ML12181A354

From kanterella
Jump to navigation Jump to search
Seventh Update Mandatory Disclosues Pursuant 10 C.F.R. Firstenergy
ML12181A354
Person / Time
Site: Davis Besse 
Issue date: 06/29/2012
From: Matthew T
FirstEnergy Corp, FirstEnergy Nuclear Operating Co, Morgan, Morgan, Lewis & Bockius, LLP
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 22864, ASLBP 11-907-01-LR-BD01, 50-346-LR
Download: ML12181A354 (13)


Text

Morgan, Lew 1111 Pennsy Washington, Tel: 202-739 Fax: 202-739 www.morgan Timothy P 202.739.552 tmatthews@

June 29, Via Elec Terry J. L 316 N. M Toledo, O Brian G.

Office of U.S. Nuc Washing RE:

S N

D Dear Cou Pursuant Boards O Nuclear O Contentio FENOC

  • Enclo whos may r opini will u
  • Enclo comp be rel wis & Bockius LLP ylvania Avenue, NW DC 20004 9-3000 9-3001 nlewis.com P. Matthews 27

@morganlewis.com 2012 ctronic Infor Lodge, Esq.

Michigan St.,

OH 43604 Harris, Esq.

f the General clear Regulat gton, DC 205 eventh Upda Nuclear Oper Docket No. 5 unsel:

to 10 C.F.R Order modif Operating C on 4 as affirm s disclosure osure 1 is res se opinion FE rely as witne ions. FENO update Enclo osure 2 prov pilations, and levant to the W

m rmation Ex

, Suite 520 l Counsel tory Commi 555-0001 ate to Manda rating Co., L 0-346 R. § 2.336, th fying the Init Company (FE med by the C s consist of served for th ENOC will b esses, and a C has not ye osure 1 when vides a descri d tangible th e admitted co change ission atory Disclo License Rene he Boards In tial Scheduli ENOC) is pro Commission the followin he names, ad base its posi copy of the et identified n it has ident iption, by ca hings in the p ontention. P osures Pursua ewal for Dav nitial Schedu ing Order da oviding the e n on March 2 ng:

ddresses, and tions on the analyses and witnesses fo tified its witn ategory and l possession, c Per the Sched ant to 10 C.F vis-Besse Nu uling Order d ated Novemb enclosed dis 27, 2012 (CL d telephone n contention a d authorities or any hearin nesses.

location, of t custody, or c duling Order F.R. § 2.336 uclear Power dated June 1 ber 2, 2011, sclosures for LI-12-18).

numbers of t and upon wh upon which ng on the con the documen control of FE r and our agr

FirstEnergy r Station, 15, 2011, and FirstEnergy r Intervenors the persons u hom FENOC h they base th ntention, and nts, data ENOC that m reement, the y

d the y

s upon C

heir d

may ese

Terry J. Lodge, Esq.

Brian G. Harris, Esq.

June 29, 2012 Page Two disclosures do not include privileged documents, or publicly-available documents unless FirstEnergy expects to rely on them at hearing. If you determine that you would like a copy of any of these documents, please inform me of which documents you would like, and I will provide a copy to you.

  • Enclosure 3 provides an index of documents, data compilations, or tangible things that may be relevant to the contention but that contain proprietary information, Sensitive Unclassified Non-Safeguards Information (SUNSI), or otherwise protected information. Upon request, FENOC will provide a copy under the terms of a Protective Order issued by the Board.

In order to compile Enclosures 2 and 3, a search was conducted of documents in FENOCs possession, custody, or control. The attached affidavit attests that all relevant materials identified by this search that are required to be disclosed under the Scheduling Order have been disclosed.

When FENOC identifies additional relevant documents or the witnesses for any hearing on the contention, FENOC will update these disclosures as required by the Boards Scheduling Order.

FENOC has been conservative in identifying documents for inclusion in Enclosures 2 and 3. By identifying documents in those Enclosures, FENOC does not necessarily concede that the documents are in fact relevant or material to the admitted contention.

Sincerely, Executed in Accord with 10 C.F.R. § 2.304(d)

Signed (electronically) by Timothy P. Matthews Timothy P. Matthews 1111 Pennsylvania Ave. NW Washington, DC 2004 (202) 739-5527 tmatthews@morganlewis.com Counsel for FirstEnergy Nuclear Operating Co.

Enclosures

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of

)

)

Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY

)

)

(Davis-Besse Nuclear Power Station, Unit 1)

)

)

AFFIDAVIT OF DAVID W. JENKINS

1.

My name is David W. Jenkins. I am a Senior Corporate Counsel II at the FirstEnergy Service Company. Working with the FirstEnergy Nuclear Operating Company (FENOC)

Project Manager of License Renewal, I manage the collection of documents, data compilations, and tangible things to comply with the mandatory disclosure requirements in 10 C.F.R. § 2.336 and the Atomic Safety and Licensing Boards Initial Scheduling Order dated June 15, 2011 (Scheduling Order) in this proceeding, and the Licensing Boards Order Granting Motion for Modification of Initial Scheduling Order dated November 2, 2011 in this proceeding.

