ML12181A354

From kanterella
Jump to navigation Jump to search
Seventh Update Mandatory Disclosues Pursuant 10 C.F.R. Firstenergy
ML12181A354
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/29/2012
From: Matthew T
FirstEnergy Corp, FirstEnergy Nuclear Operating Co, Morgan, Morgan, Lewis & Bockius, LLP
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 22864, ASLBP 11-907-01-LR-BD01, 50-346-LR
Download: ML12181A354 (13)


Text

Morgan, Lew wis & Bockius LLP 1111 Pennsyylvania Avenue, NW W

Washington, DC 20004 Tel: 202-7399-3000 Fax: 202-7399-3001 www.morgannlewis.com Timothy P. P Matthews 202.739.552 27 tmatthews@@morganlewis.com m June 29, 2012 Via Elecctronic Inforrmation Exchange Terry J. Lodge, L Esq.

316 N. Michigan M St.,, Suite 520 Toledo, OH O 43604 Brian G. Harris, Esq..

Office off the Generall Counsel U.S. Nucclear Regulattory Commiission Washinggton, DC 205 555-0001 RE: Seventh Updaate to Mandaatory Discloosures Pursuaant to 10 C.F F.R. § 2.336; FirstEnergyy Nuclear Operrating Co., License N L Reneewal for Davvis-Besse Nuuclear Powerr Station, D

Docket No. 50-346

Dear Couunsel:

Pursuant to 10 C.F.R R. § 2.336, thhe Boards Innitial Scheduuling Order dated d June 15, 1 2011, andd the Boards Order O modiffying the Inittial Scheduliing Order daated Novembber 2, 2011, FirstEnergyy Nuclear Operating O Company C (FEENOC) is prooviding the enclosed e dissclosures forr Intervenorss Contentioon 4 as affirm med by the Commission C n on March 27, 2 2012 (CL LI-12-18).

FENOCs disclosures consist of the followinng:

  • Encloosure 1 is resserved for thhe names, adddresses, andd telephone numbersn of the t persons upon u

whosse opinion FE ENOC will baseb its positions on the contention and a upon whhom FENOC C may relyr as witneesses, and a copy of the analyses andd authorities upon whichh they base thheir opiniions. FENOC has not yeet identified witnesses foor any hearinng on the conntention, andd will update u Enclo osure 1 whenn it has identtified its witnnesses.

  • Encloosure 2 prov vides a descriiption, by caategory and location, l of the t documennts, data comppilations, and d tangible thhings in the possession, p c custody, or control c of FEENOC that maym be rellevant to thee admitted coontention. Per P the Schedduling Orderr and our agrreement, theese

Terry J. Lodge, Esq.

Brian G. Harris, Esq.

June 29, 2012 Page Two disclosures do not include privileged documents, or publicly-available documents unless FirstEnergy expects to rely on them at hearing. If you determine that you would like a copy of any of these documents, please inform me of which documents you would like, and I will provide a copy to you.

  • Enclosure 3 provides an index of documents, data compilations, or tangible things that may be relevant to the contention but that contain proprietary information, Sensitive Unclassified Non-Safeguards Information (SUNSI), or otherwise protected information. Upon request, FENOC will provide a copy under the terms of a Protective Order issued by the Board.

In order to compile Enclosures 2 and 3, a search was conducted of documents in FENOCs possession, custody, or control. The attached affidavit attests that all relevant materials identified by this search that are required to be disclosed under the Scheduling Order have been disclosed.

When FENOC identifies additional relevant documents or the witnesses for any hearing on the contention, FENOC will update these disclosures as required by the Boards Scheduling Order.

FENOC has been conservative in identifying documents for inclusion in Enclosures 2 and 3. By identifying documents in those Enclosures, FENOC does not necessarily concede that the documents are in fact relevant or material to the admitted contention.

Sincerely, Executed in Accord with 10 C.F.R. § 2.304(d)

Signed (electronically) by Timothy P. Matthews Timothy P. Matthews 1111 Pennsylvania Ave. NW Washington, DC 2004 (202) 739-5527 tmatthews@morganlewis.com Counsel for FirstEnergy Nuclear Operating Co.

Enclosures

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of )

) Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY )

)

(Davis-Besse Nuclear Power Station, Unit 1) )

)

AFFIDAVIT OF DAVID W. JENKINS

1. My name is David W. Jenkins. I am a Senior Corporate Counsel II at the FirstEnergy Service Company. Working with the FirstEnergy Nuclear Operating Company (FENOC)

Project Manager of License Renewal, I manage the collection of documents, data compilations, and tangible things to comply with the mandatory disclosure requirements in 10 C.F.R. § 2.336 and the Atomic Safety and Licensing Boards Initial Scheduling Order dated June 15, 2011 (Scheduling Order) in this proceeding, and the Licensing Boards Order Granting Motion for Modification of Initial Scheduling Order dated November 2, 2011 in this proceeding.

