Official Exhibit - ENT000061-00-BD01 - Flow Accelerated Corrosion Inspection Points for 3R14 Er IP3-05-24045
ML12338A445
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/28/2012
From:
Entergy Nuclear Operations
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 22102, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01
Download: ML12338A445 (20)


Text

United States Nuclear Regulatory Commission Official Hearing Exhibit Entergy Nuclear Operations, Inc.

In the Matter of:

(Indian Point Nuclear Generating Units 2 and 3)

ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #: ENT000061-00-BD01 Identified: 10/15/2012 Admitted: 10/15/2012 Withdrawn:

Rejected: Stricken: ENT000061 Other: Submitted: March 28, 2012 FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 T ER N R D I O N P G KS IN R N E IN BE O O PT IO O LD TIO W ZE AR M P K RI F LA PR SI M U R AT F U T RA E N AM O SC C A S IN P E D PE R W E EX D LO SC IN PA PI PI EXTRACTION Checworks pick. Low Checworks 33 LP TURBINE TO 33A 28" X 1 EX-04.2-09T IP3-05-24954 Inside 33 condenser. Yes TS No Yes 50007 hours. Inspection inside FEEDWATER HEATER 20" condenser.

Preseparators to Header 35. Exam Turbine Building. Located Checworks pick. Low Checworks 2 EX-02.14-07P IP3-05-24843 consists of Extraction Steam pipe EX- approximately 17' North and 5' Yes Yes No Yes 50001 28" hours. Carbon steel component 02.14-07P. East of B4/18.8, El.26' . downstream of non-susceptible material. Entrance effect.

From Power Uprate Checworks analysis. One of top 5 Turbine Building. Located Extraction piping from 33 LP turbine to components showing greatest 3 EX-04.13-07T IP3-05-24846 approximately 10' North and 4' Yes Yes No Yes 50008 20" 33B feedwater heater. increase in predicted wear rate West of BB1/15. El 24' due to uprate. Calculation 040711.

Turbine Building. Located Extraction piping from 33 LP turbine to OE from Unit 2. High wear found 4 EX-04.4-08E IP3-05-24847 approximately 8' south of A/18. No Yes No Yes 50007 28" 33A feedwater heater. on similar elbow.

El 39' Turbine Building. Located Extraction piping from 33 LP turbine to OE from Unit 2. High wear found 5 EX-04.11-08E IP3-05-24848 approximately 2' East and 1' No Yes No Yes 50008 28" 33B feedwater heater. on similar elbow.

North of A/16. El 39' Turbine Building. Located Calculation reinspection. IP3-Extraction piping from 31 LP turbine to 6 EX-04.21-02P IP3-05-24849 approximately 10' North and 5' Yes Yes No Yes 50004 20" CALC-EX-03082. RSL 12/2010.

33C feedwater heater.

East of BB1/15. El 24' Inspect EX-04.21-02P Checworks pick. Inspect elbow Turbine Building. Located Extraction piping from 33 LP turbine to and upstream and downstream 7 EX-03.1A-14E IP3-05-24850 approximately 2' East of A/18. El No Yes No Yes 50005 20" 34A feedwater heater. piping, EX-03.1A-13P and EX-39' 03.1A-15P.

Two back to back 90 degree elbows and 6" UPSM and Turbine Building. Located Other areas of this piping DNSM.immediately upsm of 8 FAC-07-EX-01 IP3-05-24984 approximately 5' North of Heater Yes Yes No Yes 9321-F-20203 2" experienced leaks in previous crossunder steam line drip pot drain Drain Tank. EL 30' cycle.

check valve western most valve above heater drain tank Piping segments located on the Calculation reinspection, 97-PT-Inspect pipe downstream of the NW mezz. Platform under HP 31; WO 96-03869-31 9 FAC-07-EX-02 IP3-05-24851 crossunder drip pot to valve MS-125-1. No Yes No Yes 9321-F-20203 10",2" Turbine. Norhtwest corner Calculation IP3-CALC-MS-02494.

97-PT-31 approximate El. 31' RSL May 2010 Piping segments to include DNSM Turbine Building. Located Steam trap leaking; IP3 10 FAC-07-EST-01 IP3-05-24853 piping of EST-2 and bypass valve 6EX- approximately 1' North and on the No Yes No Yes 9321-F-20313 3/4" 00664. Found trap with steam 35 to 12" DNSM of valve 6EX-34-3 centerline of A/20. El 15' cuts. Steam trap report.

1 of 15 3R14 FAC Scope (Ipe0067429).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 T ER N R D O N P G KS IN R TI N LD O E IN BE O O IP IO O TI W ZE AR P K R LA PR SI UM R C AT FF T RA EM N AM O C A SU IN PE D PE R W ES EX D LO SC IN PA PI PI FEEDWATER Turbine Building. Located Checworks pick. Low Checworks 11 FW-02.1A-01N IP3-05-24854 36A FEEDWATER HTR TO SG HDR approximately 12' South of Yes Yes No Yes 50039 18" hours. Common scaffold for FW-CC3/20. El 44' 02.1A-01N, -02E, -03P and -04E Turbine Building. Located Checworks pick. Low Checworks 12 FW-02.1A-02E IP3-05-24856 36A FEEDWATER HTR TO SG HDR approximately 12' South of Yes Yes No Yes 50039 18" hours. Common scaffold for FW-CC3/20. El 44' 02.1A-01N, -02E, -03P and -04E Turbine Building. Located Checworks pick. Low Checworks 13 FW-02.1A-03P IP3-05-24857 36A FEEDWATER HTR TO SG HDR approximately 12' South of Yes Yes No Yes 50039 18" hours. Common scaffold for FW-CC3/20. El 44' 02.1A-01N, -02E, -03P and -04E Turbine Building. Located Checworks pick. Low Checworks 14 FW-02.1A-04E IP3-05-24858 36A FEEDWATER HTR TO SG HDR approximately 12' South of Yes Yes No Yes 50039 18" hours. Common scaffold for FW-CC3/20. El 44' 02.1A-01N, -02E, -03P and -04E Turbine Building. Located Checworks pick. Low Checworks Main boiler discharge header to 36 15 FW-01.3-13P IP3-05-24859 approximately 1' West and 1' Yes Yes No Yes 50039 30" hours. Common scafflod for FW-feedwater heaters.

South of A/20. El 31' 01.3-13P and -14E.

Turbine Building. Located Checworks pick. Low Checworks Main boiler discharge header to 36 16 FW-01.3-14E IP3-05-24860 approximately 1' West and 1' Yes Yes No Yes 50039 30" hours. Common scafflod for FW-feedwater heaters.

South of A/20. El 31' 01.3-13P and -14E.

