ML12338A445
| ML12338A445 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 03/28/2012 |
| From: | Entergy Nuclear Operations |
| To: | Atomic Safety and Licensing Board Panel |
| SECY RAS | |
| References | |
| RAS 22102, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01 | |
| Download: ML12338A445 (20) | |
Text
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 NUMBER EXAM POINT WORK ORDER DESCRIPTION LOCATION SCAFFOLD INSULATION PAINT PIPE PREP DRAWING PIPE SIZE REMARKS EXTRACTION 1
EX-04.2-09T IP3-05-24954 33 LP TURBINE TO 33A FEEDWATER HEATER Inside 33 condenser.
Yes TS No Yes 50007 28" X 20" Checworks pick. Low Checworks hours. Inspection inside condenser.
2 EX-02.14-07P IP3-05-24843 Preseparators to Header 35. Exam consists of Extraction Steam pipe EX-02.14-07P.
Turbine Building. Located approximately 17' North and 5' East of B4/18.8, El.26'.
Yes Yes No Yes 50001 28" Checworks pick. Low Checworks hours. Carbon steel component downstream of non-susceptible material. Entrance effect.
3 EX-04.13-07T IP3-05-24846 Extraction piping from 33 LP turbine to 33B feedwater heater.
Turbine Building. Located approximately 10' North and 4' West of BB1/15. El 24' Yes Yes No Yes 50008 20" From Power Uprate Checworks analysis. One of top 5 components showing greatest increase in predicted wear rate due to uprate. Calculation 040711.
4 EX-04.4-08E IP3-05-24847 Extraction piping from 33 LP turbine to 33A feedwater heater.
Turbine Building. Located approximately 8' south of A/18.
El 39' No Yes No Yes 50007 28" OE from Unit 2. High wear found on similar elbow.
5 EX-04.11-08E IP3-05-24848 Extraction piping from 33 LP turbine to 33B feedwater heater.
Turbine Building. Located approximately 2' East and 1' North of A/16. El 39' No Yes No Yes 50008 28" OE from Unit 2. High wear found on similar elbow.
6 EX-04.21-02P IP3-05-24849 Extraction piping from 31 LP turbine to 33C feedwater heater.
Turbine Building. Located approximately 10' North and 5' East of BB1/15. El 24' Yes Yes No Yes 50004 20" Calculation reinspection. IP3-CALC-EX-03082. RSL 12/2010.
Inspect EX-04.21-02P 7
EX-03.1A-14E IP3-05-24850 Extraction piping from 33 LP turbine to 34A feedwater heater.
Turbine Building. Located approximately 2' East of A/18. El 39' No Yes No Yes 50005 20" Checworks pick. Inspect elbow and upstream and downstream piping, EX-03.1A-13P and EX-03.1A-15P.
8 FAC-07-EX-01 IP3-05-24984 Two back to back 90 degree elbows and 6" UPSM and DNSM.immediately upsm of crossunder steam line drip pot drain check valve western most valve above heater drain tank Turbine Building. Located approximately 5' North of Heater Drain Tank. EL 30' Yes Yes No Yes 9321-F-20203 2"
Other areas of this piping experienced leaks in previous cycle.
9 FAC-07-EX-02 IP3-05-24851 Inspect pipe downstream of the NW crossunder drip pot to valve MS-125-1.
97-PT-31 Piping segments located on the mezz. Platform under HP Turbine. Norhtwest corner approximate El. 31' No Yes No Yes 9321-F-20203 10",2" Calculation reinspection, 97-PT-31; WO 96-03869-31 Calculation IP3-CALC-MS-02494.
RSL May 2010 10 FAC-07-EST-01 IP3-05-24853 Piping segments to include DNSM piping of EST-2 and bypass valve 6EX-35 to 12" DNSM of valve 6EX-34-3 Turbine Building. Located approximately 1' North and on the centerline of A/20. El 15' No Yes No Yes 9321-F-20313 3/4" Steam trap leaking; IP3 00664. Found trap with steam cuts. Steam trap report.
EXTRACTION 1 of 15 3R14 FAC Scope (Ipe0067429).Xls ENT000061 Submitted: March 28, 2012 United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:
Entergy Nuclear Operations, Inc.
(Indian Point Nuclear Generating Units 2 and 3)
ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #:
Identified:
Admitted:
Withdrawn:
Rejected:
Stricken:
Other:
ENT000061-00-BD01 10/15/2012 10/15/2012
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 NUMBER EXAM POINT WORK ORDER DESCRIPTION LOCATION SCAFFOLD INSULATION PAINT PIPE PREP DRAWING PIPE SIZE REMARKS 11 FW-02.1A-01N IP3-05-24854 36A FEEDWATER HTR TO SG HDR Turbine Building. Located approximately 12' South of CC3/20. El 44' Yes Yes No Yes 50039 18" Checworks pick. Low Checworks hours. Common scaffold for FW-02.1A-01N, -02E, -03P and -04E 12 FW-02.1A-02E IP3-05-24856 36A FEEDWATER HTR TO SG HDR Turbine Building. Located approximately 12' South of CC3/20. El 44' Yes Yes No Yes 50039 18" Checworks pick. Low Checworks hours. Common scaffold for FW-02.1A-01N, -02E, -03P and -04E 13 FW-02.1A-03P IP3-05-24857 36A FEEDWATER HTR TO SG HDR Turbine Building. Located approximately 12' South of CC3/20. El 44' Yes Yes No Yes 50039 18" Checworks pick. Low Checworks hours. Common scaffold for FW-02.1A-01N, -02E, -03P and -04E 14 FW-02.1A-04E IP3-05-24858 36A FEEDWATER HTR TO SG HDR Turbine Building. Located approximately 12' South of CC3/20. El 44' Yes Yes No Yes 50039 18" Checworks pick. Low Checworks hours. Common scaffold for FW-02.1A-01N, -02E, -03P and -04E 15 FW-01.3-13P IP3-05-24859 Main boiler discharge header to 36 feedwater heaters.
Turbine Building. Located approximately 1' West and 1' South of A/20. El 31' Yes Yes No Yes 50039 30" Checworks pick. Low Checworks hours. Common scafflod for FW-01.3-13P and -14E.
16 FW-01.3-14E IP3-05-24860 Main boiler discharge header to 36 feedwater heaters.
Turbine Building. Located approximately 1' West and 1' South of A/20. El 31' Yes Yes No Yes 50039 30" Checworks pick. Low Checworks hours. Common scafflod for FW-01.3-13P and -14E.