2.

FENOC conducted a search of documents, data compilations, and tangible things in its possession, custody, and control for information relevant to the admitted contention as modified by the Commission (CLI-12-08), and in the possession, custody, and control of its affiliated companies, as specified in 10 C.F.R. § 2.336(a). As provided in 10 C.F.R. § 2.336(c), this search encompassed information and documents reasonably available to FENOC and its affiliated companies, including:

a.

Both electronic and paper documents;

2

b.

Corporate records, Davis-Besse license renewal project files, and documents in the possession and control of individuals who have worked on the Davis-Besse license renewal project or on matters potentially relevant to the admitted contention; and

c.

Documents, data compilations, and tangible things in the possession and control of AREVA, Inc. (AREVA), which assisted FENOC in preparing portions of the Davis-Besse Environmental Report.

3.

Consistent with the Boards Scheduling Order, Enclosure 2 to this Affidavit provides an index of relevant, non-privileged, non-protected documents, data compilations, and tangible things that were located as a result of this search.

4.

Consistent with the Boards Scheduling Order, Enclosure 3 to this Affidavit provides the index of relevant documents, data compilations, and tangible things containing information that FENOC believes are proprietary to FENOC or its affiliated companies or third parties, or falls within the category of Sensitive Unclassified, Non-Safeguards Information (SUNSI).

5.

FENOC has been conservative in identifying documents for inclusion in the Enclosures.

Accordingly, FENOC is not suggesting that just because a document is listed on the Enclosure that it is indeed relevant to the admitted contention.

6.

These disclosures are reasonably accurate and complete as of May 31, 2012.

3 The statements made above are true to the best of my knowledge, information, and belief.

I declare under penalty of perjury that the foregoing is true and correct.

Executed in Accord with 10 C.F.R. § 2.304(d)

Signed (electronically) by David W. Jenkins David W. Jenkins FirstEnergy Service Company 76 South Main Street Akron, OH 44308 Phone: (330) 384-5037 E-mail: djenkins@firstenergycorp.com Executed this 29th day of June 2012.

(Reserved)

First Energy-Davis-Besse License Renewal Proceeding Mandatory Disclosure Log Seventh Update, June 29, 2012 Log No.

Category Location*

Document Title Date Contentions FEDB-00000831 eMail;eMail without attachment Morgan, Lewis &

Bockius SAMA Documents 5/4/2012 Contention 4 FEDB-00000832 eMail;eMail with attachment Morgan, Lewis &

Bockius Transmittal of SAMA Basis Documents 5/10/2012 Contention 4 FEDB-00000833 Attachment Morgan, Lewis &

Bockius AREVA 01245.pdf 5/10/2012 Contention 4 FEDB-00000834 eMail;eMail with attachment Morgan, Lewis &

Bockius updated SAMA Table 3.6 5/18/2012 Contention 4 FEDB-00000835 Standard file;Standard file without attachment Morgan, Lewis &

Bockius Copy of BaseRelease Cindy.xls 5/7/2012 Contention 4

First Energy-Davis-Besse License Renewal Proceeding Proprietary Log Seventh Update, June 29, 2012 Log No.

Category Location*

Document Title Date Confidentiality Contentions FEDBPROP-00003712 eMail;eMail without attachment Morgan, Lewis &

Bockius

  • Confidential: RE: "Privileged &

Confidential" RE: Davis-Besse Level 3 Comment #18 Question 5/3/2012 FE Proprietary - 10 C.F.R. § 2.390(a)(4); Third-Party Proprietary - 10 C.F.R. § 2.390(a)(4)

Contention 4 FEDBPROP-00003713 eMail;eMail with attachment Morgan, Lewis &

Bockius "Privileged & Confidential" RE: Davis-Besse Level 3 Comment #18 Question 5/3/2012 FE Proprietary - 10 C.F.R. § 2.390(a)(4); Third-Party Proprietary - 10 C.F.R. § 2.390(a)(4)

Contention 4 FEDBPROP-00003714 eMail;eMail without attachment Morgan, Lewis &

Bockius Davis-Besse Level 3 Comment #18 Question 5/2/2012 FE Proprietary - 10 C.F.R. § 2.390(a)(4); Third-Party Proprietary - 10 C.F.R. § 2.390(a)(4)

Contention 4 FEDBPROP-00003715 eMail;eMail without attachment Morgan, Lewis &

Bockius Re: Davis-Besse Level 3 Comment #18 Question 5/3/2012 FE Proprietary - 10 C.F.R. § 2.390(a)(4); Third-Party Proprietary - 10 C.F.R. § 2.390(a)(4)

Contention 4 FEDBPROP-00003716 eMail;eMail without attachment Morgan, Lewis &

Bockius Fw: Davis-Besse Level 3 Comment #18 Question 5/3/2012 FE Proprietary - 10 C.F.R. § 2.390(a)(4); Third-Party Proprietary - 10 C.F.R. § 2.390(a)(4)

