ML083260431

From kanterella
Revision as of 10:58, 14 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Acceptance Review Email, License Amendment Request, Modify Transformer Allowed Outage Time in Technical Specification 2.7(2) and Delete Associated 2.7(2) Special Reporting Requirements in TS 5.9.3j
ML083260431
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/21/2008
From: Wang A
Plant Licensing Branch IV
To: Hansher B
Omaha Public Power District
Wang, A B, NRR/DORL/LPLIV, 415-1445
References
TAC MD9388
Download: ML083260431 (1)


Text

From: Alan Wang Sent: Friday, November 21, 2008 9:57 AM To: HANSHER, BILL R Cc: Lynnea Wilkins

Subject:

Acceptance of LAR Regarding Technical Specification 2.7(2) MD9388

Bill, By letter dated July 31, 2008 , Omaha Public Power Company requested an amendment to the Facility Operating License for the Fort Calhoun Station, Unit No. 1 (FCS). This License Amendment Request (LAR) proposed to modify the transformer allowed outage time in FCS Technical Specifications (TSs) 2.7(2)a ,b and c and delete the associated 2.7(2) reporting requirements in TS 5.9.3j. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.

This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact the me, at (301) 415-1445.

Alan Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation E-mail Properties Mail Envelope Properties ()

Subject:

Acceptance of LAR Regarding Technical Specification 2.7(2) MD9388 Sent Date: 11/21/2008 9:44:31 AM Received Date: 11/21/2008 9:56:00 AM From: Alan Wang Created By: Alan.Wang@nrc.gov Recipients:

bhansher@oppd.com (HANSHER, BILL R)

Tracking Status: None Lynnea.Wilkins@nrc.gov (Lynnea Wilkins)

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 5938 11/21/2008 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: