ML18303A232

From kanterella
Revision as of 12:42, 20 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

10/29/2018, E-Mail from K. Banovac to S. Wahnschaffe Request for Reference TMI-2 ISFSI License Renewal Application
ML18303A232
Person / Time
Site: 07200020
Issue date: 10/29/2018
From: Kristina Banovac
Renewals and Materials Branch
To: Wahnschaffe S
US Dept of Energy (DOE)
Banovac K
References
CAC 000993, CAC 011028, EPID L-2017-LNE-0007, EPID L-2017-RNW-0019
Download: ML18303A232 (2)


Text

From: Banovac, Kristina To: "Wahnschaffe, Steven D"

Subject:

Request for references re: TMI-2 ISFSI license renewal application Date: Monday, October 29, 2018 11:22:14 AM Good morning Steve, As part of NRCs ongoing review of the TMI-2 ISFSI license renewal application, we identified references that we will need to support our technical review of the application.

We request that you please submit these references to the NRC:

  • LRA reference 2.4.6, VECTRA Calculation Number 219-02.0403, Revision 0, Top End Dose Rates for TMI-2 Canisters, VECTRA Technologies, Inc., September 25, 1996.
  • LRA reference 3.11.24, Orano Federal Services, Calculation 02029.00.0000.02-01, Revision 2, Radiation Effects on Materials for TMI-2 ISFSI License Renewal, August, 2018.
  • LRA reference 3.11.97, Idaho National Engineering and Environmental Laboratory Engineering Technical Procedure Test Area North, TPR-1190, Revision 15, TMI-2 Canister Drying (Campaign #10), August 1, 2000, Idaho Falls, ID.
  • LRA reference 3.11.104, Idaho National Engineering and Environmental Laboratory Engineering Design File, EDF-797, Revision 0, Water Ingress into TMI DSCs During Storage, March 2, 1999, Idaho Falls, ID.
  • LRA reference 3.11.105, TRANSNUCLEAR WEST, Calculation 219-02.0300, Revision 1, Criticality Evaluation for the 10CFR72 INEL/TMI-2 Fuel ISS (NUHOMS-12T), August 17, 1999.
  • LRA reference 3.11.106, Idaho Cleanup Project Internal Report, INEEL/INT 00126, Revision 4, Criticality Safety Evaluation of TMI-2 Canister Transportation and Storage, May 23, 2005, Idaho Falls, ID.
  • LRA reference 3.11.157, VECTRA Calculation Number 219-02.0401, Revision 0, HSM and Cask Dose Rate Calculation, VECTRA Technologies, Inc., September 27, 1996.
  • LRA reference 3.11.216, Orano Federal Services Calculation Number CALC-3021323, Revision 0, TMI-2 Canister Top-End Dose Rates for TMI-2 ISFSI License Renewal, Orano Federal Services, July, 2018.
  • LRA reference 3.11.226, Orano Federal Services, Calculation CALC-3021788, Revision 0, TMI-2 Canister Licon Criticality Analysis for TMI-2 ISFSI License Renewal, August, 2018.
  • ORANO CALC-3021832 (referenced in 9/26/2018 DOE-ID Response to RAIs)
  • EDF-1469 (referenced in 9/26/2018 DOE-ID Response to RAIs)

Please note that the information, once submitted, will be docketed as part of the TMI-2 ISFSI license renewal application. If the information already exists elsewhere on the NRC docket, please provide the reference to the information, as the information need not be resubmitted.

Also, you previously submitted references 3.11.5 and 3.11.29 on the docket, in October 2017 and August 2017, respectively. Have these references been changed or updated since the previous submittal? If so, please submit the updated references.

Please let me know if you have any questions about this request, and thank you, Kris Kristina Banovac, Project Manager Renewals and Materials Branch Division of Spent Fuel Management U.S. Nuclear Regulatory Commission 301-415-7116