ML12060A118

From kanterella
Revision as of 08:29, 12 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Third Update to Mandatory Disclosures Pursuant to 10 C.F.R. Section 2.336; Firstenergy Nuclear Operating Co., License Renewal for Davis-Besse Nuclear Power Station
ML12060A118
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/29/2012
From: Matthews T
FirstEnergy Nuclear Operating Co, Morgan, Morgan, Lewis & Bockius, LLP
To: Harris B, Lodge T
- No Known Affiliation, NRC/OGC
SECY RAS
References
RAS 21968, 50-346-LR, ASLBP 11-907-01-LR-BD01, LBP-11-13
Download: ML12060A118 (15)


Text

Morgan, Lew wis & Bockius LLP 1111 Pennsyylvania Avenue, NW W

Washington, DC 20004 Tel: 202-7399-3000 Fax: 202-7399-3001 www.morgannlewis.com Timothy P. P Matthews 202.739.552 27 tmatthews@@morganlewis.com m Februaryy 29, 2012 Via Elecctronic Inforrmation Exchange Terry J. Lodge, L Esq.

316 N. Michigan M St.,, Suite 520 Toledo, OH O 43604 Brian G. Harris, Esq..

Office off the Generall Counsel U.S. Nucclear Regulattory Commiission Washinggton, DC 205 555-0001 RE: Third Updatee to Mandatoory Disclosurres Pursuantt to 10 C.F.R T R. § 2.336; FirstEnergy F

N Nuclear Operrating Co., License L Reneewal for Davvis-Besse Nuuclear Powerr Station, D

Docket No. 50-346

Dear Couunsel:

Pursuant to 10 C.F.R R. § 2.336, thhe Boards Innitial Scheduuling Order dated d June 15, 1 2011, andd the Boards Order O modiffying the Inittial Scheduliing Order daated Novembber 2, 2011, FirstEnergyy Nuclear Operating O Company C (FEENOC) is prooviding the enclosed e dissclosures forr Intervenorss Contentioons 1 and 4 as restated and a admittedd by the Boarrd on April 26, 2 2011 (LB BP-11-13).

FENOCs disclosures consist of the followinng:

  • Encloosure 1 is resserved for thhe names, adddresses, andd telephone numbersn of the t persons upon u

whosse opinion FE ENOC will baseb its positions on the contentions and upon whomw FENOC may relyr as witneesses, and a copy of the analyses andd authorities upon whichh they base thheir opiniions. FENOC has not yeet identified witnesses foor any hearinng on the conntentions, annd will update u Enclo osure 1 whenn it has identtified its witnnesses.

  • Encloosure 2 prov vides a descriiption, by caategory and location, l of the t documennts, data comppilations, and d tangible thhings in the possession, p c custody, or control c of FEENOC that maym be rellevant to thee admitted coontentions. Per P the Scheeduling Ordeer and our aggreement, these

Terry J. Lodge, Esq.

Brian G. Harris, Esq.

February 29, 2012 Page Two disclosures do not include privileged documents, or publicly-available documents unless FirstEnergy expects to rely on them at hearing. If you determine that you would like a copy of any of these documents, please inform me of which documents you would like, and I will provide a copy to you.

  • Enclosure 3 provides an index of documents, data compilations, or tangible things that may be relevant to the contentions but that contain proprietary information, Sensitive Unclassified Non-Safeguards Information (SUNSI), or otherwise protected information. Upon request, FENOC will provide a copy under the terms of a Protective Order issued by the Board.

In order to compile Enclosures 2 and 3, a search was conducted of documents in FENOCs possession, custody, or control. The attached affidavit attests that all relevant materials identified by this search that are required to be disclosed under the Scheduling Order have been disclosed.

When FENOC identifies additional relevant documents or the witnesses for any hearing on the contentions, FENOC will update these disclosures as required by the Boards Scheduling Order.

FENOC has been conservative in identifying documents for inclusion in Enclosures 2 and 3. By identifying documents in those Enclosures, FENOC does not necessarily concede that the documents are in fact relevant or material to the admitted contentions.

Sincerely, Executed in Accord with 10 C.F.R. § 2.304(d)

Signed (electronically) by Timothy P. Matthews Timothy P. Matthews 1111 Pennsylvania Ave. NW Washington, DC 2004 (202) 739-5527 tmatthews@morganlewis.com Counsel for FirstEnergy Nuclear Operating Co.

Enclosures DB1/ 68343838.6

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of )

) Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY )

)

(Davis-Besse Nuclear Power Station, Unit 1) )

)

AFFIDAVIT OF CLIFF CUSTER

1. My name is Cliff Custer. I am the Project Manager, License Renewal, at FirstEnergy Nuclear Operating Company (FENOC). Working with the attorneys for FENOC, I have been responsible for managing the collection of documents, data compilations, and tangible things to comply with the mandatory disclosure requirements in 10 C.F.R. § 2.336 and the Atomic Safety and Licensing Boards Initial Scheduling Order dated June 15, 2011 (Scheduling Order) in this proceeding, and the Licensing Boards Order Granting Motion for Modification of Initial Scheduling Order dated November 2, 2011 in this proceeding.
2. FENOC conducted a search of documents, data compilations, and tangible things in its possession, custody, and control for information relevant to the admitted contentions, and in the possession, custody, and control of its affiliated companies, as specified in 10 C.F.R. § 2.336(a). As provided in 10 C.F.R. § 2.336(c), this search encompassed information and documents reasonably available to FENOC and its affiliated companies, including:
a. Both electronic and paper documents; DB1/ 69192627.1
b. Corporate records, Davis-Besse license renewal project files, and documents in the possession and control of individuals who have worked on the Davis-Besse license renewal project or on matters potentially relevant to the admitted contentions; and
c. Documents, data compilations, and tangible things in the possession and control of AREVA, Inc. (AREVA), which assisted FENOC in preparing portions of the Davis-Besse Environmental Report.
3. Consistent with the Boards Scheduling Order, Enclosure 2 to this Affidavit provides an index of relevant, non-privileged, non-protected documents, data compilations, and tangible things that were located as a result of this search.
4. Consistent with the Boards Scheduling Order, Enclosure 3 to this Affidavit provides the index of relevant documents, data compilations, and tangible things containing information that FENOC believes are proprietary to FENOC or its affiliated companies or third parties, or falls within the category of Sensitive Unclassified, Non-Safeguards Information (SUNSI).
5. FENOC has been conservative in identifying documents for inclusion in the Enclosures.

Accordingly, FENOC is not suggesting that just because a document is listed on the Enclosure that it is indeed relevant to one of the admitted contentions.

6. These disclosures are reasonably accurate and complete as of January 31, 2012.

DB1/ 69192627.1 2

The statements made above are true to the best of my knowledge, information, and belief.

I declare under penalty of perjury that the foregoing is true and correct.

Executed in Accord with 10 CFR 2.304(d)

Signed (electronically) by Cliff Custer__

Cliff Custer License Renewal Project Manager FirstEnergy Nuclear Operating Company Beaver Valley Nuclear Power Station Route 168 Shippingport, PA 15077 Phone: 724-682-7139 E-mail: custerc@firstenergycorp.com Executed this 28th day of February 2012.

DB1/ 69192627.1 3

Enclosure 1 (Reserved)

DB1/ 69192627.1

Enclosure 2 DB1/ 69192627.1

First Energy-Davis-Besse License Renewal Proceeding Mandatory Disclosure Log Third Update, February 29, 2012 Log No. Category Location* Document Title Date Contentions Standard file;Standard file Morgan, Lewis & 82_FINAL CAREBS cmmg on freq regulation FEDB-00000705 without attachment Bockius NOPR_110502.pdf 1/19/2012 Contention 1 Morgan, Lewis &

FEDB-00000706 eMail;eMail with attachment Bockius CAES Presentation to FERC 1/24/2012 Contention 1 Morgan, Lewis & Norton Energy Storage FERC Staff FEDB-00000707 Attachment Bockius 072011.ppt 1/24/2012 Contention 1 eMail;eMail without Morgan, Lewis &

FEDB-00000708 attachment Bockius DH TH NB, Rev. 2 1/3/2012 Contention 4 eMail;eMail without Morgan, Lewis & Fw: Frequency Regulation Rule Adds to Policy FEDB-00000709 attachment Bockius Framework for Bulk Energy Storage 1/18/2012 Contention 1 eMail;eMail without Morgan, Lewis & Fw: Frequency Regulation Rule Adds to Policy FEDB-00000710 attachment Bockius Framework for Bulk Energy Storage 1/18/2012 Contention 1 eMail;eMail without Morgan, Lewis & Fw: Frequency Regulation Rule Adds to Policy FEDB-00000711 attachment Bockius Framework for Bulk Energy Storage 1/18/2012 Contention 1 eMail;eMail without Morgan, Lewis &