17 FW-02.4-11E IP3-05-24861 Feedwater header to Steam Generators.
Turbine Building. Located approximately 3' South and 2' East of B8/22. El 30' Yes Yes No Yes 50040 30" Checworks pick. Low Checworks hours.
18 FW-02.8A-26R IP3-04-13353 Feedwater to SG 31. Exam consists of Feedwater reducer FW-02.8A-26R DNSM of FCV-417.
Aux. Boiler Building. Located approximately 4' North and 14' West of H9/22.1, El. 22 No Yes No Yes 50040 12" X 18" reducer Calculation reinspection IP3-CALC-FW-03815, Rev. 0. 3R12 inspection. Deferred from 3R13.
19 FW-02.8B-25R IP3-05-24864 Feedwater to SG 32. Exam consists of reducer FW-2.8B-25R, UPSM of FCV-427.
Aux Boiler Building El. 22'.
Located approximately 9' North and 16' West of H9/22.1 No Yes No Yes 50040 12" X 18" reducer Calculation reinspection. Confirm wear rate.
20 FW-02.8D-24R IP3-05-24866 Feedwater to SG 33. Exam consists of reducer FW-02.8D-24R, UPSM of FCV-437.
Aux Boiler Building. Located approximately 2' South and 10' West of H9/23, El 22'.
No Yes No Yes 50040 12" X 18" reducer Calculation reinspection. Also dnsm reducer FW-02.8D-25R.
Confirm wear rate.
FEEDWATER 2 of 15 3R14 FAC Scope (Ipe0067429).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 NUMBER EXAM POINT WORK ORDER DESCRIPTION LOCATION SCAFFOLD INSULATION PAINT PIPE PREP DRAWING PIPE SIZE REMARKS 21 FW-02.5-03T IP3-05-24985 SG header to 32 Feedwater bypass line, UPSM of FCV 427L.
Aux Boiler Building. Located approximately 2' West and 8' North of H2/22.1, El 43'.
Yes Yes No Yes 50040 30"X6" tee Checworks pick. Low Checworks hours. Indclude downstream pipe FW-02.5-02P.
22 FW-03.1D-08B IP3-05-24867 Feedwater to 33 SG VC. El 104' Yes Yes No Yes 50045 18" Checworks pick. Low Checworks hours. Indclude downstream pipe FW-03.1D-09P.
23 FW-03.1C-13P IP3-04-13354 SG Header to SG 34. Exam consists of feedwater pipe FW-03.1C-13P near SG inlet.
VC El. 104' Yes Yes No Yes EC-H-50046 9321-F-25503 9321-F-25523 18" pipe Calculation reinspection IP3-CALC-FW-03807, Rev. 0 3R12 inspection. Deferred from 3R13.
24 FW-02.8B-13F IP3-05-24868 Feedwater to 32 SG. Exam includes piping UPSM and DNSM of flow element per previous exams.
Aux FW Building 36'. Component to be examined includes approximately 5' upstream and 6' downstream of connection containing valve BFD-64-4.
Yes Yes No Yes 50041 18" pipe Calculation reinspection IP3-CALC-FW-02471 0, 0A. Confirm wear rate that was determined from R09 and R10 inspections.
25 FW-01.6C-10N IP3-05-24869 Feedwater to 36C feedwater heater, inlet nozzle.
Turbine Building. Located approximately 12' South and 10' West of A/20. El 36' Yes Yes No Yes 50042 18" pipe Higher inlet velocities due to SPU per SPU project manager 26 FW-01.6A-12N IP3-05-24870 Feedwater to 36A feedwater heater, inlet nozzle.
Turbine Building. Located approximately 12' South and 4' East of CC3/20. El 36' Yes Yes No Yes 50039 18" pipe Higher inlet velocities due to SPU per SPU project manager 3 of 15 3R14 FAC Scope (Ipe0067429).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 NUMBER EXAM POINT WORK ORDER DESCRIPTION LOCATION SCAFFOLD INSULATION PAINT PIPE PREP DRAWING PIPE SIZE REMARKS 27 CD-06.3B-02N IP3-05-24872 32 Main boiler pump inlet nozzle.
Turbine Building. Located approximately 5' West and 5' South of A/17.
Yes Yes No Yes 50064 Checworks pick. Low Checworks hours. Recommended by snapshot assessment.
28 CD-05.1B-04P IP3-04-13366 Condensate from Feedwater heater 35B to header.
Turbine building at FWH 35B.
Located approximately 7' South and 15' East of CC3/18, El. 40' and from 15' for access to pipe under 36' floor.
Yes Yes No Yes 50064 14" pipe Calculation reinspection IP3-CALC-CD-03423, Rev. 0 R11 inspection. Inspect above and below floor penetration. Deferred from 3R13.
29 CD-03.1C-01N IP3-05-24873 Condensate from Feedwater heater 33C to heater 34C.
Turbine Building. Located approximately 10' South and 10' West of A/14. El 44' Yes Yes No Yes 50062 14" Selection from Checworks Pass 2 analysis. Include downstream elbow CD-03.1C-02E 30 CD-04.1C-01N IP3-05-24874 Condensate from Feedwater heater 34C to heater 35C.
Turbine Building. Located approximately 6' South and 15' West of A/16. El 43' Yes Yes No Yes 50062 14" Selection from Checworks Pass 2 analysis.
31 CD-04.1C-5E IP3-05-24875 Condensate from HTR 34C to HTR 35C Turbine Building. Located approximately 3' South and 8' East of BB/16. El 32' Yes Yes No Yes 50062 14" Selection from Checworks Pass 2 analysis. Recommended by snapshot assessment. Include downstream pipe CD-04.1C-06P.
Common scaffold for CD-04.1C-5E and -7E.
32 CD-04.1C-7E IP3-05-24876 Condensate from HTR 34C to HTR 35C Turbine Building. Located approximately 3' South and 8' East of BB/16. El 32' Yes Yes No Yes 50062 14" Selection from Checworks Pass 2 analysis. Recommendation by snapshot assessment. Common scaffold for CD-04.1C-5E and -
7E.
33 CD-2.1C-12T IP3-05-24877 Condensate from Feedwater heater 32C to header Turbine Building. Located approximately 15' North and 5' East of D6/14.3. El 48' Yes Yes No Yes 50061 24"X14" tee Calculation reinspection IP3-CALC-COND-02446 RSL 12/2009 34 CD-2.8C-03P IP3-05-24882 Condensate from header to Feedwater heater 33C. On top of SWAP lab Turbine Building. Located approximately 8' East and 8' South of BB/14. El 34' Yes Yes No Yes 50061 14" Calculation reinspection IP3-CALC-COND-02446 RSL 10/2009. Exam to include CD-2.8C-02E and CD-2.8C-02P.
35 CD-2.8B-01P IP3-05-24883 Condensate from header to Feedwater heater 33B. On top of SWAP lab Turbine Building. Located approximately 3' West and 8' South of BB/14. El 34' Yes Yes No Yes 50061 14" Calculation reinspection IP3-CALC-CD-03423 RSL 9/2009.
Exam to include CD-2.8B-02E.
Common scaffold for CD-2.8B-01P and -03P.
36 CD-2.8B-03P IP3-05-24886 Condensate from header to Feedwater heater 33B. On top of SWAP lab Turbine Building. Located approximately 3' West and 8' South of BB/14. El 34' Yes Yes No Yes 50061 14" Calculation reinspection IP3-CALC-CD-03423 RSL 7/2010.
Common scaffold for CD-2.8B-01P and -03P.
CONDENSATE 4 of 15 3R14 FAC Scope (Ipe0067429).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 NUMBER EXAM POINT WORK ORDER DESCRIPTION LOCATION SCAFFOLD INSULATION PAINT PIPE PREP DRAWING PIPE SIZE REMARKS 37 CD-04.1A-04P IP3-05-24887 Condensate from Feedwater heater 34A to heater 35A.
Turbine Building. Located approximately 4' South of CC3/16.
El 42' No Yes No Yes 50062 14" Calculation reinspection IP3-CALC-CD-03423 RSL 7/2010 38 FAC-07-CP-01 IP3-05-24986 Reducer immediately downstream Condensate Polisher Service Vessel B Resin Trap and UPSM of Effluent Valve EB.
Condensate Polisher Facility.
Component located approximately 10' East and on centerline of column B/6 Yes No Yes Yes IP3V-0561-0170 14" X 12" OE17378, wear found on discharge piping in CP at South Texas Project, Unit 1. Common scaffold for FAC-07-CP-01 and -
02.
39 FAC-07-CP-02 IP3-05-24987 Elbow downstream of Condensate Polisher Service Vessel B Effluent Valve EB and UPSM of Condensate polisher Service Vessel B Outlet Isolation Valve CD-418.
Condensate Polisher Facility.
Component located approximately 3' North and 10' East of column B/6.
Yes No Yes Yes IP3V-0561-0170 12" OE17378, wear found on discharge piping in CP at South Texas Project, Unit 1. Common scaffold for FAC-07-CP-01 and -
02.
5 of 15 3R14 FAC Scope (Ipe0067429).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 NUMBER EXAM POINT WORK ORDER DESCRIPTION LOCATION SCAFFOLD INSULATION PAINT PIPE PREP DRAWING PIPE SIZE REMARKS 40 HD-3.1B-09E IP3-05-24889 Feedwater heater 35B drain to Heater drain tank.
Turbine Building. Located approximately 10' East of CC3/18. El 17' No Yes Yes Yes 50018 10" Checworks pick. This line has no inspections. Inspection will allow entire run to be calibrated, thus greatly reducing future inspections.
41 HD-2.1B-02R IP3-05-24890 Feedwater heater 35B drain to Heater drain tank.
Turbine Building. Located approximately 10' South and 1' West of BB/19. El 22' Yes Yes No Yes 50018 10"X6" Checworks pick. No inspection downstream of LCV.
42 HD-12.2A-08T IP3-05-24891 31 Heater drain pump discharge to header.
Turbine Building. Located approximately 15' South of CC3/20. El 32' Yes Yes No Yes 50079 16"X12" tee Checworks pick. Low Checworlks hours on this tee. No recent inspections. Last was Tdat.
43 HD-05.1C-02R IP3-05-24892 HTR 34C to HTR 33C. Exam consists of reducer HD-05.1C-02R.
Turbine Building. Located approximately 5' North and 19' West of A/12, El. 36'.
No Yes No Yes 50020 6" X 3" rducr Calculation reinspection. IP-CALC-04-01787 RSL 11/2010 44 FAC-07-HD-01 IP3-05-24896 Feedwater heater 32A operating vent, downstream of valve 2HD-3-1. Exam to consist of 2 elbows and 12" dnsm pipe.
Turbine Building at FWH 32A.
Located approx 15' North and 2' East of D6/17.3. El 38' No Yes No Yes 9321-20223 Sh 2 2 1/2" Recommendation from Shaw Power Uprate Engineering Report Balance-of-Plant IP3 section 12.4.2 Flow Accelerated Corrosion Program Uprate Evaluation.
45 FAC-07-HD-02 IP3-05-24897 FWH 34B subcooler zone vent.
Upstream of 4HD-4-2 per previous exam.
Turbine Building approximately 10' South and 10' East of CC3/16.
El 36' No Yes No Yes 9321-20223 1"
Calculation reinspection IP3-CALC-HD-02493. High wear rate indication from previous inspections (97-PT-5, 01-PT-35).
46 FAC-07-HD-03 IP3-05-24988 32A feedwater heater dump to 33 condenser. 90 Elbow and 12" DNSM piping, DNSM of valve LCV-1138 Turbine Building. Located approximately 5' East of D6/17.3.
El 15' No Yes No Yes 9321-20223 6"
From Leak report, LCV-1138 leaking to condenser 47 FAC-07-HD-04 IP3-05-24898 canceled IP3-06-24732 REPLACE FWH 34A Operating vent, downstream of valve 4HD-3-1. Last elbow before pipe sleeve in floor Turbine Building. Located approximately 4' North and 1' East of CC3/14. El 36' No No Yes Yes 9321-20223 1 1/2" OE from Unit 3; leak in similar location on FWH 34B. CR-IP3-2004-00650. Small bore report.
48 FAC-07-HD-05 IP3-05-24899 FWH 34C Operating vent, downstream of valve 4HD-3-3. Last elbow before pipe sleeve in floor Turbine Building. Located approximately 4' North and 25' East of CC3/14. El 36' No No Yes Yes 9321-20223 1 1/2" OE from Unit 3; leak in similar location on FWH 34B. CR-IP3-2004-00650. Small bore report.
HEATER DRAINS 6 of 15 3R14 FAC Scope (Ipe0067429).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 NUMBER EXAM POINT WORK ORDER DESCRIPTION LOCATION SCAFFOLD INSULATION PAINT PIPE PREP DRAWING PIPE SIZE REMARKS 49 RHD-01.3A-02P IP3-05-24900 Reheater 32A to Reheater Drain tank.
Piping segments located approximately 17' North and 16' East of A/15, El. 60'.
Yes Yes No Yes 50012 6"
Selection from Checworks Pass 2 analysis. No inspection on this line.