Turbine Building. Located Feedwater header to Steam Checworks pick. Low Checworks 17 FW-02.4-11E IP3-05-24861 approximately 3' South and 2' Yes Yes No Yes 50040 30" Generators. hours.

East of B8/22. El 30' Feedwater to SG 31. Exam consists of Aux. Boiler Building. Located 12" X Calculation reinspection IP3-18 FW-02.8A-26R IP3-04-13353 Feedwater reducer FW-02.8A-26R approximately 4' North and 14' No Yes No Yes 50040 18" CALC-FW-03815, Rev. 0. 3R12 DNSM of FCV-417. West of H9/22.1, El. 22 reducer inspection. Deferred from 3R13.

Feedwater to SG 32. Exam consists of Aux Boiler Building El. 22'. 12" X Calculation reinspection. Confirm 19 FW-02.8B-25R IP3-05-24864 reducer FW-2.8B-25R, UPSM of FCV- Located approximately 9' North No Yes No Yes 50040 18" wear rate.

427. and 16' West of H9/22.1 reducer Feedwater to SG 33. Exam consists of Aux Boiler Building. Located 12" X Calculation reinspection. Also 20 FW-02.8D-24R IP3-05-24866 reducer FW-02.8D-24R, UPSM of FCV- approximately 2' South and 10' No Yes No Yes 50040 18" dnsm reducer FW-02.8D-25R.

437. West of H9/23, El 22'. reducer Confirm wear rate.

2 of 15 3R14 FAC Scope (Ipe0067429).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 T ER N R D O N P G KS IN R TI N LD O E IN BE O O IP IO O TI W ZE AR P K R LA PR SI UM R C AT FF T RA EM N AM O C A SU IN PE D PE R W ES EX D LO SC IN PA PI PI Aux Boiler Building. Located Checworks pick. Low Checworks SG header to 32 Feedwater bypass 30"X6" 21 FW-02.5-03T IP3-05-24985 approximately 2' West and 8' Yes Yes No Yes 50040 hours. Indclude downstream pipe line, UPSM of FCV 427L. tee North of H2/22.1, El 43'. FW-02.5-02P.

Checworks pick. Low Checworks 22 FW-03.1D-08B IP3-05-24867 Feedwater to 33 SG VC. El 104' Yes Yes No Yes 50045 18" hours. Indclude downstream pipe FW-03.1D-09P.

SG Header to SG 34. Exam consists EC-H-50046 Calculation reinspection IP3-23 FW-03.1C-13P IP3-04-13354 of feedwater pipe FW-03.1C-13P near VC El. 104' Yes Yes No Yes 9321-F-25503 18" pipe CALC-FW-03807, Rev. 0 3R12 SG inlet. 9321-F-25523 inspection. Deferred from 3R13.

Aux FW Building 36'. Component Calculation reinspection IP3-Feedwater to 32 SG. Exam includes to be examined includes CALC-FW-02471 0, 0A. Confirm 24 FW-02.8B-13F IP3-05-24868 piping UPSM and DNSM of flow approximately 5' upstream and 6' Yes Yes No Yes 50041 18" pipe wear rate that was determined element per previous exams. downstream of connection from R09 and R10 inspections.

containing valve BFD-64-4.

Turbine Building. Located Feedwater to 36C feedwater heater, Higher inlet velocities due to SPU 25 FW-01.6C-10N IP3-05-24869 approximately 12' South and 10' Yes Yes No Yes 50042 18" pipe inlet nozzle. per SPU project manager West of A/20. El 36' Turbine Building. Located Feedwater to 36A feedwater heater, Higher inlet velocities due to SPU 26 FW-01.6A-12N IP3-05-24870 approximately 12' South and 4' Yes Yes No Yes 50039 18" pipe inlet nozzle. per SPU project manager East of CC3/20. El 36' 3 of 15 3R14 FAC Scope (Ipe0067429).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 T ER N R D O N P G KS IN R TI N LD O E IN BE O O IP IO O TI W ZE AR P K R LA PR SI UM R C AT FF T RA EM N AM O C A SU IN PE D PE R W ES EX D LO SC IN PA PI PI CONDENSATE Turbine Building. Located Checworks pick. Low Checworks 27 CD-06.3B-02N IP3-05-24872 32 Main boiler pump inlet nozzle. approximately 5' West and 5' Yes Yes No Yes 50064 hours. Recommended by South of A/17.

snapshot assessment.

Turbine building at FWH 35B. Calculation reinspection IP3-Located approximately 7' South CALC-CD-03423, Rev. 0 R11 Condensate from Feedwater heater 28 CD-05.1B-04P IP3-04-13366 and 15' East of CC3/18, El. 40' Yes Yes No Yes 50064 14" pipe inspection. Inspect above and 35B to header.

and from 15' for access to pipe below floor penetration. Deferred under 36' floor. from 3R13.

Turbine Building. Located Selection from Checworks Pass 2 Condensate from Feedwater heater 29 CD-03.1C-01N IP3-05-24873 approximately 10' South and 10' Yes Yes No Yes 50062 14" analysis. Include downstream 33C to heater 34C.

West of A/14. El 44' elbow CD-03.1C-02E Turbine Building. Located Condensate from Feedwater heater Selection from Checworks Pass 2 30 CD-04.1C-01N IP3-05-24874 approximately 6' South and 15' Yes Yes No Yes 50062 14" 34C to heater 35C. analysis.

West of A/16. El 43' Selection from Checworks Pass 2 analysis. Recommended by Turbine Building. Located Condensate from HTR 34C to HTR snapshot assessment. Include 31 CD-04.1C-5E IP3-05-24875 approximately 3' South and 8' Yes Yes No Yes 50062 14" 35C downstream pipe CD-04.1C-06P.

East of BB/16. El 32' Common scaffold for CD-04.1C-5E and -7E.

Selection from Checworks Pass 2 Turbine Building. Located analysis. Recommendation by Condensate from HTR 34C to HTR 32 CD-04.1C-7E IP3-05-24876 approximately 3' South and 8' Yes Yes No Yes 50062 14" snapshot assessment. Common 35C East of BB/16. El 32' scaffold for CD-04.1C-5E and -

7E.

Turbine Building. Located Calculation reinspection IP3-Condensate from Feedwater heater 24"X14" 33 CD-2.1C-12T IP3-05-24877 approximately 15' North and 5' Yes Yes No Yes 50061 CALC-COND-02446 RSL 32C to header tee East of D6/14.3. El 48' 12/2009 Calculation reinspection IP3-Turbine Building. Located Condensate from header to Feedwater CALC-COND-02446 RSL 34 CD-2.8C-03P IP3-05-24882 approximately 8' East and 8' Yes Yes No Yes 50061 14" heater 33C. On top of SWAP lab 10/2009. Exam to include CD-South of BB/14. El 34' 2.8C-02E and CD-2.8C-02P.