FEDB-00000712 attachment Bockius JobsOhio 1/18/2012 Contention 1 eMail;eMail without Morgan, Lewis & NRC ENV PM Telecon Notes - January 12 FEDB-00000713 attachment Bockius and January 19, 2012 1/20/2012 Contention 4 eMail;eMail without Morgan, Lewis & NRC ENV PM Telecon Notes - January 12 FEDB-00000714 attachment Bockius and January 19, 2012 1/20/2012 Contention 4 RE: FirstEnergy Norton - erosion and eMail;eMail without Morgan, Lewis & sediment control plan for excavated area of FEDB-00000715 attachment Bockius stack #1 1/10/2012 Contention 1 eMail;eMail without Morgan, Lewis &

FEDB-00000716 attachment Bockius Re: EPRI CAES Report 1/25/2012 Contention 1 eMail;eMail without Morgan, Lewis &

FEDB-00000717 attachment Bockius Re: EPRI CAES Report 1/25/2012 Contention 1 eMail;eMail without Morgan, Lewis &

FEDB-00000718 attachment Bockius Re: EPRI CAES Report 1/25/2012 Contention 1 eMail;eMail without Morgan, Lewis &

FEDB-00000719 attachment Bockius Re: EPRI CAES Report 1/25/2012 Contention 1 Re: Fw: FE GEN Request for EPRI GEN Report - "Technical Assessment Guide (TAG) -

eMail;eMail without Morgan, Lewis & - Power Generation and Storage Technology FEDB-00000720 attachment Bockius Options: 2011 Update" (1021810) 1/23/2012 Contention 1 Morgan, Lewis & Re: Fw: FirstEnergy Announces Plans to FEDB-00000721 eMail;eMail with attachment Bockius Retire Six Coal-fired Plants 1/31/2012 Contention 1

First Energy-Davis-Besse License Renewal Proceeding Mandatory Disclosure Log Third Update, February 29, 2012 Log No. Category Location* Document Title Date Contentions Morgan, Lewis &

FEDB-00000722 Attachment Bockius Cardin_request.doc 1/31/2012 Contention 1 eMail;eMail without Morgan, Lewis &

FEDB-00000723 attachment Bockius Re: JobsOhio 1/18/2012 Contention 1 eMail;eMail without Morgan, Lewis &

FEDB-00000724 attachment Bockius no Title 1/4/2012 Contention 1

Enclosure 3 DB1/ 69192627.1

First Energy-Davis-Besse License Renewal Proceeding Proprietary Log Third Update, February 29, 2012 Log No. Category Location* Document Title Date Confidentiality Contentions Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003630 without attachment Bockius 25 MAAP kg.xls 1/6/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003631 without attachment Bockius ATTACHMENT_1.pdf 11/18/2009 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Standard file;Standard file Morgan, Lewis & Third-Party Proprietary - 10 C.F.R. § FEDBPROP-00003632 without attachment Bockius CAES Cost Eval 1021939[1].pdf 1/23/2012 2.390(a)(4) Contention 1 eMail;eMail without Morgan, Lewis & Third-Party Proprietary - 10 C.F.R. § FEDBPROP-00003633 attachment Bockius EPRI CAES Report 1/25/2012 2.390(a)(4) Contention 1 eMail;eMail without Morgan, Lewis & Third-Party Proprietary - 10 C.F.R. § FEDBPROP-00003634 attachment Bockius EPRI CAES Report 1/25/2012 2.390(a)(4) Contention 1 eMail;eMail without Morgan, Lewis & Third-Party Proprietary - 10 C.F.R. § FEDBPROP-00003635 attachment Bockius EPRI CAES Report 1/25/2012 2.390(a)(4) Contention 1 eMail;eMail without Morgan, Lewis & Third-Party Proprietary - 10 C.F.R. § FEDBPROP-00003636 attachment Bockius EPRI CAES Report 1/25/2012 2.390(a)(4) Contention 1 eMail;eMail without Morgan, Lewis & Third-Party Proprietary - 10 C.F.R. § FEDBPROP-00003637 attachment Bockius EPRI CAES Report 1/25/2012 2.390(a)(4) Contention 1 eMail;eMail without Morgan, Lewis & Third-Party Proprietary - 10 C.F.R. § FEDBPROP-00003638 attachment Bockius EPRI CAES Report 1/25/2012 2.390(a)(4) Contention 1 Morgan, Lewis &

