NRC Generic Letter 1981-025: Change in Implementing Schedule for Submission and Evaluation of Upgraded Emergency Plans
ML031080613
Person / Time
Site: Beaver Valley, Millstone, Mcguire, Nine Mile Point, Palo Verde, Perry, Fermi, Catawba, Harris, Wolf Creek, Saint Lucie, Watts Bar, Hope Creek, Grand Gulf, Sequoyah, Byron, Braidwood, Susquehanna, Summer, Columbia, Seabrook, Limerick, River Bend, Diablo Canyon, Callaway, Vogtle, Waterford, Clinton, South Texas, San Onofre, Comanche Peak, Midland, Bellefonte, LaSalle, 05000363, 05000000, Zimmer, Washington Public Power Supply System, Shoreham, Satsop, Bailly, Atlantic Nuclear Power Plant, Cherokee, Marble Hill, Hartsville, Phipps Bend, Yellow Creek
Issue date: 06/13/1981
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
References
GL-81-025, NUDOCS 8107100320
Download: ML031080613 (4)


Cf tLPA REG(,, F EUNITED STATES NUCLEAR REGULATORY

COMMISSION

WASHINGTON, D. C. 20555 TO ALL HOLDERS OF CONSTRUCTION

PERMITS Gentlemen:

SUBJECT: CHANGE IN IMPLEMENTING

SCHEDULE FOR SUBMISSION

AND EVALUATION

OF UPGRADED EMERGENCY

PLANS (Generic Letter No. 81-25)On October 31, 1980, you were provided a clarification letter (NUREG-0737)

regarding approved TMI Action.Plan items. The implementation schedule for item III.A.2 Emergency Preparedness in Enclosure

2, NUREG-0737, implies that upgraded emergency plans to meet the criteria of NUREG-0654, Revision 1,"Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants" must be submitted prior to fuel load authorization.

Full compliance with all elements of NUREG 0654 is unnecessary for this stage of startup operations.

Enclosed is a copy of page 2-11 of Enclosure

2, NUREG-0737, changing the implementing schedule to require upgraded emergency plans from prior to"fuel load" to prior to "full-power" authorization.

The requirements necessary for a "fuel load" authorization will be determined on a case-by-case basis.Sincerely, Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation Enclosure:

Page 2-11 of Enclosure

2, NUREG-0737 PDR ADOC3 0500027 5 F D

s -I V Il ENCLOSURE

2 (COtITInUED)

Clarifi- Implemen- Plant Require- Clarifi- Tech Carion tatlon Applica- ments cation Spec.Iten Title Description Schedule b 1ity Issued Issued Req. Remarks 1i.K.3 rFnal Recomfendations, c. New analyses In accordance All

  • Encl. 3 No B6O task force with review (Continued)

schedule 31. Plant-specific analysis 1/1/03f All

1/1/lIA OUR

  • Encl. 3 As with single failure required 45. Manual depressurization

1/81A OWR

  • Encl. 3 No 46. Michelson concerns fuel load DMR
  • Encl. 3 no III.A.I.I

Emergency Sho.t-term improvements Complete no preparedness, short term III.A.1.2 Upgrade emergency

1. Establish TSC OSC TOD All 9/27I79 11/9/79 No support facilities EOF (interim bas'sl TOD All 92/ 1/7 To 2. Design TOO T BO T OO T BO T hD 3. Modifications

100 TOo TOO TOD TOD 11I.A.2 Lsimrtqency

1. Upgrade aaergency plans full power All 8/19/11 NIREG- Yes preparedness to App E. 10 CFR 50 (K54 2. Meteorological data Full power All 6/26/80 NUREG- Yes 0654 111.U.1.1 Primary coolant Measure leak rates I Full power All 9/27/79 11/9/79 Yes outside establish program to Encl. 3 containment keep leakage ALARA 111.0.3.3 Inplant 12 radiation

1. Provide means to Fuel load All 9/27/79 11/9/79 Yes monitoring determine presence Encl. 3 of radio1odine

2. Modifications to 1/1/81 or All 9/27/79 11/9/79 Yes accurately measure prior to radlolodine icensing Encl. 3 111.0.3.4 Control-room

1. Identify and evaluate Full power All 6/26/80 End. 3 No habitability potential hazards 2. Schedule for Full power All 6/26/00 End. 3 o modifications

3. Modifications full power All 6/26/80 Encl. 3 Yes AFoisr vitonts before operating license Is issued or 4 months before date indicated.

  • hequirement formally issued by this letter.I I-n t0

PLANTS UNDER CONSTRUCTION

1.2.3.4.5.Cherokee 1/2/3 Beaver Valley 2 St. Lucie 2 Vogtle 1/2 River Bend 1/2 50-491, 50-412 50-389 50-424, 50-458, 492, 493 425 459 6.7.8.9.10.11.12.13.Forked River Nine Mile Point 2 Millstone

3 Bailly 2 Limerick 1/2 Hope Creek 1/2 Seabrook 1/2 50-363 50-410 50-423 50-367 50-352, 50-354, 50-443, 353 355 444 14.15.16.17.18.19.20.Hartsville

1/2/3/4 Phipps Bend 1/2 Yellow Creek 1/2 WPPSS 1/3/4/5 Harris 1/2/3/4 FNP 50-518, 50-553, 50-566, 50-460, 50-400, 50-437 519, 554 567 508, 401, 520, 521 513, 509 402, 403 PLANTS UNDER OL REVIEW 1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.16.17.18.19.20.21.22.23.24.25.26.27.28.29.Clinton 1/2 Byron 1/2 Braidwood

1/2 LaSalle 1/2 Midland 1/2 McGuire 2 So. Texas 1/2 Shoreham Waterford Grand Gulf 1/2 Diablo Canyon 1/2 Susquehana

1/2 St. Lucie 2 Summer 1 San Onofre 2/3 Bellefonte

1/2 Watts'Bar

1/2 Sequoyah 2 Comanche Peak 1/2 50-461/462

50-454, 455 50-456/457

50-373, 374 50-329,330

50- 370 50-498, 499 50-322 50-382 50-416/417

50-275, 323 50-387, 388 50-389 50-395 50-361, 362 50-438, 439 50-390, 391 50- 328 50-445, 446 WPPSS-2 Fermi 2 Ziimmer 1 Perry 1/2 Palo Verde Catawba Marble Hill Wolf Creek Callaway 50-397 50-341 50-358 50-440, 50-528, 50-413, 50-546, 50-4 82 50-483, 441 529, 530 414 547 486