ML080110665

From kanterella
Revision as of 17:10, 12 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Tech Spec Pages for Amendments 301 and 284 Regarding Operational Test of the Reactor Trip on Turbine Trip
ML080110665
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/11/2008
From:
NRC/NRR/ADRO/DORL/LPLIII-1
To:
tam P, NRR/ADRO/DORL, 415-1451
Shared Package
ML080110307 List:
References
TAC MD5613, TAC MD5614
Download: ML080110665 (2)


Text

rr"Z1S. instr~LIUI It-ai dLU-1 3.31.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.1.18 ------ ------NOTE--- ----------

Verification of setpoint is not required.Perform TADOT. Prior to exceeding the P-8 interlock whenever the unit has been in MODE 3, if not performed within the previous 31 days SR 3.3.1.19 NOTE Neutron detectors are excluded from response time testing.Verify RTS RESPONSE TIME is within limits. 24 months on a STAGGERED TEST BASIS Cook Nuclear Plant Unit I 3.3.1-10 Amendment No. 2-8-7-, 301 RTS Instrumentation 3.3.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.1.18--- -.--.-------

-.--NOTE -----Verification of setpoint is not required.Perform TADOT.Prior to exceeding the P-8 interlock whenever the unit has been in MODE 3, if not performed within the previous 31 days I-4 SR 3.3 1.19 Neutron detectors are excluded from response time testing.Verify RTS RESPONSE TIME is within limits.24 months on a STAGGERED TEST BASIS Cook Nuclear Plant Unit 2 3.3.1-10 Amendment No. 2-6-, 2,.4