MONTHYEARPNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-031, License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements2022-09-14014 September 2022 License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2022-025, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 182022-09-12012 September 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 18 PNP 2022-032, 2022 Evacuation Time Estimate Report2022-09-0707 September 2022 2022 Evacuation Time Estimate Report PNP 2022-023, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 172022-08-15015 August 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 17 PNP 2022-014, Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 342022-07-13013 July 2022 Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 34 PNP 2022-016, License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-07-12012 July 2022 License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-017, Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E2022-07-11011 July 2022 Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E PNP 2022-019, & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals2022-06-24024 June 2022 & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals PNP 2022-011, Termination of the Emergency Response Data System (Eros) Link2022-06-13013 June 2022 Termination of the Emergency Response Data System (Eros) Link PNP 2022-010, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2022-06-13013 June 2022 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel PNP 2022-004, 2021 Radiological Environmental Operating Report2022-05-12012 May 2022 2021 Radiological Environmental Operating Report PNP 2022-003, and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report2022-04-25025 April 2022 and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2022-007, 2021 Annual Non-Radiological Environmental Operating Report2022-04-21021 April 2022 2021 Annual Non-Radiological Environmental Operating Report PNP 2022-012, Response to Request for Additional Information Regarding License Amendment Request to Revise Facility Operating License and Technical Specifications for a Permanently Defueled Condition2022-04-21021 April 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Facility Operating License and Technical Specifications for a Permanently Defueled Condition PNP 2022-002, Annual Report of Changes in Emergency Core Cooling System Models2022-03-24024 March 2022 Annual Report of Changes in Emergency Core Cooling System Models PNP 2021-012, Report of Changes, Tests and Experiments, and Summary of Commitment Changes2021-10-0707 October 2021 Report of Changes, Tests and Experiments, and Summary of Commitment Changes PNP 2021-029, Pre-Notice of Disbursement from Decommissioning Trust2021-09-0202 September 2021 Pre-Notice of Disbursement from Decommissioning Trust PNP 2021-013, Request for Rescission of Interim Compensatory Measure from Order EA-02-0262021-07-21021 July 2021 Request for Rescission of Interim Compensatory Measure from Order EA-02-026 PNP 2021-020, Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.122021-06-15015 June 2021 Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.12 PNP 2021-005, License Amendment Request to Revise Renewed Facility Operating License and Technical Specifications for Permanently Defueled Condition2021-06-0101 June 2021 License Amendment Request to Revise Renewed Facility Operating License and Technical Specifications for Permanently Defueled Condition PNP 2021-026, Pre-Notice of Disbursement from Decommissioning Trust2021-05-27027 May 2021 Pre-Notice of Disbursement from Decommissioning Trust PNP 2021-016, 2020 Radiological Environmental Operating Report2021-05-12012 May 2021 2020 Radiological Environmental Operating Report PNP 2021-022, 2020 Annual Non-Radiological Environmental Operating Report2021-04-27027 April 2021 2020 Annual Non-Radiological Environmental Operating Report PNP 2021-015, and Big Rock Point, Submittal of 2020 Annual Radioactive Effluent Release and Waste Disposal Report2021-04-21021 April 2021 and Big Rock Point, Submittal of 2020 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2021-017, Schedule Change to Open Phase Condition Detection Implementation2021-04-0101 April 2021 Schedule Change to Open Phase Condition Detection Implementation PNP 2021-003, 2020 Steam Generator Tube Inspection Report2021-03-25025 March 2021 2020 Steam Generator Tube Inspection Report PNP 2021-010, Annual Report of Changes in Emergency Core Cooling System Models2021-03-19019 March 2021 Annual Report of Changes in Emergency Core Cooling System Models PNP 2021-004, Report - Changes to Palisades Nuclear Plant Technical Specifications Bases2021-03-10010 March 2021 Report - Changes to Palisades Nuclear Plant Technical Specifications Bases PNP 2021-006, Pre-Notice of Disbursement from Decommissioning Trust2021-03-0808 March 2021 Pre-Notice of Disbursement from Decommissioning Trust PNP 2021-001, ASME Section XI 90-Day Owner'S Activity Report2021-01-12012 January 2021 ASME Section XI 90-Day Owner'S Activity Report 2023-09-28
[Table view] |
Text
Entergy Entergy Nuclear Nuclear Operations, Operations, Inc Inc..
Palisades Palisades Nuclear Nuclear Plant Plant 27780 27780 Blue Blue Star Star Memorial Memorial Highway Highway
~ Entergy ru IlL Covert, Covert, MI Tel Ml 49043-9530 49043-9530 269 7642000 Te12697642000 Anthony J.
Anthony J. Vitale Vitale Site Site Vice President President PNP 2014-073 PNP July 30, July 30, 2014 Nuclear Regulatory Commission U. S. Nuclear U.
ATTN: Document Control Desk 11555 Rockville Pike 11555 Rockville, M MD D 20852
SUBJECT:
Supplemental Response to NRC Request Palisades Nuclear Plant Supplemental for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Recommendations 2.3 of the Near-Term Task Force Aspects of Recommendations Review of Insights from the Fukushima Dai-ichi Accident Palisades Nuclear Plant Docket 50-255 License No. DPR-20
REFERENCES:
- 1. NRC letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1,2.3, Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 12, 2012 (Adams Accession No. ML 12056A046)
ML12056A046)
- 2. Entergy Nuclear Operations, Inc. letter, PNP 2012-101, Flooding Walkdown Report - Response to NRC Request for
-
Information Pursuant to 10 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommend Recommendation ation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated November 27, 2012 (Adams Accession No.