2. FENOC conducted a search of documents, data compilations, and tangible things in its possession, custody, and control for information relevant to the admitted contention as modified by the Commission (CLI-12-08), and in the possession, custody, and control of its affiliated companies, as specified in 10 C.F.R. § 2.336(a). As provided in 10 C.F.R. § 2.336(c), this search encompassed information and documents reasonably available to FENOC and its affiliated companies, including:
a. Both electronic and paper documents;
b. Corporate records, Davis-Besse license renewal project files, and documents in the possession and control of individuals who have worked on the Davis-Besse license renewal project or on matters potentially relevant to the admitted contention; and
c. Documents, data compilations, and tangible things in the possession and control of AREVA, Inc. (AREVA), which assisted FENOC in preparing portions of the Davis-Besse Environmental Report.
3. Consistent with the Boards Scheduling Order, Enclosure 2 to this Affidavit provides an index of relevant, non-privileged, non-protected documents, data compilations, and tangible things that were located as a result of this search.
4. Consistent with the Boards Scheduling Order, Enclosure 3 to this Affidavit provides the index of relevant documents, data compilations, and tangible things containing information that FENOC believes are proprietary to FENOC or its affiliated companies or third parties, or falls within the category of Sensitive Unclassified, Non-Safeguards Information (SUNSI).
5. FENOC has been conservative in identifying documents for inclusion in the Enclosures.

Accordingly, FENOC is not suggesting that just because a document is listed on the Enclosure that it is indeed relevant to the admitted contention.

6. These disclosures are reasonably accurate and complete as of May 31, 2012.

2

The statements made above are true to the best of my knowledge, information, and belief.

I declare under penalty of perjury that the foregoing is true and correct.

Executed in Accord with 10 C.F.R. § 2.304(d)

Signed (electronically) by David W. Jenkins David W. Jenkins FirstEnergy Service Company 76 South Main Street Akron, OH 44308 Phone: (330) 384-5037 E-mail: djenkins@firstenergycorp.com Executed this 29th day of June 2012.

3 (Reserved)

First Energy-Davis-Besse License Renewal Proceeding Mandatory Disclosure Log Seventh Update, June 29, 2012 Log No. Category Location* Document Title Date Contentions eMail;eMail without Morgan, Lewis & SAMA FEDB-00000831 attachment Bockius Documents 5/4/2012 Contention 4 Transmittal of eMail;eMail with Morgan, Lewis & SAMA Basis FEDB-00000832 attachment Bockius Documents 5/10/2012 Contention 4 Morgan, Lewis & AREVA FEDB-00000833 Attachment Bockius 01245.pdf 5/10/2012 Contention 4 eMail;eMail with Morgan, Lewis & updated SAMA FEDB-00000834 attachment Bockius Table 3.6 5/18/2012 Contention 4 Copy of Standard file;Standard Morgan, Lewis & BaseRelease FEDB-00000835 file without attachment Bockius Cindy.xls 5/7/2012 Contention 4

  • Morgan Lewis is located at 1111 Pennsylvania Avenue, NW Washington, DC 20004 1 First Energy-Davis-Besse License Renewal Proceeding Proprietary Log Seventh Update, June 29, 2012 Log No. Category Location* Document Title Date Confidentiality Contentions eMail;eMail without *Confidential: RE: "Privileged & 5/3/2012 FE Proprietary - 10 C.F.R. § Contention 4 attachment Confidential" RE: Davis-Besse Level 3 2.390(a)(4); Third-Party Morgan, Lewis & Comment #18 Question Proprietary - 10 C.F.R. § FEDBPROP-00003712 Bockius 2.390(a)(4) eMail;eMail with "Privileged & Confidential" RE: Davis- 5/3/2012 FE Proprietary - 10 C.F.R. § Contention 4 attachment Besse Level 3 Comment #18 Question 2.390(a)(4); Third-Party Morgan, Lewis & Proprietary - 10 C.F.R. § FEDBPROP-00003713 Bockius 2.390(a)(4) eMail;eMail without Davis-Besse Level 3 Comment #18 5/2/2012 FE Proprietary - 10 C.F.R. § Contention 4 attachment Question 2.390(a)(4); Third-Party Morgan, Lewis & Proprietary - 10 C.F.R. § FEDBPROP-00003714 Bockius 2.390(a)(4) eMail;eMail without Re: Davis-Besse Level 3 Comment #18 5/3/2012 Contention 4 FE Proprietary - 10 C.F.R. § attachment Question 2.390(a)(4); Third-Party Morgan, Lewis & Proprietary - 10 C.F.R. § FEDBPROP-00003715 Bockius 2.390(a)(4) eMail;eMail without Fw: Davis-Besse Level 3 Comment #18 5/3/2012 FE Proprietary - 10 C.F.R. § Contention 4 attachment Question 2.390(a)(4); Third-Party Morgan, Lewis & Proprietary - 10 C.F.R. § FEDBPROP-00003716 Bockius 2.390(a)(4)

Standard 32-9125650-004 (DB Level 3 PRA).pdf 5/4/2012 Contention 4 file;Standard file SUNSI - 10 C.F.R. § 2.390(d)(1) without attachment Morgan, Lewis &  ; Third-Party Proprietary - 10 FEDBPROP-00003717 Bockius C.F.R. § 2.390(a)(4) eMail;eMail without RE: "Privileged & Confidential" RE: 5/3/2012 Contention 4 attachment Davis-Besse Level 3 Comment #18 FE Proprietary - 10 C.F.R. § Question 2.390(a)(4); Third-Party Morgan, Lewis & Proprietary - 10 C.F.R. § FEDBPROP-00003718 Bockius 2.390(a)(4) eMail;eMail without *Confidential: Fw: RE: "Privileged & 5/4/2012 FE Proprietary - 10 C.F.R. § Contention 4 attachment Confidential" RE: Davis-Besse Level 3 2.390(a)(4); Third-Party Morgan, Lewis & Comment #18 Question Proprietary - 10 C.F.R. § FEDBPROP-00003719 Bockius 2.390(a)(4) eMail;eMail without RE: *Confidential: RE: "Privileged & 5/3/2012 Contention 4 attachment Confidential" RE: Davis-Besse Level 3 FE Proprietary - 10 C.F.R. § Comment #18 Question 2.390(a)(4); Third-Party Morgan, Lewis & Proprietary - 10 C.F.R. § FEDBPROP-00003720 Bockius 2.390(a)(4)

First Energy-Davis-Besse License Renewal Proceeding Proprietary Log Seventh Update, June 29, 2012 Log No. Category Location* Document Title Date Confidentiality Contentions eMail;eMail with RE: Davis-Besse Level 3 Comment #18 5/3/2012 Contention 4 attachment Question FE Proprietary - 10 C.F.R. § 2.390(a)(4); Third-Party Morgan, Lewis & Proprietary - 10 C.F.R. § FEDBPROP-00003721 Bockius 2.390(a)(4)

Attachment image003.png 5/3/2012 FE Proprietary - 10 C.F.R. § Contention 4 2.390(a)(4); Third-Party Morgan, Lewis & Proprietary - 10 C.F.R. § FEDBPROP-00003722 Bockius 2.390(a)(4)

Attachment image006.png 5/3/2012 FE Proprietary - 10 C.F.R. § Contention 4 2.390(a)(4); Third-Party Morgan, Lewis & Proprietary - 10 C.F.R. § FEDBPROP-00003723 Bockius 2.390(a)(4) eMail;eMail without Fw: Davis-Besse Level 3 Comment #18 5/3/2012 FE Proprietary - 10 C.F.R. § Contention 4 attachment Question 2.390(a)(4); Third-Party Morgan, Lewis & Proprietary - 10 C.F.R. § FEDBPROP-00003724 Bockius 2.390(a)(4)

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of )

) Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY )

)

(Davis-Besse Nuclear Power Station, Unit 1) ) June 29, 2012

)

CERTIFICATE OF SERVICE I hereby certify that, on this date, a copy of FENOCs Seventh Update to Mandatory Disclosures Pursuant to 10 C.F.R. § 2.336 was filed with the Electronic Information Exchange in the above-captioned proceeding on the following recipients:

Administrative Judge Administrative Judge William J. Froehlich, Chair Dr. Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: wjf1@nrc.gov E-mail: nicholas.trikouros@nrc.gov Administrative Judge Office of the General Counsel Dr. William E. Kastenberg U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel Mail Stop O-15D21 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Edward L. Williamson E-mail: wek1@nrc.gov Lloyd B. Subin Brian G. Harris Brian P. Newell Office of the Secretary Catherine E. Kanatas U.S. Nuclear Regulatory Commission edward.williamson@nrc.gov; Rulemakings and Adjudications Staff lloyd.subin@nrc.gov; Washington, DC 20555-0001 brian.harris@nrc.gov; E-mail: hearingdocket@nrc.gov brian.newell@nrc.gov; catherine.kanatas@nrc.gov

Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Mail Stop: O-16C1 Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov Michael Keegan Dont Waste Michigan 811 Harrison Street Monroe, MI 48161 Kevin Kamps E-mail: mkeeganj@comcast.net Paul Gunter Beyond Nuclear 6930 Carroll Avenue, Suite 400 Takoma Park, MD 20912 Terry J. Lodge E-mail: kevin@beyondnuclear.org; 316 N. Michigan St., Ste. 520 paul@beyondnuclear.org Toledo, OH 43604 E-mail: tjlodge50@yahoo.com Signed (electronically) by Stephen J. Burdick Stephen J. Burdick Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, N.W.

Washington, DC 20004 Phone: 202-739-3000 Fax: 202-739-3001 E-mail: sburdick@morganlewis.com Counsel for FENOC 2