50 RHD-02.4A-06L IP3-05-24902 RHD 32A TO HDR.
Turbine Building. Located approximately 2' East and 5' North of A/18. El 33' Yes Yes No Yes 50015 10"X6" Checworks pick. Low Checworks hours on this L. Unususl configuration.
51 RHD-02.10A-11T IP3-05-24904 RHD HDR TO 36B HTR.
Turbine Building. Located approximately 4' North and 2' West of BB/19. El 33' Yes Yes No Yes 50015 8"X6" tee Checworks pick. Low Checworks hours. Few inspections on this line.
52 RHD-02.12B-11T IP3-05-24905 RHD HDR TO 36B HTR.
Turbine Building. Located approximately 30' West and 10' North of A/18. El 43' No Yes No Yes 50010 6" tee Checworks pick. Low Checworks hours. Few inspections on this line.
53 RHD-02.14B-12T IP3-05-24906 RHD HDR TO 36C HTR.
Turbine Building. Located approximately 20' West and 10' North of A/18. El 43' No Yes No Yes 50010 6" tee Checworks pick. Low Checworks hours. Few inspections on this line.
54 RHD-02.6A-06L IP3-05-24907 RHD 33A TO HDR.
Turbine Building. Located approximately 2' East and 5' North of A/18. El 33' Yes Yes No Yes 50015 10"X6" Selection from Checworks Pass 2 analysis. Low Checworks hours, unusual geometry.
55 RHD-02.9A-11T IP3-05-24908 RHD HDR TO 36C HTR. Above HDT.
Turbine Building. Located approximately 20' South and 20' West of A/19. El 32' Yes Yes No Yes 50015 10"X6" tee Checworks pick. Low Checworks hours. Few inspections on this line.
56 RHD-02.5A-02R IP3-05-24910 RHD 33A TO HDR. Downstream of valve LCV-1104B Turbine Building. Located approximately 3' East and 8' North of A/18. El 36' No Yes No Yes 50015 6"X4" reducer Calculation reinspection.IP3-CALC-RHD-03450. RSL 1/2009 57 RHD-02.6A-02E IP3-05-24911 RHD 33A TO HDR. Downstream of valve LCV-1104B Turbine Building. Located approximately 3' East and 8' North of A/18. El 36' No Yes No Yes 50015 6"
Calculation reinspection.IP3-CALC-RHD-03450. RSL 10/2009 REHEATER DRAINS 7 of 15 3R14 FAC Scope (Ipe0067429).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 NUMBER EXAM POINT WORK ORDER DESCRIPTION LOCATION SCAFFOLD INSULATION PAINT PIPE PREP DRAWING PIPE SIZE REMARKS 58 RHD-02.6A-03P IP3-04-13370 RH 33 to Header. Exam consists of RHD-02.6A-03P. Downstream of valve LCV-1104B Turbine Building. Located approximately 3' East and 8' North of A/18. El 36' No Yes No Yes 50015 6"
Calculation reinspection for both components. IP3-CALC-RHD-03450. R11 inspection. Deferred from 3R13. RSL 12/2008 59 RHD-02.2A-02E IP3-05-24912 RHD 31A TO HDR. Downstream of valve LCV-1104C Turbine Building. Located approximately 2' East and 3' North of A/18. El 36' No Yes No Yes 50015 6"
Calculation reinspection. IP3-CALC-RHD-03450. RSL 6/2010 60 RHD-02.3A-02R IP3-05-24913 RHD 32A TO HDR. Downstream of valve LCV-1104A Turbine Building. Located approximately 3' East and 10' North of A/18. El 36' No Yes No Yes 50015 6"X4" reducer Calculation reinspection. IP3-CALC-HD-00687. RSL 2/2011 61 RHD-02.13B-01N IP3-05-24914 RHD inlet nozzles to 36B heater.
Turbine Building. Located approximately 30' West and 10' North of A/18. El 43' Yes Yes No Yes 50010 8"
Higher inlet velocities from SPU per SPU project manager, exam to consist of nozzle and surrounding shell.
62 RHD-02.14A-01N IP3-05-24915 RHD inlet nozzles to 36B heater.
Turbine Building. Located approximately 30' West and 10' North of A/18. El 43' Yes Yes No Yes 50015 8"
Higher inlet velocities from SPU per SPU project manager, exam to consist of nozzle and surrounding shell.
63 RHD-02.15B-01N IP3-05-24916 RHD inlet nozzles to 36C heater.
Turbine Building. Located approximately 20' West and 10' North of A/18. El 43' Yes Yes No Yes 50010 8"
Higher inlet velocities from SPU per SPU project manager, exam to consist of nozzle and surrounding shell.
64 RHD-02.16A-01N IP3-05-24917 RHD inlet nozzles to 36C heater.
Turbine Building. Located approximately 20' West and 10' North of A/18. El 43' Yes Yes No Yes 50015 8"
Higher inlet velocities from SPU per SPU project manager, exam to consist of nozzle and surrounding shell.
65 FAC-07-RHD-01 IP3-05-24989 31B Reheater Drain tank to condenser.
Pipe and reducer downstream of RHD-LCV-1105C.
Turbine Building. Located approximately 12' South of B4/15.7. El 41' No Yes No Yes 50017 8"X6" From Leak report, LCV-1105C leaks to condenser.
66 FAC-07-RHD-02 IP3-05-24990 Main steam trap header to discharge canal Turbine Building. Located approximately 4' South and 3" East of column D1/13, El.
18'.North of DCT. El 15' No No Yes Yes 9321-21313 4"
Leak found downstream of valve MS-97 due to corrosion. Inspect upstream of section to be replaced via WO IP3-05-0500 8 of 15 3R14 FAC Scope (Ipe0067429).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 NUMBER EXAM POINT WORK ORDER DESCRIPTION LOCATION SCAFFOLD INSULATION PAINT PIPE PREP DRAWING PIPE SIZE REMARKS 67 MSD-01.3B-03E IP3-05-24930 31B MSR drain to MSR drain tank Turbine Building. Located underneath 31B MSR Yes Yes No Yes 50078 12" Checworks pick. Need inspections on parallel trains and varied geometry for model calibration. OE from Calvert Cliffs. Common scaffold with MSD-01.3B-03E and MSD-01.1B-06T 68 MSD-01.1B-06T IP3-05-24931 31B MSR drain to MSR drain tank Turbine Building. Located underneath 31B MSR Yes Yes No Yes 50078 12" Checworks pick. Need inspections on parallel trains and varied geometry for model calibration. OE from Calvert Cliffs. Common scaffold with MSD-01.3B-03E and MSD-01.1B-06T 69 FAC-07-VCD-01 IP3-05-24991 Piping segments from MSR 31A.
