ML13204A193

From kanterella
Revision as of 16:43, 4 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Open House with Members of the Public Regarding Grand Gulf Nuclear Station
ML13204A193
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/23/2013
From:
NRC Region 4
To:
Quichocho J
References
Download: ML13204A193 (3)


Text

U N IT E D S TA TE S N U C LE AR R E GU LA TOR Y C OM MI S S I ON R E G IO N I V 1600 EAST LAMAR BLVD AR L I NG TO N , TE X AS 7 60 1 1 - 4511 July 23, 2013

SUBJECT:

OPEN HOUSE WITH MEMBERS OF THE PUBLIC FACILITY: Grand Gulf Nuclear Station DOCKET: 50-416 DATE AND TIME: Monday, August 5, 2013 12:00 p.m. - 1:30 p.m. (CDT)

LOCATION: Claiborne County Administration Building 510 Main Street Port Gibson, MS 39150 PURPOSE: The purpose of the meeting is for Claiborne County Commissioners and other members of the community to meet with NRC staff members to discuss issues related to the Grand Gulf Nuclear Station.

In particular, the NRC staff will describe the results of their 2012 end-of-cycle assessment of Grand Gulf Nuclear Station performance.

(For reference, please see the assessment letter at ADAMS accession number ML13060A231.)

CATEGORY: This is a Category 3 Meeting. Public participation is actively sought for this meeting to fully engage the public in a discussion of regulatory issues.

PARTICIPANTS: NRC:

Jessie Quichocho, Acting Branch Chief, Branch C, Division of Reactor Projects Richard Smith, Senior Resident Inspector, Grand Gulf Nuclear Station Blake Rice, Resident Inspector, Grand Gulf Nuclear Station LICENSEE AND ORGANIZATIONS:

Entergy Operations, Inc.

Claiborne County Commissioners MEETING CONTACT: Bob Hagar 817/200-1546 bob.hagar@nrc.gov

The Nuclear Regulatory Commission provides reasonable accommodations to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript of other information from the meeting in another format (e.g. Braille or large print), please notify the Nuclear Regulatory Commissions meeting contact listed above. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room page of the NRCs public web site at:

http://www.nrc.gov/readingrm/adams.html.

To receive a summary of future meetings and other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html. Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

Electronic distribution by RIV:

Public Meeting Notice System (PMNS Resource@nrc.gov)

Regional Administrator (Art.Howell@nrc.gov)

Acting Deputy Regional Administrator (Thomas.Bergman@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Tom.Blount@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Rich.Smith@nrc.gov)

Resident Inspector (Blake.Rice@nrc.gov)

GG Administrative Assistant (Alley.Farrell@nrc.gov)

Acting DRP Branch Chief (Jessie.Quichocho@nrc.gov)

Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Alan.Wang@nrc.gov)

Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Vivian.Campbell@nrc.gov)

R:\_Reactors\GG\GG Meeting Notice 130719.pdf ADAMS: No Yes SUNSI Review Complete Reviewer Initials: JQ Publicly Available Non-Sensitive Non-publicly Available Sensitive DRP/SPE PAO ORA DRP/BC BHagar LUselding BMaier JQuichocho

/RA/ /RA/VDricks for /RA/ /RA/

7/22/13 7/22/13 7/22/12 7/22/13 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax