- Fiie Cy. U.S.Nuclear Regulatory Commission Mail and Records section Washington, D.C., 20555 Gentlemen:
consumers Power company Enclosed is a copy of the monthly operating data for the Palisades Plant for the month of April, 1975* JAM:db cc: J.G.Keppler, NRC R.L.Haueter R.B.Sewell Sincerely, James A. Meineke
.-*.I . -.
APPp.JDIX C I . (0 DOCKET NO. 50-255. UNIT Palisades DATE 5/2/75 COMPLETED BY DBollnow AVERAGE DAILY UNIT POWER LEVEL MONTH April 1975 A VERA GE DAILY PO\\iER LEVEL AVERAGE DAILY POWER LEVEL. DAY (.MWe-net)
DAY (MWe-nct) 1 0 17* 550 2 0 18 577 /./ / 3 4* 19 231 4 117. . 20. 268 5 162 21 216 6 131 22 560 0 .. *._._; 7 261 23 121 8 350 24 501. 9 388 25 266 10 446 26 531 11 389 27. 431 12 461 28 430 13 518 29 482 14 361 30 503 t5 . 501 31 16 529 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit powe:r level in ivt\Ve-net for each day in the reporting month. Compute to the nearest whole megawatt.
- These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily
- average power le\'cl exceeds the I 00% line (or the restricted power level* line). In such cases, the ';. (.o av:ragc daily unit power ontput sheet should be footnoted to explainthc apparent anomaly ..... . *L-.. .. --..
"" ' ' !
- ,.--.o .. ** .. ( *. .
APPENDIX D* UNIT _P_a_.:_1_J_
.. s_a_cl_e_s
__ _ DATE lfJB.y 2, 1975 616-*764..:8913* . COMPLETED BY D.Bollnow . DOCKET N0. __ 5_0_-_2_5_5
___ _ OPERATiNG ST A TUS I. REPORTING PERIOD: . 750401 THROUGH __
______ _ HOURS IN REPORTl'.'\G PERIOD: ___ 7'-l__,9'-----------.,--------------,7'7"1""r--
- 2. CURRENTLY AUTHORIZED POWER.LEVEL
('.\1Wth) 220Q_ MAX. DEPENDABLE CAPACITY (MWe-NET)
_O_t3_l_!*
__ 3. LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (M\Ve-NET):_--06:...3=0'-
1
- 4. REASONS FOR RESTRICTION (IF ANY): Power Restricted to 2100 .MWT due to low Pr:i.mary Coolant Flow caused by Steam Generator Plugging THIS CUMULATIVE
___________________
R_E_P_ORTING PE_R....:10:...:D'-----=-Y..:..R'-'T:...:O:....D=-A:..:c.
TE.o.;.,;...'
____ T...:O._D_A_T_E_
- 5. HOURS REACTOR WAS CRITICAL.
........... . 6. REACTOR RESERVE SHUTDOWN HOURS ...... . 7. HOURS GENERATOR ON LINE.* ...........**.
- 8. lTNJT RESER VE Sil UTDOWN HOURS ........***
- 9. . GROSS THER'.\1AL ENERGY GENERATED
('.\1WH) .*.*..*****.*********
IO.. GROSS ELECTRICAL ENERGY 11. 12. 13. 14. -GENERATED
('.\l\VH)
.................... . NET ELECTRICAL ENERGY GENERATED (MWH) ..*.*...***..*..*.*.***.**.*.
RL\CTOR AVAILABILITY FACTOR (l) .... -.... UNIT A \'AILABILITY FACTOR (2) ..**..*..*.*
l 1 NIT CAPACITY FACTOR (3) ............*..
UNIT FORCED OllTAGE RATE (4) ......**.***
709.5 ,. 0 657.8 0 967;.872 291,04o 266,769 98.7% 91.5% 54.2% 8.6°/o 739.8 0 657.8 0 . 967,872 291,04o 266,769 25. 7% 22.8% 13.5% 77.'?} lG,976.7 0 9.978.9 0 15,081,432 4,795,290 4,520,474 37 .. 6%* .
.* '26.2% -63.2°/o IS. 16. S!ll 1 TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH): 17. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ___________
_ IS. UNJTS IN TEST ST:\ TVS (PRIOR TO CO'.\i:l!ERCIAL OPERATION)
REPORT THE FOLLOWING: (I) REACTOR A\'AILABILITY FACTOR t:NIT AVAILABILITY FACTOR (3) UNIT CAPACITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE HOURS IN REPORTING PERIOD NET ELECTRICAL PO\\'FR GENERATED DATE LAST FORECAST DATE ACHIEVED MAX. DEPENDABLE CAPACITY (MWc*NET)
X HOURS IN RU'ORTIN<.;
l'E!UOD . l (4) t:NIT FORCEDOL'TAGE RATE . FORCED Ol:TAGE HOURS HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS . ., L ).16*D*l . . .
I t.,,.\ e : .
J . 0
...
............
,,..., ___ .,.. ...............
_, .... , .................
-..... ..
........ ,, ......
... ---.... *-> =-*"""* ,_ . ...., *.* _..._. -**
.... ........ N-m-.
....... f j UNIT SHUTDOWNS UNIT NAME Palisades l *1.* I
- DATE 5-2-75 l !' COMPLETED BY *n.Bollnow t REPORT MONTH April 1975 ' TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO. DATE S-SCHEDULED (HOURS) REASON (1) THE REACTOR (2) CORRECTIVg ACTIONS/COMMENTS 3 . 741104 F 3662.1 B 1 Completion of Steam Gen. Repair/Inspection
' 1 7504o6 F 2.6 A 1 Off-Line to Repair Leaking F.W.Heater Valve :.... 2 750422 F 14.l A 3 Trip due to E.H. oil Line failure on Turbine control system '->, (1) REASON (2) METHOD A*-EQUIPMENT FAILURE:(EXPLAIN) 1-MANUAL
E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE . . G-OPERATIONAL ERROR {EXPLAIN)
H-OTHER (EXPLAIN)
.. .. ! *
SUMMARY
- ' . Turbine balancing was performed on 1st and 2nd; then unit went up in power in accordance with a $team Generator flushing.program.
Plant.is running at 80% power with F.W. Heaters #1 and 2 out of service which is restrictive*
on power..