FEDBPROP-00003639 eMail;eMail with attachment Bockius Fw: December Update Report 1/27/2012 FE Proprietary - 10 C.F.R. § 2.390(a)(4) Contention 1 Morgan, Lewis &

FEDBPROP-00003640 Attachment Bockius ISPD Project Status Report_012712.doc 1/27/2012 FE Proprietary - 10 C.F.R. § 2.390(a)(4) Contention 1 Morgan, Lewis & Fw: EPRI Grid Ops & Planning 2011 Project Wrap-Up Third-Party Proprietary - 10 C.F.R. § FEDBPROP-00003641 eMail;eMail with attachment Bockius Webcast Schedule 1/16/2012 2.390(a)(4) Contention 1 Morgan, Lewis & Third-Party Proprietary - 10 C.F.R. § FEDBPROP-00003642 Attachment Bockius 2012_P173.pdf 1/16/2012 2.390(a)(4) Contention 1 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003643 without attachment Bockius IER_11-4_01.inp 1/18/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003644 without attachment Bockius IER_11-4_01.inp 1/18/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003645 without attachment Bockius IER_11-4_02.SYS 1/17/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003646 without attachment Bockius IER_11-4_02.inp 1/18/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003647 without attachment Bockius IER_11-4_02.inp 1/18/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003648 without attachment Bockius IER_11-4_03.SYS 1/17/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003649 without attachment Bockius IER_11-4_03.inp 1/18/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003650 without attachment Bockius IER_11-4_03.inp 1/18/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003651 without attachment Bockius IER_11-4_04.SYS 1/17/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4

First Energy-Davis-Besse License Renewal Proceeding Proprietary Log Third Update, February 29, 2012 Log No. Category Location* Document Title Date Confidentiality Contentions Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003652 without attachment Bockius MAAP FLAASH 68.pdf 1/3/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003653 without attachment Bockius MAAP Fission Produce mass.xls 1/6/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 FE Proprietary - 10 C.F.R. § 2.390(a)(4);

Standard file;Standard file Morgan, Lewis & SUNSI - 10 C.F.R. § 2.390(d)(1); Third-Party FEDBPROP-00003654 without attachment Bockius MAAP Output for MACCS2.pdf 1/16/2012 Proprietary - 10 C.F.R. § 2.390(a)(4) Contention 4 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003655 without attachment Bockius MAAP isotopes.xls 1/4/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003656 without attachment Bockius MAAP parameters for MACCS2.pdf 1/16/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Morgan, Lewis & Third-Party Proprietary - 10 C.F.R. § FEDBPROP-00003657 eMail;eMail with attachment Bockius Re: EPRI CAES Report 1/25/2012 2.390(a)(4) Contention 1 Morgan, Lewis & Third-Party Proprietary - 10 C.F.R. § FEDBPROP-00003658 Attachment Bockius CAES Cost Eval 1021939[1].pdf 1/25/2012 2.390(a)(4) Contention 1 Morgan, Lewis & Third-Party Proprietary - 10 C.F.R. § FEDBPROP-00003659 eMail;eMail with attachment Bockius Re: EPRI CAES Report 1/25/2012 2.390(a)(4) Contention 1 Morgan, Lewis & Third-Party Proprietary - 10 C.F.R. § FEDBPROP-00003660 Attachment Bockius CAES Cost Eval 1021939[1].pdf 1/25/2012 2.390(a)(4) Contention 1 Morgan, Lewis & Third-Party Proprietary - 10 C.F.R. § FEDBPROP-00003661 eMail;eMail with attachment Bockius Re: EPRI CAES Report 1/25/2012 2.390(a)(4) Contention 1 Morgan, Lewis & Third-Party Proprietary - 10 C.F.R. § FEDBPROP-00003662 Attachment Bockius CAES Cost Eval 1021939[1].pdf 1/25/2012 2.390(a)(4) Contention 1 Morgan, Lewis & Third-Party Proprietary - 10 C.F.R. § FEDBPROP-00003663 eMail;eMail with attachment Bockius Re: EPRI CAES Report 1/25/2012 2.390(a)(4) Contention 1 Morgan, Lewis & Third-Party Proprietary - 10 C.F.R. § FEDBPROP-00003664 Attachment Bockius CAES Cost Eval 1021939[1].pdf 1/25/2012 2.390(a)(4) Contention 1 Morgan, Lewis & Third-Party Proprietary - 10 C.F.R. § FEDBPROP-00003665 eMail;eMail with attachment Bockius Re: EPRI CAES Report 1/25/2012 2.390(a)(4) Contention 1 Morgan, Lewis & Third-Party Proprietary - 10 C.F.R. § FEDBPROP-00003666 Attachment Bockius CAES Cost Eval 1021939[1].pdf 1/25/2012 2.390(a)(4) Contention 1 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003667 without attachment Bockius ier_11-4_01.d68 1/17/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003668 without attachment Bockius ier_11-4_01.d69 1/17/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003669 without attachment Bockius ier_11-4_01.log 1/17/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003670 without attachment Bockius ier_11-4_01.tab 1/17/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003671 without attachment Bockius ier_11-4_02.d68 1/17/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003672 without attachment Bockius ier_11-4_02.d69 1/17/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4

