Jan X-Ray Services D/B/A Janx - NRC Form 591 Part 1 & 3, Inspection Report 03011772/2018001 (DNMS)
ML18184A118
Person / Time
Site: 03011772
Issue date: 06/19/2018
From: Ryan Craffey
NRC/RGN-III
To: Reeve W
JAN X-ray Services, JANX
References
IR 2018001
Download: ML18184A118 (2)


See also: IR 07200201/1980001

Text

NRC FORM 591M PART 1 U.S. NUCLEAR REGULATORY COMMISSION

(07-2012)

10CFR 2,201 SAFETY INSPECTION REPORT AND COMPLIANCE INSPECTION

1. LICENSEE/LOCATION INSPECTED: 2. NRG/REGIONAL OFFICE

JAN X-Ray Services d/b/a JANX Region III

8550 East Michigan A venue, Parma, MI 49269 U.S. Nuclear Regulatory Commission

Location Inspected: Job Site in Grayling, MI 2443 Warrenville Road, Suite 210

Lisle, IL 60532-4352

REPORT NUMBER(S) 2018001

3. DOCKET NUMBER(S) 4. LICENSE NUMBER(S) 5. DATE(S) OF INSPECTION

030-11772 21-16560-01 June 19, 2018

LICENSEE:

The inspection was an examination of the activities conducted under your license as they relate to radiation safety and to compliance with the Nuclear

Regulatory Commission (NRC) rules and regulations and the conditions of your license. The inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and observations by the inspector. The inspection findings are as follows:

[Z] 1. Based on the inspection findings, no violations were identified.

D 2. Previous violation(s) closed.

D 3. The violations(s), specifically described to you by the inspector as non-cited violations, are not being cited because they were self-identified,

non-repetitive, and corrective action was or is being taken, and the remaining criteria in the NRC Enforcement Policy, to exercise

discretion, were satisfied.

Non-cited violation(s) were discussed involving the following requirement(s):

D 4. During this inspection, certain of your activities, as described below and/or attached, were in violation of NRC requirements and are being

cited in accordance with NRC Enforcement Policy. This form is a NOTICE OF VIOLATION, which may be subject to posting in accordance

with 10CFR 19.11.

(Violations and Corrective Actions)

Statement of Corrective Actions

I hereby state that, within 30 days, the actions described by me to the Inspector will be taken to correct the violations identified. This statement of

corrective actions is made in accordance with the requirements of 10 CFR 2.201 (corrective steps already taken, corrective steps which will be taken,

date when full compliance will be achieved). I understand that no further written response to NRC will be required, unless specifically requested.

TITLE PRINTED NAME SIGNATURE DATE

LICENSEE'S

REPRESENTATIVE

NRC INSPECTOR Ryan Craffey 06/26/2018

BRANCH CHIEF Aaron Mccraw 06/29/2018

NRG FORM 591M PART 1 (07-2012)

NRC FORM 591M PART 3 U.S. NUCLEAR REGULATORY COMMISSION

(07-2012)

10 CFR 2.201 Docket File Information

SAFETY INSPECTION REPORT AND COMPLIANCE INSPECTION

1. LICENSEE/LOCATION INSPECTED: 2. NRG/REGIONAL OFFICE

JAN X-Ray Services d/b/a JANX Region III

8550 East Michigan A venue, Parma, MI 49269 U. S. Nuclear Regulatory Commission

Location Inspected: Job Site in Grayling, MI 2443 Warrenville Road, Suite 210

Lisle, IL 60532-4352

REPORT NUMBER(S) 2018001

3. DOCKET NUMBER(S) 4. LICENSE NUMBER(S) 5. DATE(S) OF INSPECTION

030-11772 21-16560-01 June 19, 2018

6. INSPECTION PROCEDURES USED 7. INSPECTION FOCUS AREAS

87121 FE 1-6

SUPPLEMENTAL INSPECTION INFORMATION

1. PROGRAM CODE(S) 2. PRIORITY 3. LICENSEE CONTACT 4. TELEPHONE NUMBER

03320 William Reeve - RSO (517) 531-8210

D Main Office Inspection Next Inspection Date: No Change

D Field Office Inspection

[{] Temporary Job Site Inspection Arauco Plant, West Four Mile Road, Grayling, MI

PROGRAM SCOPE

This was an unannounced field inspection of a large non-destructive testing company authorized to use radioactive

material for industrial radiography at numerous field stations and at temporary jobsites throughout NRC jurisdiction.

The scope of this inspection was limited to observations of radiographic testing on the premises of a particleboard

manufacturing plant, currently under construction in Grayling, Michigan.

PERFORMANCE OBSERVATIONS

The inspector observed the conduct of radiographic operations by the licensee's crew at the plant construction site in

Grayling. The crew routinely worked overnight at the site to minimize the potential for exposure to members of the

public, as the project was heavily staffed during the day. The inspector noted the satisfactory set-up and control of

various restricted area boundaries during these operations, as supported by independent and confirmatory surveys. The

inspector also noted adequate compliance with physical presence requirements for radiographic operations. Through

interviews, the inspector found that the radiographer and his assistant were knowledgeable of radiation protection

principles, licensee procedures and regulatory requirements, and that their dosimetry and survey instruments were

calibrated, operable, and properly utilized. The radiographic exposure device they utilized, a SPEC Model 150, was

likewise in good condition and properly labeled.

While on the jobsite, the inspector reviewed the crew's shipping papers, utilization logs, and leak test documentation.

No violations ofNRC requirements were identified as a result of this inspection.

NRG FORM 591M PART 3 (07-2012)