ML19261A144
From kanterella
Revision as of 01:19, 8 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML19261A144 | |
Person / Time | |
---|---|
Site: | Summer ![]() |
Issue date: | 08/26/2019 |
From: | Lippard G South Carolina Electric & Gas Co, Dominion Energy Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML19255F498 | List:
|
References | |
19-263 | |
Download: ML19261A144 (9) | |
Similar Documents at Summer | |
---|---|
Category:Letter
MONTHYEARML24038A0322024-02-0707 February 2024
[Table view](Vcsns), Unit 1, 10 CFR 21 Report - Emergency Diesel Generator Flash Contactor Relay IR 05000395/20230042024-01-31031 January 2024 Integrated Inspection Report 05000395/2023004 ML24022A1582024-01-22022 January 2024 (Vcsns), Unit 1 - Reply to a Notice of Violation: EA-23-093 ML24022A1202024-01-22022 January 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000395/2024403) ML24018A0112024-01-18018 January 2024 CFR 21 Report Emergency Diesel Generator Fuel Oil Piping IR 05000395/20240112024-01-17017 January 2024 Notification of VC Summer Station Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000395/2024011 ML23361A1042023-12-21021 December 2023 Inservice Testing Program for Pumps and Valves Fifth Interval Update and Associated Relief and Alternative Requests IR 05000395/20230912023-12-21021 December 2023 Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letternrc Inspection Report 05000395/2023091 ML23354A1802023-12-20020 December 2023 301 Examination Report with Cover Letter ML23347A0492023-12-12012 December 2023 Technical Specification Bases Changes Updated Through November 2023 ML23334A2462023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23334A2372023-11-30030 November 2023 (Vvsns), Unit 1 - Annual Commitment Change Summary Report ML23332A1942023-11-28028 November 2023 (Vcsns), Unit 1, Correction of Typographical Error in License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23317A2242023-11-0909 November 2023 (Vcsns), Unit 1 - License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23289A1172023-11-0303 November 2023 Tribal Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1152023-11-0303 November 2023 Ltr to R. Nelson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1162023-11-0303 November 2023 Ltr to W. Emerson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA IR 05000395/20234032023-11-0101 November 2023 Material Control and Accounting Program Inspection Report 05000395/2023403 Cover IR 05000395/20230032023-11-0101 November 2023 Integrated Inspection Report 05000395/2023003 ML23284A1792023-10-16016 October 2023 Subsequent License Renewal Application Online Reference Portal ML23275A0142023-10-11011 October 2023 SLRA - Acceptance and Opportunity for Hearing - Letter ML23284A1662023-10-10010 October 2023 (Vcsns), Unit 1 - Request for Regulatory Conference; (EA-23-093) IR 05000395/20230902023-10-0404 October 2023 NRC Inspection Report 05000395/2023090 and Preliminary Yellow Finding and Apparent Violation IR 05000395/20230112023-09-27027 September 2023 Focused Engineering Inspection Report 05000395/2023011 ML23250A3112023-09-20020 September 2023 Request to Revise Reactor Vessel Material Surveillance Capsule Withdrawal Schedules ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations ML23235A0432023-09-0505 September 2023 Receipt and Availability of the Subsequent License Renewal Application IR 05000395/20234012023-08-30030 August 2023 Security Baseline Inspection Report 05000395/2023401 ML23242A1192023-08-29029 August 2023 (Vcsns), Unit 1 - Inservice Inspection (ISI) Owner'S Activity Report (OAR) for Refueling Outage 27 ML23243B0362023-08-25025 August 2023 Request for FEMA Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 IR 05000395/20230052023-08-23023 August 2023 Updated Inspection Plan for Virgil C. Summer Nuclear Station (Report 05000395 2023005) ML23233A1752023-08-17017 August 2023 Application for Subsequent Renewed Operating License IR 05000395/20230022023-08-14014 August 2023 Integrated Inspection Report - Integrated Inspection Report 05000395/2023002 and Apparent Violation IR 05000395/20230102023-08-12012 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000395/2023010 ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000395/20234412023-07-17017 July 2023 95001 Supplemental Inspection Report 05000395/2023441 and Follow Up Assessment Letter ML23190A0012023-07-0909 July 2023 Special Report 2023-003 Inoperable Radiation Monitoring Instrumentation Channel ML23187A5092023-07-0606 July 2023 Request for Federal Emergency Management Agency Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23173A1052023-06-22022 June 2023 Special Report 2023-002 Inoperable Loose-Part Monitoring System Channel ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23159A2332023-06-0808 June 2023 License Amendment Request - Emergency Response Organization Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes ML23156A3092023-06-0505 June 2023 Requalification Program Inspection Virgil C. Summer Nuclear Station Unit 1 - 05000395/2023003 2024-02-07 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML22194A4152022-06-27027 June 2022