First Energy-Davis-Besse License Renewal Proceeding Proprietary Log Third Update, February 29, 2012 Log No. Category Location* Document Title Date Confidentiality Contentions Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003673 without attachment Bockius ier_11-4_02.tab 1/17/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003674 without attachment Bockius ier_11-4_03.d68 1/17/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003675 without attachment Bockius ier_11-4_03.d69 1/17/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003676 without attachment Bockius ier_11-4_03.log 1/17/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003677 without attachment Bockius ier_11-4_03.tab 1/17/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003678 without attachment Bockius ier_11-4_04.d68 1/17/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003679 without attachment Bockius ier_11-4_04.d69 1/17/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4 Standard file;Standard file Morgan, Lewis & FE Proprietary - 10 C.F.R. § 2.390(a)(4);

FEDBPROP-00003680 without attachment Bockius ier_11-4_04.tab 1/17/2012 SUNSI - 10 C.F.R. § 2.390(d)(1) Contention 4

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of )

) Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY )

)

(Davis-Besse Nuclear Power Station, Unit 1) ) February 29, 2012

)

CERTIFICATE OF SERVICE I hereby certify that, on this date, a copy of FENOCs Third Update to Mandatory Disclosures Pursuant to 10 C.F.R. § 2.336 was filed with the Electronic Information Exchange in the above-captioned proceeding on the following recipients.

Administrative Judge Administrative Judge William J. Froehlich, Chair Dr. Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: wjf1@nrc.gov E-mail: nicholas.trikouros@nrc.gov Administrative Judge Office of the General Counsel Dr. William E. Kastenberg U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel Mail Stop O-15D21 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Edward L. Williamson E-mail: wek1@nrc.gov Lloyd B. Subin Brian G. Harris Brian P. Newell Office of the Secretary Catherine E. Kanatas U.S. Nuclear Regulatory Commission edward.williamson@nrc.gov; Rulemakings and Adjudications Staff lloyd.subin@nrc.gov; Washington, DC 20555-0001 brian.harris@nrc.gov; E-mail: hearingdocket@nrc.gov brian.newell@nrc.gov; catherine.kanatas@nrc.gov

Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Mail Stop: O-16C1 Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov Michael Keegan Dont Waste Michigan 811 Harrison Street Monroe, MI 48161 Kevin Kamps E-mail: mkeeganj@comcast.net Paul Gunter Beyond Nuclear 6930 Carroll Avenue, Suite 400 Takoma Park, MD 20912 Terry J. Lodge E-mail: kevin@beyondnuclear.org; 316 N. Michigan St., Ste. 520 paul@beyondnuclear.org Toledo, OH 43604 E-mail: tjlodge50@yahoo.com Signed (electronically) by Jane T. Accomando Jane T. Accomando Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, N.W.

Washington, DC 20004 Phone: 202-739-3000 Fax: 202-739-3001 E-mail: jaccomando@morganlewis.com Counsel for FENOC DB1/ 68426326.4 2