Calculation reinspection IP3-Turbine Building. Located CALC-CD-03423 RSL 9/2009.

Condensate from header to Feedwater 35 CD-2.8B-01P IP3-05-24883 approximately 3' West and 8' Yes Yes No Yes 50061 14" Exam to include CD-2.8B-02E.

heater 33B. On top of SWAP lab South of BB/14. El 34' Common scaffold for CD-2.8B-01P and -03P.

Calculation reinspection IP3-Turbine Building. Located Condensate from header to Feedwater CALC-CD-03423 RSL 7/2010.

36 CD-2.8B-03P IP3-05-24886 approximately 3' West and 8' Yes Yes No Yes 50061 14" heater 33B. On top of SWAP lab Common scaffold for CD-2.8B-South of BB/14. El 34' 01P and -03P.

4 of 15 3R14 FAC Scope (Ipe0067429).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 T ER N R D O N P G KS IN R TI N LD O E IN BE O O IP IO O TI W ZE AR P K R LA PR SI UM R C AT FF T RA EM N AM O C A SU IN PE D PE R W ES EX D LO SC IN PA PI PI Turbine Building. Located Condensate from Feedwater heater Calculation reinspection IP3-37 CD-04.1A-04P IP3-05-24887 approximately 4' South of CC3/16. No Yes No Yes 50062 14" 34A to heater 35A. CALC-CD-03423 RSL 7/2010 El 42' OE17378, wear found on Reducer immediately downstream Condensate Polisher Facility.

discharge piping in CP at South Condensate Polisher Service Vessel B Component located IP3V-0561- 14" X 38 FAC-07-CP-01 IP3-05-24986 Yes No Yes Yes Texas Project, Unit 1. Common Resin Trap and UPSM of Effluent approximately 10' East and on 0170 12" scaffold for FAC-07-CP-01 and -

Valve EB. centerline of column B/6 02.

Elbow downstream of Condensate OE17378, wear found on Condensate Polisher Facility.

Polisher Service Vessel B Effluent discharge piping in CP at South Component located IP3V-0561-39 FAC-07-CP-02 IP3-05-24987 Valve EB and UPSM of Condensate Yes No Yes Yes 12" Texas Project, Unit 1. Common approximately 3' North and 10' 0170 polisher Service Vessel B Outlet scaffold for FAC-07-CP-01 and -

East of column B/6.

Isolation Valve CD-418. 02.

5 of 15 3R14 FAC Scope (Ipe0067429).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 T ER N R D O N P G KS IN R TI N LD O E IN BE O O IP IO O TI W ZE AR P K R LA PR SI UM R C AT FF T RA EM N AM O C A SU IN PE D PE R W ES EX D LO SC IN PA PI PI HEATER DRAINS Checworks pick. This line has no Turbine Building. Located inspections. Inspection will allow Feedwater heater 35B drain to Heater 40 HD-3.1B-09E IP3-05-24889 approximately 10' East of No Yes Yes Yes 50018 10" entire run to be calibrated, thus drain tank.

CC3/18. El 17' greatly reducing future inspections.

Turbine Building. Located Feedwater heater 35B drain to Heater Checworks pick. No inspection 41 HD-2.1B-02R IP3-05-24890 approximately 10' South and 1' Yes Yes No Yes 50018 10"X6" drain tank. downstream of LCV.

West of BB/19. El 22' Checworks pick. Low Turbine Building. Located 31 Heater drain pump discharge to 16"X12" Checworlks hours on this tee. No 42 HD-12.2A-08T IP3-05-24891 approximately 15' South of Yes Yes No Yes 50079 header. tee recent inspections. Last was CC3/20. El 32' Tdat.

Turbine Building. Located HTR 34C to HTR 33C. Exam consists 6" X 3" Calculation reinspection. IP-43 HD-05.1C-02R IP3-05-24892 approximately 5' North and 19' No Yes No Yes 50020 of reducer HD-05.1C-02R. rducr CALC-04-01787 RSL 11/2010 West of A/12, El. 36'.

Recommendation from Shaw Feedwater heater 32A operating vent, Power Uprate Engineering Report Turbine Building at FWH 32A.

downstream of valve 2HD-3-1. Exam 9321-20223 Balance-of-Plant IP3 section 44 FAC-07-HD-01 IP3-05-24896 Located approx 15' North and 2' No Yes No Yes 2 1/2" to consist of 2 elbows and 12" dnsm Sh 2 12.4.2 Flow Accelerated East of D6/17.3. El 38' pipe. Corrosion Program Uprate Evaluation.

Calculation reinspection IP3-FWH 34B subcooler zone vent. Turbine Building approximately CALC-HD-02493. High wear rate 45 FAC-07-HD-02 IP3-05-24897 Upstream of 4HD-4-2 per previous 10' South and 10' East of CC3/16. No Yes No Yes 9321-20223 1" indication from previous exam. El 36' inspections (97-PT-5, 01-PT-35).

32A feedwater heater dump to 33 Turbine Building. Located From Leak report, LCV-1138 46 FAC-07-HD-03 IP3-05-24988 condenser. 90 Elbow and 12" DNSM approximately 5' East of D6/17.3. No Yes No Yes 9321-20223 6" leaking to condenser piping, DNSM of valve LCV-1138 El 15' IP3-05-24898 FWH 34A Operating vent, downstream Turbine Building. Located OE from Unit 3; leak in similar canceled 47 FAC-07-HD-04 of valve 4HD-3-1. Last elbow before approximately 4' North and 1' No No Yes Yes 9321-20223 1 1/2" location on FWH 34B. CR-IP3-IP3-06-24732 pipe sleeve in floor East of CC3/14. El 36' 2004-00650. Small bore report.

REPLACE FWH 34C Operating vent, downstream Turbine Building. Located OE from Unit 3; leak in similar 48 FAC-07-HD-05 IP3-05-24899 of valve 4HD-3-3. Last elbow before approximately 4' North and 25' No No Yes Yes 9321-20223 1 1/2" location on FWH 34B. CR-IP3-pipe sleeve in floor East of CC3/14. El 36' 2004-00650. Small bore report.

6 of 15 3R14 FAC Scope (Ipe0067429).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 T ER N R D O N P G KS IN R TI N LD O E IN BE O O IP IO O TI W ZE AR P K R LA PR SI UM R C AT FF T RA EM N AM O C A SU IN PE D PE R W ES EX D LO SC IN PA PI PI REHEATER DRAINS Piping segments located Selection from Checworks Pass 2 49 RHD-01.3A-02P IP3-05-24900 Reheater 32A to Reheater Drain tank. approximately 17' North and 16' Yes Yes No Yes 50012 6" analysis. No inspection on this East of A/15, El. 60'. line.