[Table view]2 to Updated Final Safety Analysis Report, Figure 12.1-9, Redacted ML22194A4072022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 12.1-5, Redacted ML22194A4512022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 12.1-1, Redacted ML22194A4382022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.4-17, Piping System Flow Diagram, Liquid Effluents from Nuclear Plant to Fairfield Penstock ML22194A4362022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.4-12, System Flow Diagram Feedwater (Nuclear) ML22194A4312022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.4-5, System Flow Diagram Circulating Water Cooling ML22194A4472022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-3, Rev 21, NRC17 ML22194A4432022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.5-11, Rev. 16, Redacted ML22194A4322022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-20, Rev. 19, Service Building First Floor and Second Floor ML22194A4442022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.3-16, Sheet 4, Drawing E-302-676, Rev. 15, Chemical and Volume Control ML22194A4142022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-36, Rev. 1, System Flow Diagram Aeb DG2 Room HVAC ML22194A4372022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-25, Sheet 1, Drawing D-302-851, Piping System Flow Diagram Industrial Cooling Water ML22194A4292022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.3-16, Sheet 1C, of Drawing E-302-673, Revision 20, Piping System Flow Diagram Chemical and Volume Control Design Engineering ML22194A4202022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.5-1, Sheet 1, Drawing D-302-231, Revision 40, Redacted ML22194A4052022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-12, Rev. 8, Building Service System Flow Diagram Turbine Building Ventilation System ML22194A4302022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.2-2, Rev. 6, Control Diagram Turbine Stop Valve ML22194A4462022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-31, Rev. 15, Building Service System Flow Diagram R.B.C.R.D.M. Shroud Vent System ML22194A4282022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.4-3, Main System System Steam Dump/Turbine Bypass (Ms) ML22194A4482022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-32, Rev. 22, System Flow Diagram CRDM Cooling Water ML22194A4092022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-33, Rev. 6, Building Service System Flow Diagram Technical Support Center and Main Control Board Ventilation System ML22194A4102022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-15, Rev. 12, Building Service System Flow Diagram Intermediate Building ESF SWGR Rooms and Speed Switch Rooms Cooling Systems ML22194A4042022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.5-7, Redacted ML22194A4002022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-1, Rev. 30, Control Room Normal and Emergency Air Handling System ML22194A4162022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 12.1-10, Redacted ML22194A4032022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-9, Rev. 23, Building Service System Flow Diagram Auxiliary Building Main Exhaust System ML22194A4532022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 12.1-11, Redacted ML22194A4012022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 12.1-3, Redacted ML22194A4182022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 11.3-4, Sheet 3, Piping System Flow Diagram Waste Processing ML22194A4272022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-4, Rev. 18, Control Building Control Access Exhaust ML22194A4112022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.3-16, Sheet 1A of Drawing E-302-671, Rev. 11, Piping System Flow Diagram Chemical and Volume Control Design Engineering ML22194A4252022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 11.3-4, Sheet 2, Piping System Flow Waste Processing ML22194A4452022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.3-14, Rev. 32, Piping System Flow Diagram Non-Nuclear Plant Drains ML22194A4492022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.3-6, Rev. 14, Sheet 1B, Chemical and Volume Control ML22194A4172022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.4-7A, System Flow Diagram Condensate Polishing ML22194A4392022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.4-10, System Flow Diagram Feedwater (Non-Nuclear) ML22194A4352022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-18, Rev. 20, System Flow Diagram Boron Recycle ML22194A4242022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.5-1, Sheet 2, Redacted ML22194A4422022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.3-16, Sheet 1A, System Flow Diagram Chemical and Volume Control ML22194A4132022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.5-1CB, Redacted ML22194A4212022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 12.1-11a, Redacted ML22194A4062022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.2-5, System Flow Diagram Generator Gas & Vents ML22194A4222022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-2, Rev. 22, Building Service System Flow Diagram Relay and Computer Room Cooling System ML22194A4542022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-24, Rev. 18, Piping System Flow Diagram Chilled Water - to Cooling Coils B ML22194A4342022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.3-3, Rev. 12, System Flow Diagram Main Reheat Steam (Non-Nuclear) ML22194A4402022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.4-22, Rev. 31, Chilled Water Pump & Chiller Area ML22194A4262022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.3-16, Sheet 3 of Drawing E-302-675, Revision 37, Piping System Flow Diagram Chemical and Volume Control Design Engineering ML22194A4412022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.4-14, Nuclear Blowdown Processing System Holdup Tank and Demineralizer ML22194A4522022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 12.1-7, Redacted ML22194A4232022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 10.3-1, Rev. 42, System Flow Diagram Main Steam (Nuclear) ML22194A4332022-06-27027 June 2022 2 to Updated Final Safety Analysis Report, Figure 9.5-1A, Redacted 2022-06-27 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML19261A144&oldid=1892937"