Semiannual Fitness for Duty Program Performance Report
ML090540054
Person / Time
Site: Cooper Entergy icon.png
Issue date: 02/12/2009
From: Vanderkamp D
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2009011
Download: ML090540054 (5)


Text

H Nebraska Public Power District "Always there when you need us" 10 CFR 26 NLS2009011 February 12, 2009 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

Semiannual Fitness for Duty Program Performance Report Cooper Nuclear Station, Docket No. 50-298, DPR-46

Dear Sir or Madam:

The purpose of this letter is to submit Nebraska Public Power District's fitness for duty program semiannual performance report for Cooper Nuclear Station (CNS) for the period of July 1, 2008, through December 31, 2008. This report is submitted in accordance with the provisions of 10 CFR 26.71(d) which existed prior to issuance of the new 10 CFR Part 26 final rule on April 30, 2008. As stated in the final rule published in the Federal Register, licensees may defer implementation of this rule (except for Subparts I and K) until March 31, 2009. CNS has not yet implemented the revision to 10 CFR 26; therefore, this report is based on the regulation that existed prior to April 30, 2008.

Should you have any questions concerning the attached report, please contact Jeff Schwarting, Nuclear Security Services Supervisor, at (402) 825-5060.

Sincerely, David W. Van Der Kamp Licensing Manager

/lb Attachment cc: Regional Administrator w/attachment NPG Distribution w/o attachment USNRC - Region IV Cooper Project Manager w/attachment CNS Records w/attachment USNRC - NRR Project Directorate IV-1 Senior Resident Inspector w/attachment USNRC - CNS COOPER NUCLEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 ww,w.nppd.com

NLS2009011 Attachment Page 1 of 3 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO IOCFR26 Nebraska Public Power District 12/31/08 Company 6 Month Ending Cooper Nuclear Station, Brownville, Nebraska Location Jeff Schwartinq (402)825-5060 Contact Name Phone

  1. samples positive for THC (Marijuana Metabolite): 2
  1. samples positive for THC that screened at 50 ng/ml: 2
  1. samples positive for THC that screened at 100 ng/ml: 0
  1. samples positive for Alcohol that screened at .04%BAC: 0
  1. samples positive for Alcohol that screened at .02%BAC: 1 Cutoffs: Screen/Confirmation (ng/ml) Appendix A to 10CFR26 Marijuana 50/15 Amphetamine 1000/500 N/A N/A Cocaine 300/150 Phencyclidine 25/25 N/A N/A Opiates 300/300 Alcohol (%BAC) 0.04% N/A N/A Pre Access/Follow up Alcohol (%BAC) 0.02% N/A N/A Licensee Long-Term Short-Term Testing Results Employees Contractor Contractor Personnel Personnel Average Number with 767 0 218 Unescorted Access Categories Tested Positive Tested Positive Tested Positive Pre-Access 34 0 1 0 94 2 For-Cause Post Accident 1 0 0 0 5 0 For-Cause Observed 2 0 0 0 0 0 Behavior 173 0 0 0 47 0 Random Follow-Up 11 0 0 0 10 0 Other* 2 0 0 0 1 1 Total 223 0 1 0 157 3
  • See explanation on Page 3

NLS2009011 Attachment Page 2 of 3 BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES THC COC OP AMP PCP ALO Refusal 1 2 3 4 5 To Test Licensee Employees 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A Long-Term 0 0 0 0 0 0 0 -N/A N/A N/A N/A N/A Contractors Short-Term 2 0 0 0 0 1 0 N/A N/A N/A N/A N/A Contractors Total 2 0 0 0 0 1 0 N/A N/A N/A N/A N/A Total Confirmed Positive Tests For All Specific Substances and Refusals to Test: 3

NLS2009011 Attachment Page 3 of 3

SUMMARY

OF FITNESS FOR DUTY ACTIVITIES FOR JULY THROUGH DECEMBER 2008 POSITIVE RESULTS:

There were three positive test results during this reporting period.

PRE-ACCESS:

There were three positive pre-access test results during this reporting period. *One of these tests was reported in the "Other" category as it was the result of a Direct Observation due to low temperature during a pre-access test.

RANDOM:

There were no positive random test results during this reporting period.

FOLLOW-UP:

There were no positive follow-up test results during this reporting period.

FOR-CAUSE/POST-ACCIDENT:

Six for-cause/post-accident tests were performed during this reporting period with no positive results.

FOR-CAUSE/OBSERVED BEHAVIOR:

Two for-cause/observed behavior tests were performed during this reporting period with no positive results.

RANDOM TESTING RATE:

The random testing rate for this reporting period was 22.3%.

RANDOM TESTING RATE FOR 2008:

The random testing rate for 2008 was 56.4%.

4 ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS© ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS@'

Correspondence Number: NLS2009011 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITMENT COMMITTED DATE COMMITMENT NUMBER OR OUTAGE None

+ +

4 +

+ +