27,2012 No.
ML1 2332A377)
ML12332A377)
Dear SirSir or or Madam:
Madam:
On March March 12, 2012, the NRC 12, 2012, issued Reference 11 to all NRC issued all power power reactor licensees.
licensees.
Enclosure 4 of Reference 1 of Reference 1 requestedrequested that each each licensee licensee perform perform flood flood protection protection walkdowns walkdowns and and report report the results within 180 days within 180 days ofof NRC NRC endorsement of the the flooding walkdown walkdown procedure (NEI (NEI 12-07, 12-07, Guidelines "Guidelines for Performing Verification Walkdowns Walkdowns of of Plant Plant Flood Flood Protection Protection Features).
Features"). Entergy Entergy Nuclear Nuclear Operations, Operations, Inc. Inc. (ENO)
(ENO) completed completed the the flood flood protection protection walkdowns walkdowns at at the the Palisades Palisades Nuclear Nuclear Plant Plant and and submitted submitted the the results results in in Reference Reference 2. 2. Reference Reference 22 contained openopen items items where restricted access access prevented prevented walkdown walkdown of of certain certain flood flood protection protection features. Walkdowns Walkdowns of of the the restricted restricted access access
PNP 2014-073 Page 2 of 2 items were completed by June 1,2014, 1, 2014, as committed, and this letter provides provides the results. This submittal closes the open items in Reference 2.
The attached table provides a list of the restricted access items inspected, their respective disposition, and any action planned or taken. As a result of the inspections:
- There were no additional deficiencies found in the supplemental walkdowns.
- No temporary measures were required as a result of the completed inspections.
- Available Physical Margin information was collected and documented in the walkdown record forms for each applicable item inspected in accordance with NEI 12-07.
NEI12-07.
- One of the restricted access items was reclassified as Inaccessible.
Summary of Commitments This letter contains no new or revised commitments. It completes the following commitment made in Reference 2:
ENO will perform walkdowns for equipment that could not be inspected as "ENO identified in Section 7.4 of the Flooding Walkdown Submittal Report."
Report.
This commitment was a one-time action with a scheduled completion date of June 1, 2014.
II declare under penalty of perjury that the foregoing is true and correct. Executed on July 30, 2014.
Sincerely, ajv/jse
Attachment:
Flooding Walkdown Report Open Items cc: Director of Office of Nuclear Regulation Administrator, Region Ill, III, USNRC Project Manager, Palisades, USN RC Resident Inspector, Inspector, Palisades, USN USNRCRC
Attachment Attachment Flooding Walkdown Flooding Walkdown Report Report Open Open Items Items Follows One Page Follows
Flooding Walkdown Flooding Walkdown Report Report Open Open Items Items Description of Description of Feature Feature Deficiency?
Deficiency? Deficiency Deficiency Taken Actions Taken Inaccessible?
Inaccessible?
(yes/no)
(yes/no) Description Description Planned or Planned (yes/no, ifif yes, explain (yes/no, explain below) below)
Diesel Generator Diesel Generator 1-1 Floor Drain 1-1 Floor Drain No None None None None No No Backwater Valve Backwater Valve Diesel Generator Diesel Generator 1-21-2 Floor Floor Drain Drain No None None No Backwater Valve Backwater Valve Electrical conduit Electrical conduit A026 A026 sealseal in in No None None Yes Manhole #3 Manhole within 11 C
- 3 within switchgear C switchgear room. This room. This conduit conduit feeds feeds the the The conduit seal is located deep into the motor driven motor driven auxiliary auxiliary feedwater feedwater conduit and could not be visually inspected pump in pump in the the auxiliary auxiliary feedwater feedwater or inspected with a boroscope. Inspection pump room.
pump room. would require removal of power cables for auxiliary feedwater pump P-8A within the conduit and significant disassembly of the
-- - "-----.
conduit. See evaluation below.
Evaluation Evaluation of of Electrical Electrical Conduit A026 NEI NEI 12-07, 12-07, Guidelines "Guidelines for Performing Verification Walkdowns of Plant Plant Flood Protection Features, Features," requires in Section 5.1 that inaccessible inaccessible items items shall shall be be identified identified and and justification provided that there there is is reasonable assurance that the feature is is available and will perform the external perform the external flood flood protection or mitigation or mitigation function for the full duration ofof the flood condition.
The The evaluation evaluation of of the the inaccessible inaccessible electrical electrical conduit conduit A026 A026 included included aa review review of of plant plant documentatio documentation n for this this seal seal which which verified verified that that the the seal is installed and properly seal is installed and properly designed.designed. The The evaluation evaluation concluded concluded that that there there is is reasonable reasonable assurance assurance that that the the seal seal is is available available and and will perform perform its its external external flood flood mitigation mitigation function function for for the the full full duration duration of of the the flood flood condition.
condition.