLE, that no failures that would prevent actuation will occur, and that any active failure will be readily detected.
An alternative to Required Action-e*1 is to immediately suspend activities that present a potential for releasing radioactivity that might require isolation of the control room envelope. This places the unit in a condition that minimizes risk.
(continued)
NMP2 B 3.7.3-4 Revision-62
Control Room Envelope AC System B 3.7.3 BASES D.,&1,N&.2.1,&2.2, b, bD., andN,2.3 (continued)
ACTIONS If applicable, CORE ALTERATIONS and movement of irradiated fuel assemblies in the secondary containment must be suspended immediately. Suspension of these activities shall not preclude completion of movement of a component to a safe position. Also, if applicable, action must be initiated immediately to suspend OPDRVs to minimize the probability of a vessel draindown and subsequent potential for fission product release. Action must continue until the OPDRVs are suspended.
If-athcntrol room envelope AC subsystems are n "
wihteEvlope AC. S .,e~~'e y function not maintaine in MODE 1, ontrol Room Envelope AC System ma a alofprrmgh-tended E.1, E.2, and E.3 LCO 3.0.3 is not applicable while in MODE 4 or 5. However, since irradiated fuel assembly movement can occur in MODE 1, 2, or 3, the Required Actions of Condition E are modified by a Note indicating that LCO 3.0.3 does not apply. If moving irradiated fuel assemblies while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations.
Entering LCO 3.0.3 while in MODE 1, 2, or 3 would require the unit to be shutdown, but would not require immediate suspension of movement of irradiated fuel assemblies. The Note to the ACTIONS, "LCO 3.0.3 is not applicable," ensures that the actions for immediate suspension of irradiated fuel assembly movement are not postponed due to entry into LCO 3.0.3.
During movement of irradiated fuel assemblies in the jIsecondary containment, during CORE ALTERATIONS, or during function not mainptined, action must be taken to immediately suspend activities that present a potential for releasing radioactivity that might require isolation of the control room envelope. This places the unit in a condition that minimizes risk.
(continued)
NMP2 B 3.7.3-5 RevisioA,
INSERT "B2" if Required Actions B. 1 and B.2 cannot be met within the required Completion Times,