Contention 4 FEDBPROP-00003717 Standard file;Standard file without attachment Morgan, Lewis &

Bockius 32-9125650-004 (DB Level 3 PRA).pdf 5/4/2012 SUNSI - 10 C.F.R. § 2.390(d)(1)

Third-Party Proprietary - 10 C.F.R. § 2.390(a)(4)

Contention 4 FEDBPROP-00003718 eMail;eMail without attachment Morgan, Lewis &

Bockius RE: "Privileged & Confidential" RE:

Davis-Besse Level 3 Comment #18 Question 5/3/2012 FE Proprietary - 10 C.F.R. § 2.390(a)(4); Third-Party Proprietary - 10 C.F.R. § 2.390(a)(4)

Contention 4 FEDBPROP-00003719 eMail;eMail without attachment Morgan, Lewis &

Bockius

  • Confidential: Fw: RE: "Privileged &

Confidential" RE: Davis-Besse Level 3 Comment #18 Question 5/4/2012 FE Proprietary - 10 C.F.R. § 2.390(a)(4); Third-Party Proprietary - 10 C.F.R. § 2.390(a)(4)

Contention 4 FEDBPROP-00003720 eMail;eMail without attachment Morgan, Lewis &

Bockius RE: *Confidential: RE: "Privileged &

Confidential" RE: Davis-Besse Level 3 Comment #18 Question 5/3/2012 FE Proprietary - 10 C.F.R. § 2.390(a)(4); Third-Party Proprietary - 10 C.F.R. § 2.390(a)(4)

Contention 4

First Energy-Davis-Besse License Renewal Proceeding Proprietary Log Seventh Update, June 29, 2012 Log No.

Category Location*

Document Title Date Confidentiality Contentions FEDBPROP-00003721 eMail;eMail with attachment Morgan, Lewis &

Bockius RE: Davis-Besse Level 3 Comment #18 Question 5/3/2012 FE Proprietary - 10 C.F.R. § 2.390(a)(4); Third-Party Proprietary - 10 C.F.R. § 2.390(a)(4)

Contention 4 FEDBPROP-00003722 Attachment Morgan, Lewis &

Bockius image003.png 5/3/2012 FE Proprietary - 10 C.F.R. § 2.390(a)(4); Third-Party Proprietary - 10 C.F.R. § 2.390(a)(4)

Contention 4 FEDBPROP-00003723 Attachment Morgan, Lewis &

Bockius image006.png 5/3/2012 FE Proprietary - 10 C.F.R. § 2.390(a)(4); Third-Party Proprietary - 10 C.F.R. § 2.390(a)(4)

Contention 4 FEDBPROP-00003724 eMail;eMail without attachment Morgan, Lewis &

Bockius Fw: Davis-Besse Level 3 Comment #18 Question 5/3/2012 FE Proprietary - 10 C.F.R. § 2.390(a)(4); Third-Party Proprietary - 10 C.F.R. § 2.390(a)(4)

Contention 4

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of

)

)

Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY

)

)

(Davis-Besse Nuclear Power Station, Unit 1)

)

June 29, 2012

)

CERTIFICATE OF SERVICE I hereby certify that, on this date, a copy of FENOCs Seventh Update to Mandatory Disclosures Pursuant to 10 C.F.R. § 2.336 was filed with the Electronic Information Exchange in the above-captioned proceeding on the following recipients:

Administrative Judge William J. Froehlich, Chair Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: wjf1@nrc.gov Administrative Judge Dr. William E. Kastenberg Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: wek1@nrc.gov Office of the Secretary U.S. Nuclear Regulatory Commission Rulemakings and Adjudications Staff Washington, DC 20555-0001 E-mail: hearingdocket@nrc.gov Administrative Judge Dr. Nicholas G. Trikouros Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: nicholas.trikouros@nrc.gov Office of the General Counsel U.S. Nuclear Regulatory Commission Mail Stop O-15D21 Washington, DC 20555-0001 Edward L. Williamson Lloyd B. Subin Brian G. Harris Brian P. Newell Catherine E. Kanatas edward.williamson@nrc.gov; lloyd.subin@nrc.gov; brian.harris@nrc.gov; brian.newell@nrc.gov; catherine.kanatas@nrc.gov

2 Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Mail Stop: O-16C1 Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov Kevin Kamps Paul Gunter Beyond Nuclear 6930 Carroll Avenue, Suite 400 Takoma Park, MD 20912 E-mail: kevin@beyondnuclear.org; paul@beyondnuclear.org Michael Keegan Dont Waste Michigan 811 Harrison Street Monroe, MI 48161 E-mail: mkeeganj@comcast.net Terry J. Lodge 316 N. Michigan St., Ste. 520 Toledo, OH 43604 E-mail: tjlodge50@yahoo.com Signed (electronically) by Stephen J. Burdick Stephen J. Burdick Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, N.W.

Washington, DC 20004 Phone: 202-739-3000 Fax: 202-739-3001 E-mail: sburdick@morganlewis.com Counsel for FENOC