Turbine Building. Located Checworks pick. Low Checworks 50 RHD-02.4A-06L IP3-05-24902 RHD 32A TO HDR. approximately 2' East and 5' Yes Yes No Yes 50015 10"X6" hours on this L. Unususl North of A/18. El 33' configuration.

Turbine Building. Located Checworks pick. Low Checworks 8"X6" 51 RHD-02.10A-11T IP3-05-24904 RHD HDR TO 36B HTR. approximately 4' North and 2' Yes Yes No Yes 50015 hours. Few inspections on this tee West of BB/19. El 33' line.

Turbine Building. Located Checworks pick. Low Checworks 52 RHD-02.12B-11T IP3-05-24905 RHD HDR TO 36B HTR. approximately 30' West and 10' No Yes No Yes 50010 6" tee hours. Few inspections on this North of A/18. El 43' line.

Turbine Building. Located Checworks pick. Low Checworks 53 RHD-02.14B-12T IP3-05-24906 RHD HDR TO 36C HTR. approximately 20' West and 10' No Yes No Yes 50010 6" tee hours. Few inspections on this North of A/18. El 43' line.

Turbine Building. Located Selection from Checworks Pass 2 54 RHD-02.6A-06L IP3-05-24907 RHD 33A TO HDR. approximately 2' East and 5' Yes Yes No Yes 50015 10"X6" analysis. Low Checworks hours, North of A/18. El 33' unusual geometry.

Turbine Building. Located Checworks pick. Low Checworks 10"X6" 55 RHD-02.9A-11T IP3-05-24908 RHD HDR TO 36C HTR. Above HDT. approximately 20' South and 20' Yes Yes No Yes 50015 hours. Few inspections on this tee West of A/19. El 32' line.

Turbine Building. Located RHD 33A TO HDR. Downstream of 6"X4" Calculation reinspection.IP3-56 RHD-02.5A-02R IP3-05-24910 approximately 3' East and 8' No Yes No Yes 50015 valve LCV-1104B reducer CALC-RHD-03450. RSL 1/2009 North of A/18. El 36' Turbine Building. Located RHD 33A TO HDR. Downstream of Calculation reinspection.IP3-57 RHD-02.6A-02E IP3-05-24911 approximately 3' East and 8' No Yes No Yes 50015 6" valve LCV-1104B CALC-RHD-03450. RSL 10/2009 North of A/18. El 36' 7 of 15 3R14 FAC Scope (Ipe0067429).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 T ER N R D O N P G KS IN R TI N LD O E IN BE O O IP IO O TI W ZE AR P K R LA PR SI UM R C AT FF T RA EM N AM O C A SU IN PE D PE R W ES EX D LO SC IN PA PI PI RH 33 to Header. Exam consists of Turbine Building. Located Calculation reinspection for both 58 RHD-02.6A-03P IP3-04-13370 RHD-02.6A-03P. Downstream of valve approximately 3' East and 8' No Yes No Yes 50015 6" components. IP3-CALC-RHD-LCV-1104B North of A/18. El 36' 03450. R11 inspection. Deferred from 3R13. RSL 12/2008 Turbine Building. Located RHD 31A TO HDR. Downstream of 59 RHD-02.2A-02E IP3-05-24912 approximately 2' East and 3' No Yes No Yes 50015 6" Calculation reinspection. IP3-valve LCV-1104C North of A/18. El 36' CALC-RHD-03450. RSL 6/2010 Turbine Building. Located RHD 32A TO HDR. Downstream of 6"X4" Calculation reinspection. IP3-60 RHD-02.3A-02R IP3-05-24913 approximately 3' East and 10' No Yes No Yes 50015 valve LCV-1104A reducer CALC-HD-00687. RSL 2/2011 North of A/18. El 36' Higher inlet velocities from SPU Turbine Building. Located per SPU project manager, exam 61 RHD-02.13B-01N IP3-05-24914 RHD inlet nozzles to 36B heater. approximately 30' West and 10' Yes Yes No Yes 50010 8" to consist of nozzle and North of A/18. El 43' surrounding shell.

Higher inlet velocities from SPU Turbine Building. Located per SPU project manager, exam 62 RHD-02.14A-01N IP3-05-24915 RHD inlet nozzles to 36B heater. approximately 30' West and 10' Yes Yes No Yes 50015 8" to consist of nozzle and North of A/18. El 43' surrounding shell.

Higher inlet velocities from SPU Turbine Building. Located per SPU project manager, exam 63 RHD-02.15B-01N IP3-05-24916 RHD inlet nozzles to 36C heater. approximately 20' West and 10' Yes Yes No Yes 50010 8" to consist of nozzle and North of A/18. El 43' surrounding shell.

Higher inlet velocities from SPU Turbine Building. Located per SPU project manager, exam 64 RHD-02.16A-01N IP3-05-24917 RHD inlet nozzles to 36C heater. approximately 20' West and 10' Yes Yes No Yes 50015 8" to consist of nozzle and North of A/18. El 43' surrounding shell.

31B Reheater Drain tank to condenser. Turbine Building. Located From Leak report, LCV-1105C 65 FAC-07-RHD-01 IP3-05-24989 Pipe and reducer downstream of RHD- approximately 12' South of No Yes No Yes 50017 8"X6" leaks to condenser.

LCV-1105C. B4/15.7. El 41' Turbine Building. Located Leak found downstream of valve Main steam trap header to discharge approximately 4' South and 3" MS-97 due to corrosion. Inspect 66 FAC-07-RHD-02 IP3-05-24990 No No Yes Yes 9321-21313 4" canal East of column D1/13, El. upstream of section to be 18'.North of DCT. El 15' replaced via WO IP3-05-0500 8 of 15 3R14 FAC Scope (Ipe0067429).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 T ER N R D O N P G KS IN R TI N LD O E IN BE O O IP IO O TI W ZE AR P K R LA PR SI UM R C AT FF T RA EM N AM O C A SU IN PE D PE R W ES EX D LO SC IN PA PI PI MSR DRAINS Checworks pick. Need inspections on parallel trains and varied geometry for model Turbine Building. Located 67 MSD-01.3B-03E IP3-05-24930 31B MSR drain to MSR drain tank Yes Yes No Yes 50078 calibration. OE from Calvert underneath 31B MSR Cliffs. Common scaffold with MSD-01.3B-03E and MSD-01.1B-12" 06T Checworks pick. Need inspections on parallel trains and varied geometry for model Turbine Building. Located 68 MSD-01.1B-06T IP3-05-24931 31B MSR drain to MSR drain tank Yes Yes No Yes 50078 12" calibration. OE from Calvert underneath 31B MSR Cliffs. Common scaffold with MSD-01.3B-03E and MSD-01.1B-06T Calculation reinspection 99-PT-Piping segments from MSR 31A.

Piping segments are located 25-2 IP3-CALC-MSR-03132. May Exam consists of 12 components 9321-F-29013-69 FAC-07-VCD-01 IP3-05-24991 approximately 2' South and 1' Yes Yes No Yes 3" be descoped if recommended inspected in FAC exam 99-PT-25, UT 1 East of B4/17.3. El 45' VCD piping replacements report 99UT258, WO 99-02585-34.

implemented.

Calculation reinspection 99-PT-Piping segments from MSR 31B, back Piping segments are located 29-5 IP3-CALC-MSR-03132. May 9321-F-29013-70 FAC-07-VCD-02 IP3-05-24993 to back 45 elbows, 6" UPSM and approximately 12' West of F/19. Yes Yes No Yes 3" be descoped if recommended 1

DNSM El 45' VCD piping replacements implemented.

Piping segments DNSM of 31A MSR Calculation reinspection 03-PT-valve VCD-PCV-7008. Exam consists Turbine Building. Located 02. IP3-CALC-HD-03735. May be FAC-07-VCD-03 of 12" piping UPSM and DNSM of approximately 6' North and 2' 9321-F-20233 descoped if recommended VCD 71 IP3-05-24933 Westinghouse Flow Control section West of B4/14.3 El. 36'. 3' under Yes Yes No Yes Sheet 1 and 3" piping replacements 14C and all pipe and components DNSM of grating. Partially accessible from 29033 implemented. UPSM pipe the control section until the pipe enters work platform on 31 condenser. inspected in 3R13 FAC-05-VCD-the 31 condenser. 04P 14C Piping segments DNSM of 32A MSR valve VCD-PCV-7009. Exam consists Calculation reinspection 03-PT-FAC-07-VCD-04 Turbine Building. Located 9321-F-20233 03. IP3-CALC-HD-03735. May of 12" piping UPSM and DNSM of approximately 2' South and 2' Sheet 1 and be descoped if recommended 72 IP3-05-24934 Westinghouse Flow Control section Yes Yes No Yes 3" East of B4/15.7. From El. 36', 3' 29033IP3 VCD piping replacements 14C and all pipe and components DNSM of under grating 24934 of the control section until the pipe implemented. 14C enters the condenser.

Calculation reinspect IP3-CALC-MSR-03132 Rev. 1, 1B 3R12 Piping segments from MSR 32B. Two Turbine Building. Located 9321-F-29013- exam point 03-PT-06-03. System 73 FAC-07-VCD-05 IP3-03-24788 (2) 90 degree elbows per previous approximately 12' west and on Yes Yes No Yes 3" 1 Engineer recommendation, exam. the centerline of F/19, El. 46' experience with leaks and wear in this piping. Deferred from 3R13.

9 of 15 3R14 FAC Scope (Ipe0067429).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 T ER N R D O N P G KS IN R TI N LD O E IN BE O O IP IO O TI W ZE AR P K R LA PR SI UM R C AT FF T RA EM N AM O C A SU IN PE D PE R W ES EX D LO SC IN PA PI PI Turbine Building. Located Exam consists of elbow dnsm of VCD- Reinspection 03-PT-01, FAC 74 FAC-07-VCD-06 IP3-05-25023 approximately 10' East of A/15. No Yes No Yes 9321-20233 3" PCV-7009 VCD-14 EL 53' EXAM CONSISTS OF ELBOW Turbine Building. Located 75 FAC-07-VCD-07 IP3-05-25024 DOWNSTREAM OF VCD-2. MSR approximately 7' West and 4' No Yes No Yes 9321-20233 3" Reinspection FAC-05-VCD-16 33B North and F/17. El 53' Piping from 32A MSR to 36A FWH. Turbine Building. Located Reinspection 99-PT-24-10 FAC-07-VCD-08 76 IP3-05-25025 Exam consists of 90 elbow and 6" approximately 10' South and 2' Yes Yes No Yes 9321-29013 3" Canceled CANCELED (Replaced)

UPSM and DNSM. West of B4/15.7. El 45' Piping segments to include four (4) 90 degree elbows plus 12" UPSM and Turbine Building. Located 9321-F-20233 Calculation reinspection 03-PT-77 FAC-07-MSR-01 IP3-05-24937 DNSM piping adjacent to fittings of the approximately 4' North and 21' Yes Yes No Yes 2 1/2" Sheet 2 26, IP3-CALC-HD-03812.

MSR 33B Channel Head vent line to West of F/17., El. 58' the reheater drain tank 33B.

From Leak report, PCV-7005 Piping DNSM of MS-PCV-7005, MSR 78 FAC-07-MSR-02 IP3-05-25033 Turbine Building. 53' El. Yes Yes No Yes 9321-F-20233 1" leaks to condenser. Confirm leak off valve.

scaffoldng and insulation.

10 of 15 3R14 FAC Scope (Ipe0067429).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 T ER N R D O N P G KS IN R TI N LD O E IN BE O O IP IO O TI W ZE AR P K R LA PR SI UM R C AT FF T RA EM N AM O C A SU IN PE D PE R W ES EX D LO SC IN PA PI PI MAIN STEAM Per OE 15860 from Calvert Cliffs.

Piping wall erosion found around 79 MS-FE-449 IP3-05-24959 Main Steam Venturi from 34 SG. VC El 107' Yes Yes No Yes 9321-F-25423 28" the drain slots at the DNSM end of the Main Steam Flow Venturi.

Turbine Building. Located Calculation reinspection 01-PT-Piping segments downstream of MST-80 FAC-07-MST-01 IP3-05-25028 approximately 25' West of F/14, No Yes No Yes 9321-F-20423 3/4", 1" 24. IP3-CALC-03426. RSL 80, per previous inspection 01-PT-24 El. 36' 9/2008 Piping segments to include DNSM Turbine Building. Located 81 FAC-07-MST-02 IP3-05-24940 piping of MST-24 and bypass valve MS- approximately on the centerline No Yes No Yes 9321-F-20413 3/4", 1" Calculation reinspection IP-CALC-100-3 to 12" DNSM of valve MS-99-30 and 2' West of A/19, El. 15' 05-00099. Last inspected 3R13.

Piping segments to include DNSM Aux Boiler Building. Located Trap leaks by. IP3-05-00385.

82 FAC-07-MST-03 IP3-05-25029 piping of MST-4 and bypass valve MS- approximately 10' West of No Yes No Yes 9321-F-20413 3/4", 1" Steam trap report.

68-4 to 12" DNSM of valve MS-105-4 H8/207. El 43' Piping segments to include DNSM Turbine Building. Located Past leaks; never been inspected.

83 FAC-07-MST-04 IP3-05-24941 piping of MST-25 and bypass valve MS- approximately on the centerline No Yes No Yes 9321-F-20413 3/4", 1" Steam trap report.

100-4 to 12" DNSM of valve MS-99-34 and 2' South of A/19, El. 15' HIGH PRESSURE TURBINE DRAINS Piping segments to include two (2) 45 Calculation reinspection 03-PT-Piping segments located on the degree elbows and piping UPSM of MS- 09, IP3-CALC-MS-03085. May be mezz. Platform under HP 1.5" 84 FAC-07-TD-01 IP3-05-24942 FCV-1157 and one (1) elbow and No Yes No Yes 9321-F-20173 descoped if recommended High Turbine. Southwest corner 2" piping DNCM of MS-FCV-1157 until it Pressure Turbine drain piping approximate El. 31' enters the condenser. replacements implemented.

Calculation reinspection 03-PT-Piping segments to include piping and Piping segments located on the 12-01, IP3-CALC-MS-03085. May (3) elbows UPSM of MS-FCV-1155 mezz. Platform under HP 1.5" be descoped if recommended 85 FAC-07-TD-02 IP3-05-24943 No Yes No Yes 9321-F-20173 and 1 elbow and piping DNSM to h the Turbine. Southwest corner 2" High Pressure Turbine drain condenser. approximate El. 31' piping replacements implemented.

Calculation reinspection. IP-CALC-04-01795. FAC-05-TD-02.

Northeast corner HP turbine El. 9321-F-20173 86 FAC-07-TD-03 IP3-05-24944 Piping DNSM of MS-HCV-416-3. No Yes No Yes 1.5", 3" Also System Engineer 53'. 9321-F-20823 recommendation; experience with leaks in this piping.

11 of 15 3R14 FAC Scope (Ipe0067429).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 T ER N R D O N P G KS IN R TI N LD O E IN BE O O IP IO O TI W ZE AR P K R LA PR SI UM R C AT FF T RA EM N AM O C A SU IN PE D PE R W ES EX D LO SC IN PA PI PI FEEDWATER HEATERS Recommendation in SPU report "Evaluation of Feedwater Heater Performance Operation at current Turbine Building. Located on the LPFWH 31A Drains inlet nozzle and and Uprate Conditions Indian 87 HD-9.3A-02N IP3-05-25031 north side of LPFWH 31A next to Yes Yes No Yes 50031 12" adjacent shell area Point Station Unit No. 3; Low condenser wall.

Pressure Heater No. 31 ABC".

Common scaffold with HD-9.3A-02N and HD-9.4A-04N.

Recommendation in SPU report "Evaluation of Feedwater Heater Performance Operation at current Turbine Building. Located on the LPFWH 31A Drains inlet nozzle and and Uprate Conditions Indian 88 HD-9.4A-04N IP3-05-25032 north side of LPFWH 31A next to Yes Yes No Yes 50031 12" adjacent shell area Point Station Unit No. 3; Low condenser wall.

Pressure Heater No. 31 ABC".

Common scaffold with HD-9.3A-02N and HD-9.4A-04N.

Recommendation in SPU report "Evaluation of Feedwater Heater Performance Operation at current and Uprate Conditions Indian LPFWH 32C Steam Inlet nozzle and Turbine Building LPFWH 32C; Point Station Unit No. 3; Low 89 EX-05.1C-04N IP3-05-24948 Yes TS No Yes 50087 22" adjacent shell area. exam location inside condenser. Pressure Heater No. 32 A/B/C".

Note that nozzle and extraction steam inlet piping on 32B was performed during 3R13, but shell was not inspected.

LPFWH 32C Steam Inlet nozzle and Turbine Building LPFWH 32C; 90 EX-05.2C-06N IP3-05-24950 Yes TS No Yes 50087 22" Same as EX-05.1C-04N.

adjacent shell area. exam location inside condenser.

No previous inspections on LPFWH 33 shells. OE21384 LPFWH 33A Steam Inlet Nozzle and 91 EX-04.6-06N IP3-05-25045 Turbine Building LPFWH 33A Yes Yes No Yes 50007 20" from LaSalle experienced steam adjacent shell area.

leak in shell adjacent to impingement plate.

12 of 15 3R14 FAC Scope (Ipe0067429).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 T ER N R D O N P G KS IN R TI N LD O E IN BE O O IP IO O TI W ZE AR P K R LA PR SI UM R C AT FF T RA EM N AM O C A SU IN PE D PE R W ES EX D LO SC IN PA PI PI PRESEPARATOR DRAINS Turbine Building. Located Checworks pick. No inspection PRESEPRTR DRAINS Exam consists 92 PD-01.2-10O IP3-04-13364 approximately 15' South and 10' No Yes No Yes EC-H-50075 10" downstream of orifice or on this of orifice PD-01.2-10O.

West of C4/20, El. 16' line. Deferred from 3R13.

STEAM JET AIR EJECTORS SJAE31 Intermediate condenser drain System Engineer Turbine building. Underneath DNSM of valve CA-CV-19. Exam to recommendation. OE from other 93 SJAE31-DS-CV19 IP3-05-24945 SJAE 31 located 3' North and 7' No No Yes Yes 9321-F-20253 1" consist of piping downstream of valve plants. Leaks or failures in this East of A/12. El 36' to 12" dnsm of elbow. system caused shutdowns due to loss of condenser vacuum.

System Engineer SJAE31 Intermediate Condenser drain Turbine building. North of DCT recommendation. OE from other 94 SJAE31-DS-CV28 IP3-05-24946 DNSM of valve CA-CV-28 at Yes No Yes Yes 9321-F-20253 1" at condenser wall. plants. Leaks or failures in this condenser connection system caused shutdowns due to loss of condenser vacuum.