Exam consists of 12 components inspected in FAC exam 99-PT-25, UT report 99UT258, WO 99-02585-34.
Piping segments are located approximately 2' South and 1' East of B4/17.3. El 45' Yes Yes No Yes 9321-F-29013-1 3"
Calculation reinspection 99-PT-25-2 IP3-CALC-MSR-03132. May be descoped if recommended VCD piping replacements implemented.
70 FAC-07-VCD-02 IP3-05-24993 Piping segments from MSR 31B, back to back 45 elbows, 6" UPSM and DNSM Piping segments are located approximately 12' West of F/19.
El 45' Yes Yes No Yes 9321-F-29013-1 3"
Calculation reinspection 99-PT-29-5 IP3-CALC-MSR-03132. May be descoped if recommended VCD piping replacements implemented.
71 FAC-07-VCD-03 14C IP3-05-24933 Piping segments DNSM of 31A MSR valve VCD-PCV-7008. Exam consists of 12" piping UPSM and DNSM of Westinghouse Flow Control section and all pipe and components DNSM of the control section until the pipe enters the 31 condenser.
Turbine Building. Located approximately 6' North and 2' West of B4/14.3 El. 36'. 3' under grating. Partially accessible from work platform on 31 condenser.
Yes Yes No Yes 9321-F-20233 Sheet 1 and 29033 3"
Calculation reinspection 03-PT-
- 02. IP3-CALC-HD-03735. May be descoped if recommended VCD piping replacements implemented. UPSM pipe inspected in 3R13 FAC-05-VCD-04P 14C 72 FAC-07-VCD-04 14C IP3-05-24934 Piping segments DNSM of 32A MSR valve VCD-PCV-7009. Exam consists of 12" piping UPSM and DNSM of Westinghouse Flow Control section and all pipe and components DNSM of of the control section until the pipe enters the condenser.
Turbine Building. Located approximately 2' South and 2' East of B4/15.7. From El. 36', 3' under grating Yes Yes No Yes 9321-F-20233 Sheet 1 and 29033IP3 24934 3"
Calculation reinspection 03-PT-
- 03. IP3-CALC-HD-03735. May be descoped if recommended VCD piping replacements implemented. 14C 73 FAC-07-VCD-05 IP3-03-24788 Piping segments from MSR 32B. Two (2) 90 degree elbows per previous exam.
Turbine Building. Located approximately 12' west and on the centerline of F/19, El. 46' Yes Yes No Yes 9321-F-29013-1 3"
Calculation reinspect IP3-CALC-MSR-03132 Rev. 1, 1B 3R12 exam point 03-PT-06-03. System Engineer recommendation, experience with leaks and wear in this piping. Deferred from 3R13.
MSR DRAINS 9 of 15 3R14 FAC Scope (Ipe0067429).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 NUMBER EXAM POINT WORK ORDER DESCRIPTION LOCATION SCAFFOLD INSULATION PAINT PIPE PREP DRAWING PIPE SIZE REMARKS 74 FAC-07-VCD-06 IP3-05-25023 Exam consists of elbow dnsm of VCD-PCV-7009 Turbine Building. Located approximately 10' East of A/15.
EL 53' No Yes No Yes 9321-20233 3"
Reinspection 03-PT-01, FAC VCD-14 75 FAC-07-VCD-07 IP3-05-25024 EXAM CONSISTS OF ELBOW DOWNSTREAM OF VCD-2. MSR 33B Turbine Building. Located approximately 7' West and 4' North and F/17. El 53' No Yes No Yes 9321-20233 3"
Reinspection FAC-05-VCD-16 76 FAC-07-VCD-08 Canceled IP3-05-25025 Piping from 32A MSR to 36A FWH.
Exam consists of 90 elbow and 6" UPSM and DNSM.
Turbine Building. Located approximately 10' South and 2' West of B4/15.7. El 45' Yes Yes No Yes 9321-29013 3"
Reinspection 99-PT-24-10 CANCELED (Replaced) 77 FAC-07-MSR-01 IP3-05-24937 Piping segments to include four (4) 90 degree elbows plus 12" UPSM and DNSM piping adjacent to fittings of the MSR 33B Channel Head vent line to the reheater drain tank 33B.
Turbine Building. Located approximately 4' North and 21' West of F/17., El. 58' Yes Yes No Yes 9321-F-20233 Sheet 2 2 1/2" Calculation reinspection 03-PT-26, IP3-CALC-HD-03812.
78 FAC-07-MSR-02 IP3-05-25033 Piping DNSM of MS-PCV-7005, MSR leak off valve.
Turbine Building. 53' El.
Yes Yes No Yes 9321-F-20233 1"
From Leak report, PCV-7005 leaks to condenser. Confirm scaffoldng and insulation.
10 of 15 3R14 FAC Scope (Ipe0067429).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 NUMBER EXAM POINT WORK ORDER DESCRIPTION LOCATION SCAFFOLD INSULATION PAINT PIPE PREP DRAWING PIPE SIZE REMARKS 79 MS-FE-449 IP3-05-24959 Main Steam Venturi from 34 SG.
VC El 107' Yes Yes No Yes 9321-F-25423 28" Per OE 15860 from Calvert Cliffs.
Piping wall erosion found around the drain slots at the DNSM end of the Main Steam Flow Venturi.
80 FAC-07-MST-01 IP3-05-25028 Piping segments downstream of MST-80, per previous inspection 01-PT-24 Turbine Building. Located approximately 25' West of F/14, El. 36' No Yes No Yes 9321-F-20423 3/4", 1" Calculation reinspection 01-PT-
- 24. IP3-CALC-03426. RSL 9/2008 81 FAC-07-MST-02 IP3-05-24940 Piping segments to include DNSM piping of MST-24 and bypass valve MS-100-3 to 12" DNSM of valve MS-99-30 Turbine Building. Located approximately on the centerline and 2' West of A/19, El. 15' No Yes No Yes 9321-F-20413 3/4", 1" Calculation reinspection IP-CALC-05-00099. Last inspected 3R13.
82 FAC-07-MST-03 IP3-05-25029 Piping segments to include DNSM piping of MST-4 and bypass valve MS-68-4 to 12" DNSM of valve MS-105-4 Aux Boiler Building. Located approximately 10' West of H8/207. El 43' No Yes No Yes 9321-F-20413 3/4", 1" Trap leaks by. IP3-05-00385.
Steam trap report.
83 FAC-07-MST-04 IP3-05-24941 Piping segments to include DNSM piping of MST-25 and bypass valve MS-100-4 to 12" DNSM of valve MS-99-34 Turbine Building. Located approximately on the centerline and 2' South of A/19, El. 15' No Yes No Yes 9321-F-20413 3/4", 1" Past leaks; never been inspected.
Steam trap report.
84 FAC-07-TD-01 IP3-05-24942 Piping segments to include two (2) 45 degree elbows and piping UPSM of MS-FCV-1157 and one (1) elbow and piping DNCM of MS-FCV-1157 until it enters the condenser.
Piping segments located on the mezz. Platform under HP Turbine. Southwest corner approximate El. 31' No Yes No Yes 9321-F-20173 1.5" 2"
Calculation reinspection 03-PT-09, IP3-CALC-MS-03085. May be descoped if recommended High Pressure Turbine drain piping replacements implemented.
85 FAC-07-TD-02 IP3-05-24943 Piping segments to include piping and (3) elbows UPSM of MS-FCV-1155 and 1 elbow and piping DNSM to h the condenser.
Piping segments located on the mezz. Platform under HP Turbine. Southwest corner approximate El. 31' No Yes No Yes 9321-F-20173 1.5" 2"
Calculation reinspection 03-PT-12-01, IP3-CALC-MS-03085. May be descoped if recommended High Pressure Turbine drain piping replacements implemented.
86 FAC-07-TD-03 IP3-05-24944 Piping DNSM of MS-HCV-416-3.
Northeast corner HP turbine El.
53'.
No Yes No Yes 9321-F-20173 9321-F-20823 1.5", 3" Calculation reinspection. IP-CALC-04-01795. FAC-05-TD-02.
Also System Engineer recommendation; experience with leaks in this piping.
MAIN STEAM HIGH PRESSURE TURBINE DRAINS 11 of 15 3R14 FAC Scope (Ipe0067429).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 NUMBER EXAM POINT WORK ORDER DESCRIPTION LOCATION SCAFFOLD INSULATION PAINT PIPE PREP DRAWING PIPE SIZE REMARKS 87 HD-9.3A-02N IP3-05-25031 LPFWH 31A Drains inlet nozzle and adjacent shell area Turbine Building. Located on the north side of LPFWH 31A next to condenser wall.
Yes Yes No Yes 50031 12" Recommendation in SPU report "Evaluation of Feedwater Heater Performance Operation at current and Uprate Conditions Indian Point Station Unit No. 3; Low Pressure Heater No. 31 ABC".
Common scaffold with HD-9.3A-02N and HD-9.4A-04N.
88 HD-9.4A-04N IP3-05-25032 LPFWH 31A Drains inlet nozzle and adjacent shell area Turbine Building. Located on the north side of LPFWH 31A next to condenser wall.
Yes Yes No Yes 50031 12" Recommendation in SPU report "Evaluation of Feedwater Heater Performance Operation at current and Uprate Conditions Indian Point Station Unit No. 3; Low Pressure Heater No. 31 ABC".
Common scaffold with HD-9.3A-02N and HD-9.4A-04N.
89 EX-05.1C-04N IP3-05-24948 LPFWH 32C Steam Inlet nozzle and adjacent shell area.
Turbine Building LPFWH 32C; exam location inside condenser.
Yes TS No Yes 50087 22" Recommendation in SPU report "Evaluation of Feedwater Heater Performance Operation at current and Uprate Conditions Indian Point Station Unit No. 3; Low Pressure Heater No. 32 A/B/C".
Note that nozzle and extraction steam inlet piping on 32B was performed during 3R13, but shell was not inspected.
90 EX-05.2C-06N IP3-05-24950 LPFWH 32C Steam Inlet nozzle and adjacent shell area.
Turbine Building LPFWH 32C; exam location inside condenser.
Yes TS No Yes 50087 22" Same as EX-05.1C-04N.
91 EX-04.6-06N IP3-05-25045 LPFWH 33A Steam Inlet Nozzle and adjacent shell area.
Turbine Building LPFWH 33A Yes Yes No Yes 50007 20" No previous inspections on LPFWH 33 shells. OE21384 from LaSalle experienced steam leak in shell adjacent to impingement plate.
FEEDWATER HEATERS 12 of 15 3R14 FAC Scope (Ipe0067429).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 NUMBER EXAM POINT WORK ORDER DESCRIPTION LOCATION SCAFFOLD INSULATION PAINT PIPE PREP DRAWING PIPE SIZE REMARKS 92 PD-01.2-10O IP3-04-13364 PRESEPRTR DRAINS Exam consists of orifice PD-01.2-10O.
Turbine Building. Located approximately 15' South and 10' West of C4/20, El. 16' No Yes No Yes EC-H-50075 10" Checworks pick. No inspection downstream of orifice or on this line. Deferred from 3R13.
93 SJAE31-DS-CV19 IP3-05-24945 SJAE31 Intermediate condenser drain DNSM of valve CA-CV-19. Exam to consist of piping downstream of valve to 12" dnsm of elbow.
Turbine building. Underneath SJAE 31 located 3' North and 7' East of A/12. El 36' No No Yes Yes 9321-F-20253 1"
System Engineer recommendation. OE from other plants. Leaks or failures in this system caused shutdowns due to loss of condenser vacuum.
94 SJAE31-DS-CV28 IP3-05-24946 SJAE31 Intermediate Condenser drain DNSM of valve CA-CV-28 at condenser connection Turbine building. North of DCT at condenser wall.
Yes No Yes Yes 9321-F-20253 1"
System Engineer recommendation. OE from other plants. Leaks or failures in this system caused shutdowns due to loss of condenser vacuum.
95 RHD-02.15A-02E IP3-06-23430 RHD HDR TO 36C HTR. Above HDT.
Turbine Building. Located approximately 20' South and 20' West of A/19. El 32' Yes Yes No Yes 50015 6"
EOC for leak CR-IP3-2006-02270 96 RHD-02.13A-01P IP3-06-23432 RHD HDR TO 36B HTR.
Turbine Building. Located approximately 4' North and 2' West of BB/19. El 33' Yes Yes No Yes 50015 6"
EOC for leak CR-IP3-2006-02270 97 RHD-02.13A-02E IP3-06-23440 RHD HDR TO 36B HTR.
Turbine Building. Located approximately 4' North and 2' West of BB/19. El 33' Yes Yes No Yes 50015 6"
EOC for leak CR-IP3-2006-02270 98 RHD-02.8B-06T IP3-06-23441 RHD HDR TO 36C HTR Turbine Building. Located approximately 4' North and 2' West of BB/19. El 33' Yes Yes No Yes 50010 10" X 6" EOC for leak CR-IP3-2006-02270 99 RHD-02.14B-01P IP3-06-23446 RHD HDR TO 36C HTR Turbine Building. Located approximately 4' North and 2' West of BB/19. El 33' Yes Yes No Yes 50010 6"
EOC for leak CR-IP3-2006-02270 100 RHD-02.14B-02E IP3-06-23447 RHD HDR TO 36C HTR Turbine Building. Located approximately 4' North and 2' West of BB/19. El 33' Yes Yes No Yes 50010 6"
EOC for leak CR-IP3-2006-02270 101 RHD-02.9B-02T IP3-06-23449 RHD HDR TO 36B HTR.
Turbine Building. Located approximately 4' North and 2' West of BB/19. El 33' Yes Yes No Yes 50010 10" x 6" EOC for leak CR-IP3-2006-02270 102 RHD-02.12B-01P IP3-06-23450 RHD HDR TO 36B HTR.
Turbine Building. Located approximately 4' North and 2' West of BB/19. El 33' Yes Yes No Yes 50010 6"
EOC for leak CR-IP3-2006-02270 103 RHD-02.12B-02E IP3-06-23451 RHD HDR TO 36B HTR.
Turbine Building. Located approximately 4' North and 2' West of BB/19. El 33' Yes Yes No Yes 50010 6"
EOC for leak CR-IP3-2006-02270 104 EX-01.5A-15N IP3-06-23346 36A FWH EX STEAM INLET NOZZLE TB 36' Yes Yes No Yes 50000 EOC For leak in 25C FWH UT exam STEAM JET AIR EJECTORS PRESEPARATOR DRAINS ADDED SCOPE 13 of 15 3R14 FAC Scope (Ipe0067429).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 NUMBER EXAM POINT WORK ORDER DESCRIPTION LOCATION SCAFFOLD INSULATION PAINT PIPE PREP DRAWING PIPE SIZE REMARKS 105 EX-01.5A-15N IP3-06-24524 36A FWH EX STEAM INLET NOZZLE TB 36' Yes Yes No Yes 50000 EOC For leak in 25C FWH PEC Exam 106 EX-01.5B-13N IP3-06-23356 36B FWH EX STEAM INLET NOZZLE TB 36' Yes Yes No Yes 50000 EOC For leak in 25C FWH UT Exam 107 EX-01.5B-13N IP3-06-24526 36B FWH EX STEAM INLET NOZZLE TB 36' Yes Yes No Yes 50000 EOC For leak in 25C FWH PEC Exam 108 EX-01.5C-13N IP3-06-23366 36C FWH EX STEAM INLET NOZZLE TB 36' Yes Yes No Yes 50000 EOC For leak in 25C FWH UT Exam 109 EX-01.5C-13N IP3-06-24529 36C FWH EX STEAM INLET NOZZLE TB 36' Yes Yes No Yes 50000 EOC For leak in 25C FWH PEC Exam 110 FAC-07-VCD-09 IP3-06-23456 VCD Discharge from MSR 31A TB EL 52' Yes Yes No Yes 9321-29013 Pipe replacement scope reduction 111 FAC-07-VCD-10 IP3-06-23458 VCD Discharge from MSR 31A; 4 elbows TB EL 36' West of 33' mezz stairs No Yes No Yes 9321-29023 Pipe replacement scope reduction 112 FAC-07-VCD-11 IP3-06-23462 VCD Discharge from MSR 32A; 2 elbows TB EL 36' West of 33' mezz stairs No Yes No Yes 9321-29023 Pipe replacement scope reduction 113 FAC-07-VCD-12 IP3-06-23464 VCD Discharge from MSR 33A; 1 elbow TB EL 36' West of 33' mezz stairs No Yes No Yes 9321-29023 Pipe replacement scope reduction 114 FAC-07-GSS-01 IP3-06-23466 Inspection of Gland Seal Steam piping inside condenser Condenser No No No Yes 9321-05-2355 723J753 Siemens Westinghouse OE Service Bulletin 53009 ST Totals 74 103 8
114 40 8
106 Total Thermal insulation 3
Total FAC Exam's 114 114 114 114 1
EX-05.1C-04N IP3-06-22059 IP3-06-22061 Remove/Replace thermal shields on EX-05.1C-04N and shell to support FAC Exams. 32C FWH Inside 31 Condenser 2
EX-05.2C-06N IP3-06-22085 IP3-06-22086 Remove/Replace thermal shields on EX-05.2C-06N and shell to support FAC Exams 32C FWH Inside 31 Condenser 3
EX-04.2-09T IP3-05-24952 IP3-05-24955 Remove/Replace thermal shields on EX-04.2-09T to support FAC Exams Inside 33 Condenser 4
EX-04.2-09T IP3-05-25034 Open 33 Condenser 33 Condenser 5
EX-05-1C-04N EX-05.2C-06N IP3-06-22118 OPEN 31 CONDENSER 31 CONDENSER SUPPORT WORK ORDERS 14 of 15 3R14 FAC Scope (Ipe0067429).Xls
FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14 ER IP3-05-24045 NUMBER EXAM POINT WORK ORDER DESCRIPTION LOCATION SCAFFOLD INSULATION PAINT PIPE PREP DRAWING PIPE SIZE REMARKS 1
Contingency WO from RO12 IP3-027763793 2
Contingency WO from 3R13 IP3-03-11345 3
Inaccessible location.
Alternate location selected in 3R13.
Alternate location selected in 3R13.
Contingency WO from 3R13.
