Closeout for Review of Materials Reliability Program (Mrp): Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169)
ML071130113
Person / Time
Site: Nuclear Energy Institute, PROJ0669
Issue date: 04/26/2007
From: Jennifer Golder
NRC/NRR/ADRA/DPR
To: Jeffrey Riley
Nuclear Energy Institute
Mensah T
References
TAC MC9779
Download: ML071130113 (4)


Text

April 26, 2007Mr. James H. Riley, DirectorEngineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708

SUBJECT:

CLOSEOUT FOR REVIEW OF MATERIALS RELIABILITY PROGRAM (MRP): TECHNICAL BASIS FOR PREEMPTIVE WELD OVERLAYS FOR ALLOY 82/182 BUTT WELDS IN PRESSURIZED WATER REACTORS (MRP-169) (TAC NO. MC9779)

Dear Mr. Riley:

By letter dated September 7, 2005 (Agencywide Documents Access and Management System(ADAMS) Accession No. ML052520325), the Nuclear Energy Institute (NEI) submitted for U.S.

Nuclear Regulatory Commission (NRC) staff review Electric Power Research Institute (EPRI)

Topical Report (TR) MRP-169, "Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in PWRs [Pressurized Water Reactors]." By letter dated August 2, 2006 (ADAMS Accession No. ML061950468), the NRC issued an acceptance letter to NEI, which stated that the NRC would issue the request for additional information (RAI) by August 11, 2006, and the draft safety evaluation by January 15, 2007. The review schedule milestones were discussed and agreed upon in a telephone conference between you and the NRC staff on July 21, 2006. In a letter dated August 3, 2006 (ADAMS Accession No. ML062050337), the NRC staff issued athe RAI for TR MRP-169. In a telephone conversation on July 21, 2006, between you and the NRC staff, it was agreed upon that the RAI responses would be submitted to the NRC by September 29, 2006. The RAI response has not been received by the NRC. In addition, attempts by the NRC staff toobtain a revised milestone for the RAI response have been unsuccessful. As discussed with Mike Melton, Senior Project Manager, of your staff on April 19, 2007, all NRC staff efforts to support the review of TR MRP-169 have been discontinued and TAC MC9779 has been closed.Sincerely,/RA/Jennifer M. Golder, Acting Deputy DirectorDivision of Policy and Rulemaking Office of Nuclear Reactor RegulationProject Nos. 689 and 669 cc: See next page

ML062050337), the NRC staff issued athe RAI for TR MRP-169. In a telephone conversation on July 21, 2006, between you and the NRC staff, it was agreed upon that the RAI responses would be submitted to the NRC by September 29, 2006. The RAI response has not been received by the NRC. In addition, attempts by the NRC staff toobtain a revised milestone for the RAI response have been unsuccessful. As discussed with Mike Melton, Senior Project Manager, of your staff on April 19, 2007, all NRC staff efforts to support the review of TR MRP-169 have been discontinued and TAC MC9779 has been closed.Sincerely,/RA/Jennifer M. Golder, Acting Deputy DirectorDivision of Policy and Rulemaking Office of Nuclear Reactor RegulationProject Nos. 689 and 669 cc: See next pageDISTRIBUTION

PUBLICRidsNrrDprRidsNrrDprPspb PSPB Reading FileRidsNrrPMTMensahRidsNrrLADBaxleyRidsOgcMailCenterRidsAcrsAcnwMailCenterRidsNrrDciCpnb SRosenberg (Hardcopy)ADAMS ACCESSION NO.: ML071130113NRR-106OFFICEPSPB/PMPSPB/LADCI/CPNBPSPB/BCDPR/DDNAMETMensahDBaxleyTChanSRosenbergJGolder DATE04/25/0704/25/0704/19 /0704/25 /0704/26/07 Nuclear Energy InstituteProject No. 689Electric Power Research InstituteProject No. 669 cc:Mr. Anthony Pietrangelo, Vice President Regulatory Affairs Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 arp@nei.org Mr. Jack Roe, DirectorOperations Support Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jwr@nei.org Mr. Charles B. Brinkman Washington Operations ABB-Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 brinkmcb@westinghouse.com Mr. Gary L. Vine, Executive DirectorFederal and Industry Activities, Nuclear Sector EPRI 2000 L Street, NW, Suite 805 Washington, DC 20036 gvine@epri.com Mr. James Gresham, ManagerRegulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com

3/8/07Mr. Alexander Marion, Executive DirectorNuclear Operations & Engineering Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 am@nei.org Mr. Jay Thayer, Vice PresidentNuclear Operations Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jkt@nei.org Mr. John Butler, DirectorSafety-Focused Regulation Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jcb@nei.org Mr. James H. Riley, DirectorEngineering Nuclear Energy Institute 1776 I Street, NW Washington, DC 20006-3708 jhr@nei.org Mike Melton, Senior Project Manager1776 I Street, NW, Suite 400 Washington, DC 20006-3708 man@nei.org Mr. David J. ModeenVice President and Chief Nuclear Officer

EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 dmodeen@epri.com Mr. John Gaertner EPRI 1300 W.T. Harris Boulevard Charlotte, NC 28262-8550 jgaertner@epri.com Ms. Rosa Yang EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 ryang@epri.com Mr. Kenneth Huffman EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 khuffman@epri.com