ADDED SCOPE Turbine Building. Located 95 RHD-02.15A-02E IP3-06-23430 RHD HDR TO 36C HTR. Above HDT. approximately 20' South and 20' Yes Yes No Yes 50015 6" EOC for leak CR-IP3-2006-02270 West of A/19. El 32' Turbine Building. Located 96 RHD-02.13A-01P IP3-06-23432 RHD HDR TO 36B HTR. approximately 4' North and 2' Yes Yes No Yes 50015 6" EOC for leak CR-IP3-2006-02270 West of BB/19. El 33' Turbine Building. Located 97 RHD-02.13A-02E IP3-06-23440 RHD HDR TO 36B HTR. approximately 4' North and 2' Yes Yes No Yes 50015 6" EOC for leak CR-IP3-2006-02270 West of BB/19. El 33' Turbine Building. Located 98 RHD-02.8B-06T IP3-06-23441 RHD HDR TO 36C HTR approximately 4' North and 2' Yes Yes No Yes 50010 10" X 6" EOC for leak CR-IP3-2006-02270 West of BB/19. El 33' Turbine Building. Located 99 RHD-02.14B-01P IP3-06-23446 RHD HDR TO 36C HTR approximately 4' North and 2' Yes Yes No Yes 50010 6" EOC for leak CR-IP3-2006-02270 West of BB/19. El 33' Turbine Building. Located 100 RHD-02.14B-02E IP3-06-23447 RHD HDR TO 36C HTR approximately 4' North and 2' Yes Yes No Yes 50010 6" EOC for leak CR-IP3-2006-02270 West of BB/19. El 33' Turbine Building. Located 101 RHD-02.9B-02T IP3-06-23449 RHD HDR TO 36B HTR. approximately 4' North and 2' Yes Yes No Yes 50010 10" x 6" EOC for leak CR-IP3-2006-02270 West of BB/19. El 33' Turbine Building. Located 102 RHD-02.12B-01P IP3-06-23450 RHD HDR TO 36B HTR. approximately 4' North and 2' Yes Yes No Yes 50010 6" EOC for leak CR-IP3-2006-02270 West of BB/19. El 33' Turbine Building. Located 103 RHD-02.12B-02E IP3-06-23451 RHD HDR TO 36B HTR. approximately 4' North and 2' Yes Yes No Yes 50010 6" EOC for leak CR-IP3-2006-02270 West of BB/19. El 33' EOC For leak in 25C FWH UT 104 EX-01.5A-15N IP3-06-23346 36A FWH EX STEAM INLET NOZZLE TB 36' Yes Yes No Yes 50000 exam 13 of 15 3R14 FAC Scope (Ipe0067429).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 T ER N R D O N P G KS IN R TI N LD O E IN BE O O IP IO O TI W ZE AR P K R LA PR SI UM R C AT FF T RA EM N AM O C A SU IN PE D PE R W ES EX D LO SC IN PA PI PI EOC For leak in 25C FWH PEC 105 EX-01.5A-15N IP3-06-24524 36A FWH EX STEAM INLET NOZZLE TB 36' Yes Yes No Yes 50000 Exam EOC For leak in 25C FWH UT 106 EX-01.5B-13N IP3-06-23356 36B FWH EX STEAM INLET NOZZLE TB 36' Yes Yes No Yes 50000 Exam EOC For leak in 25C FWH PEC 107 EX-01.5B-13N IP3-06-24526 36B FWH EX STEAM INLET NOZZLE TB 36' Yes Yes No Yes 50000 Exam EOC For leak in 25C FWH UT 108 EX-01.5C-13N IP3-06-23366 36C FWH EX STEAM INLET NOZZLE TB 36' Yes Yes No Yes 50000 Exam EOC For leak in 25C FWH PEC 109 EX-01.5C-13N IP3-06-24529 36C FWH EX STEAM INLET NOZZLE TB 36' Yes Yes No Yes 50000 Exam Pipe replacement scope 110 FAC-07-VCD-09 IP3-06-23456 VCD Discharge from MSR 31A TB EL 52' Yes Yes No Yes 9321-29013 reduction VCD Discharge from MSR 31A; 4 TB EL 36' West of 33' mezz Pipe replacement scope 111 FAC-07-VCD-10 IP3-06-23458 No Yes No Yes 9321-29023 elbows stairs reduction VCD Discharge from MSR 32A; 2 TB EL 36' West of 33' mezz Pipe replacement scope 112 FAC-07-VCD-11 No Yes No Yes 9321-29023 IP3-06-23462 elbows stairs reduction VCD Discharge from MSR 33A; 1 TB EL 36' West of 33' mezz Pipe replacement scope 113 FAC-07-VCD-12 IP3-06-23464 No Yes No Yes 9321-29023 elbow stairs reduction Inspection of Gland Seal Steam piping 9321-05-2355 Siemens Westinghouse OE 114 FAC-07-GSS-01 IP3-06-23466 Condenser No No No Yes inside condenser 723J753 Service Bulletin 53009 ST Totals 74 103 8 114 40 8 106 Total Thermal insulation 3 Total FAC Exam's 114 114 114 114 SUPPORT WORK ORDERS Remove/Replace thermal shields on IP3-06-22059 1 EX-05.1C-04N EX-05.1C-04N and shell to support Inside 31 Condenser IP3-06-22061 FAC Exams. 32C FWH Remove/Replace thermal shields on IP3-06-22085 2 EX-05.2C-06N EX-05.2C-06N and shell to support Inside 31 Condenser IP3-06-22086 FAC Exams 32C FWH IP3-05-24952 Remove/Replace thermal shields on 3 EX-04.2-09T Inside 33 Condenser IP3-05-24955 EX-04.2-09T to support FAC Exams 4 EX-04.2-09T IP3-05-25034 Open 33 Condenser 33 Condenser 5 EX-05-1C-04N IP3-06-22118 OPEN 31 CONDENSER 31 CONDENSER EX-05.2C-06N 14 of 15 3R14 FAC Scope (Ipe0067429).Xls

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 T ER N R D O N P G KS IN R TI N LD O E IN BE O O IP IO O TI W ZE AR P K R LA PR SI UM R C AT FF T RA EM N AM O C A SU IN PE D PE R W ES EX D LO SC IN PA PI PI WORK ORDERS TO BE CANCELLED Contingency WO 1 IP3-027763793 from RO12 Contingency WO 2 IP3-03-11345 from 3R13 3 Inaccessible location. IP3-03-18570 Alternate location 4 IP3-04-13348 selected in 3R13.

Alternate location 5 IP3-04-13349 selected in 3R13.

Contingency WO 6 IP3-03-11337 from 3R13.