IP3-03-11337 Number of Scaffolds needed 74 PRE-OUTAGE INSPECTIONS Cost of scaffolds
$280,000 A
Insulation likely to contain asbestos TS Insulation is a welded stainless steel Thermal Shield Number of insulation(remove/install) 103 Cost of insulation
$164,000 LEGEND WORK ORDERS TO BE CANCELLED 15 of 15 3R14 FAC Scope (Ipe0067429).Xls
25, 22%
7, 6%
28, 25%
34, 30%
2, 2%
12, 10%
6, 5%
3R14 FLOW ACCELERATED CORROSION INSPECTION
SUMMARY
REASONS FOR SELECTION OF 114 INSPECTION LOCATIONS CHECWORKS INDUSTRY OE IPEC OE CALCULATION REINSPECTION SNAPSHOT SCOPE ASSESSMENT POWER UPRATE DEFERRALS
NUMBER EXAM POINT WORK ORDER EXTRACTION 1
EX-04.2-09T IP3-05-24954 2
EX-02.14-07P IP3-05-24843 3
EX-04.13-07T IP3-05-24846 4
EX 04 4 08E IP3 0 2484 EXTRACTION 4
EX-04.4-08E IP3-05-24847 5
EX-04.11-08E IP3-05-24848 6
EX-04.21-02P IP3-05-24849 7
EX-03.1A-14E IP3-05-24850 8
FAC-07-EX-01 IP3-05-24984 9
FAC-07-EX-02 IP3-05-24851 10 FAC-07-EST-01 IP3-05-24853 FEEDWATER 11 FW-02.1A-01N IP3-05-24854 12 FW-02.1A-02E IP3-05-24856 13 FW-02.1A-03P IP3-05-24857 14 FW-02.1A-04E IP3-05-24858 15 FW-01.3-13P IP3-05-24859 16 FW-01.3-14E IP3-05-24860 17 FW-02.4-11E IP3-05-24861 FEEDWATER 18 FW-02.8A-26R IP3-04-13353 19 FW-02.8B-25R IP3-05-24864 20 FW-02.8D-24R IP3-05-24866 21 FW-02.5-03T IP3-05-24985 22 FW-03.1D-08B IP3-05-24867 23 FW-03.1C-13P IP3-04-13354 24 FW-02.8B-13F IP3-05-24868 25 FW 01 6C 10N IP3 05 24869 25 FW-01.6C-10N IP3-05-24869 26 FW-01.6A-12N IP3-05-24870 27 CD-06.3B-02N IP3-05-24872 28 CD-05.1B-04P IP3-04-13366 29 CD-03.1C-01N IP3-05-24873 30 CD-04.1C-01N IP3-05-24874 31 CD-04.1C-5E IP3-05-24875 CONDENSATE 31 CD 04.1C 5E IP3 05 24875 32 CD-04.1C-7E IP3-05-24876 33 CD-2.1C-12T IP3-05-24877 34 CD-2.8C-03P IP3-05-24882 35 CD-2.8B-01P IP3-05-24883 36 CD-2.8B-03P IP3-05-24886 37 CD-04.1A-04P IP3-05-24887 38 FAC-07-CP-01 IP3-05-24986 39 FAC 07 CP 02 IP3 05 24987 39 FAC-07-CP-02 IP3-05-24987 40 HD-3.1B-09E IP3-05-24889 41 HD-2.1B-02R IP3-05-24890 42 HD-12.2A-08T IP3-05-24891 43 HD-05.1C-02R IP3-05-24892 44 FAC-07-HD-01 IP3-05-24896 HEATER DRAINS
45 FAC-07-HD-02 IP3-05-24897 46 FAC-07-HD-03 IP3-05-24988 47 FAC-07-HD-04 IP3-05-24898 48 FAC-07-HD-05 IP3-05-24899 49 RHD-01.3A-02P IP3-05-24900 50 RHD-02.4A-06L IP3-05-24902 51 RHD 02 10A 11T IP3 05 24904 REHEATER DRAINS 51 RHD-02.10A-11T IP3-05-24904 52 RHD-02.12B-11T IP3-05-24905 53 RHD-02.14B-12T IP3-05-24906 54 RHD-02.6A-06L IP3-05-24907 55 RHD-02.9A-11T IP3-05-24908 56 RHD-02.5A-02R IP3-05-24910 57 RHD-02.6A-02E IP3-05-24911 58 RHD-02.6A-03P IP3-04-13370 58 RHD 02.6A 03P IP3 04 13370 59 RHD-02.2A-02E IP3-05-24912 60 RHD-02.3A-02R IP3-05-24913 61 RHD-02.13B-01N IP3-05-24914 62 RHD-02.14A-01N IP3-05-24915 63 RHD-02.15B-01N IP3-05-24916 64 RHD-02.16A-01N IP3-05-24917 65 FAC-07-RHD-01 IP3-05-24989 66 FAC 07 RHD 02 IP3 05 24990 66 FAC-07-RHD-02 IP3-05-24990 67 MSD-01.3B-03E IP3-05-24930 68 MSD-01.1B-06T IP3-05-24931 69 FAC-07-VCD-01 IP3-05-24991 70 FAC-07-VCD-02 IP3-05-24993 71 FAC-07-VCD-03 IP3-05-24933 72 FAC-07-VCD-04 IP3-05-24934 MSR DRAINS 72 FAC-07-VCD-04 IP3-05-24934 73 FAC-07-VCD-05 IP3-03-24788 74 FAC-07-VCD-06 IP3-05-25023 75 FAC-07-VCD-07 IP3-05-25024 76 FAC-07-VCD-08 IP3-05-25025 77 FAC-07-MSR-01 IP3-05-24937 78 FAC-07-MSR-02 IP3-05-25033 MAIN STEAM 79 MS-FE-449 IP3-05-24959 80 FAC-07-MST-01 IP3-05-25028 81 FAC-07-MST-02 IP3-05-24940 82 FAC-07-MST-03 IP3-05-25029 83 FAC-07-MST-04 IP3-05-24941 84 FAC-07-TD-01 IP3-05-24942 HIGH PRESSURE TURBINE DRAINS 85 FAC-07-TD-02 IP3-05-24943 86 FAC-07-TD-03 IP3-05-24944 87 HD-9.3A-02N IP3-05-25031 88 HD-9.4A-04N IP3-05-25032 89 EX-05.1C-04N IP3-05-24948 90 EX-05.2C-06N IP3-05-24950 FEEDWATER HEATERS
91 EX-04.6-06N IP3-05-25045 92 PD-01.2-10O IP3-04-13364 93 SJAE31-DS-CV19 IP3-05-24945 94 SJAE31-DS-CV28 IP3-05-24946 PRESEPARATOR DRAINS STEAM JET AIR EJECTORS SUPPORT WORK ORDERS 1
EX-05.1C-04N IP3-05-24952 2
EX-05.2C-06N IP3-05-24952 3
EX-04.2-09T IP3-05-24955 4
LPFW32C IP3-05-25034 1
Contingency WO from RO12 IP3-027763793 2
Contingency WO from 3R13 IP3-03-11345 SUPPORT WORK ORDERS 3R14 WORK ORDERS TO BE CANCELLED 2
Contingency WO from 3R13 IP3 03 11345 3
Inaccessible location.
Alternate location selected in 3R13.
Alternate location selected in 3R13.
Contingency WO from 3R13.
3R14 FAC Scope Work Breakdown Total number of inspectons Number of FAC Portals1 Number of scaffolds Number of insulation removals 111 inspections; 8 of which are pre-outage 61 49 97 Insulation removals; 3 of which are Stainless Steel thermal shields located in condenser
- 1. Portals are first time FAC inspections that are to be re-insulated with blanket insulation for ease of removal for future inspection. Becomes capital expense.