LEGEND Number of Scaffolds needed 74 PRE-OUTAGE INSPECTIONS Cost of scaffolds $280,000 Insulation likely A to contain asbestos Insulation is a welded stainless TS steel Thermal Shield Number of insulation(remove/install) 103 Cost of insulation $164,000 15 of 15 3R14 FAC Scope (Ipe0067429).Xls

3R14 FLOW ACCELERATED CORROSION INSPECTION

SUMMARY

REASONS FOR SELECTION OF 114 INSPECTION LOCATIONS 6, 5%

12, 10% 25, 22%

2, 2%

7, 6%

34, 30%

28, 25%

CHECWORKS INDUSTRY OE IPEC OE CALCULATION REINSPECTION SNAPSHOT SCOPE ASSESSMENT POWER UPRATE DEFERRALS

MBE W O A

PO M O RK R IN RD N EX T ER U

EXTRACTION 1 EX-04.2-09T IP3-05-24954 2 EX-02.14-07P IP3-05-24843 3 EX-04.13-07T IP3-05-24846 4 EX-04.4-08E EX 04 4 08E IP3-05-24847 IP3 0 2484 5 EX-04.11-08E IP3-05-24848 6 EX-04.21-02P IP3-05-24849 7 EX-03.1A-14E IP3-05-24850 8 FAC-07-EX-01 IP3-05-24984 9 FAC-07-EX-02 IP3-05-24851 10 FAC-07-EST-01 IP3-05-24853 FEEDWATER 11 FW-02.1A-01N IP3-05-24854 12 FW-02.1A-02E IP3-05-24856 13 FW-02.1A-03P IP3-05-24857 14 FW-02.1A-04E IP3-05-24858 15 FW-01.3-13P IP3-05-24859 16 FW-01.3-14E IP3-05-24860 17 FW-02.4-11E IP3-05-24861 18 FW-02.8A-26R IP3-04-13353 19 FW-02.8B-25R IP3-05-24864 20 FW-02.8D-24R IP3-05-24866 21 FW-02.5-03T IP3-05-24985 22 FW-03.1D-08B IP3-05-24867 23 FW-03.1C-13P IP3-04-13354 24 FW-02.8B-13F IP3-05-24868 25 FW 01 6C 10N FW-01.6C-10N IP3 05 24869 IP3-05-24869 26 FW-01.6A-12N IP3-05-24870 CONDENSATE 27 CD-06.3B-02N IP3-05-24872 28 CD-05.1B-04P IP3-04-13366 29 CD-03.1C-01N IP3-05-24873 30 CD-04.1C-01N IP3-05-24874 31 CD-04.1C-5E CD 04.1C 5E IP3-05-24875 IP3 05 24875 32 CD-04.1C-7E IP3-05-24876 33 CD-2.1C-12T IP3-05-24877 34 CD-2.8C-03P IP3-05-24882 35 CD-2.8B-01P IP3-05-24883 36 CD-2.8B-03P IP3-05-24886 37 CD-04.1A-04P IP3-05-24887 38 FAC-07-CP-01 IP3-05-24986 39 FAC-07-CP-02 FAC 07 CP 02 IP3-05-24987 IP3 05 24987 HEATER DRAINS 40 HD-3.1B-09E IP3-05-24889 41 HD-2.1B-02R IP3-05-24890 42 HD-12.2A-08T IP3-05-24891 43 HD-05.1C-02R IP3-05-24892 44 FAC-07-HD-01 IP3-05-24896

45 FAC-07-HD-02 IP3-05-24897 46 FAC-07-HD-03 IP3-05-24988 47 FAC-07-HD-04 IP3-05-24898 48 FAC-07-HD-05 IP3-05-24899 REHEATER DRAINS 49 RHD-01.3A-02P IP3-05-24900 50 RHD-02.4A-06L IP3-05-24902 51 RHD 02 10A 11T RHD-02.10A-11T IP3 05 24904 IP3-05-24904 52 RHD-02.12B-11T IP3-05-24905 53 RHD-02.14B-12T IP3-05-24906 54 RHD-02.6A-06L IP3-05-24907 55 RHD-02.9A-11T IP3-05-24908 56 RHD-02.5A-02R IP3-05-24910 57 RHD-02.6A-02E IP3-05-24911 58 RHD-02.6A-03P RHD 02.6A 03P IP3-04-13370 IP3 04 13370 59 RHD-02.2A-02E IP3-05-24912 60 RHD-02.3A-02R IP3-05-24913 61 RHD-02.13B-01N IP3-05-24914 62 RHD-02.14A-01N IP3-05-24915 63 RHD-02.15B-01N IP3-05-24916 64 RHD-02.16A-01N IP3-05-24917 65 FAC-07-RHD-01 IP3-05-24989 66 FAC-07-RHD-02 FAC 07 RHD 02 IP3-05-24990 IP3 05 24990 MSR DRAINS 67 MSD-01.3B-03E IP3-05-24930 68 MSD-01.1B-06T IP3-05-24931 69 FAC-07-VCD-01 IP3-05-24991 70 FAC-07-VCD-02 IP3-05-24993 71 FAC-07-VCD-03 IP3-05-24933 72 FAC-07-VCD-04 IP3-05-24934 73 FAC-07-VCD-05 IP3-03-24788 74 FAC-07-VCD-06 IP3-05-25023 75 FAC-07-VCD-07 IP3-05-25024 76 FAC-07-VCD-08 IP3-05-25025 77 FAC-07-MSR-01 IP3-05-24937 78 FAC-07-MSR-02 IP3-05-25033 MAIN STEAM 79 MS-FE-449 IP3-05-24959 80 FAC-07-MST-01 IP3-05-25028 81 FAC-07-MST-02 IP3-05-24940 82 FAC-07-MST-03 IP3-05-25029 83 FAC-07-MST-04 IP3-05-24941 HIGH PRESSURE TURBINE DRAINS 84 FAC-07-TD-01 IP3-05-24942 85 FAC-07-TD-02 IP3-05-24943 86 FAC-07-TD-03 IP3-05-24944 FEEDWATER HEATERS 87 HD-9.3A-02N IP3-05-25031 88 HD-9.4A-04N IP3-05-25032 89 EX-05.1C-04N IP3-05-24948 90 EX-05.2C-06N IP3-05-24950

91 EX-04.6-06N IP3-05-25045 PRESEPARATOR DRAINS 92 PD-01.2-10O IP3-04-13364 STEAM JET AIR EJECTORS 93 SJAE31-DS-CV19 IP3-05-24945 94 SJAE31-DS-CV28 IP3-05-24946 SUPPORT WORK ORDERS 1 EX-05.1C-04N IP3-05-24952 2 EX-05.2C-06N IP3-05-24952 3 EX-04.2-09T IP3-05-24955 4 LPFW32C IP3-05-25034 3R14 WORK ORDERS TO BE CANCELLED 1 Contingency WO from RO12 IP3-027763793 2 Contingency WO from 3R13 IP3-03-11345 IP3 03 11345 3 Inaccessible location. IP3-03-18570 Alternate location selected in 4 IP3-04-13348 3R13.

Alternate location selected in 5 IP3-04-13349 3R13.

6 Contingency WO from 3R13. IP3-03-11337

3R14 FAC Scope Work Breakdown Number of FAC Number of 1

Total number of inspectons Portals scaffolds Number of insulation removals 97 Insulation removals; 3 of which 111 inspections; 8 of which are Stainless Steel thermal shields are pre-outage 61 49 located in condenser

1. Portals are first time FAC inspections that are to be re-insulated with blanket insulation for ease of removal for future inspection. Becomes capital expense.