Notification of Inspection (NRC Inspection Report 05000285/2013008) and Request for Information
ML12363A175
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/28/2012
From: Hay M
NRC/RGN-IV/DRP
To: Cortopassi L
Omaha Public Power District
Hay M
References
IR-13-008
Download: ML12363A175 (5)


See also: IR 05000285/2013008

Text

December 28, 2012

Lou Cortopassi, Vice President

and Chief Nuclear Officer

Omaha Public Power District

Fort Calhoun Station FC

-2-4 P.O. Box 550

Fort Calhoun, NE

68023-0550

SUBJECT: FORT CALHOUN STATION

- NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT

05000285/2013008)

AND REQUEST FOR INFORMATION

Dear Mr. Cortopassi:

On January 14, 2013, inspectors from the Nuclear Regulatory Commission's

(NRC) will perform a safety culture inspection at Fort Calhoun Station

, using applicable portions of NRC Inspection Procedure 95003, "Supplemental Inspection for Repetitive Degraded Cornerstone, Multiple Degraded Cornerstones, Multiple Yellow Inputs or One Red Input," to evaluate the independent safety culture assessment performed at Fort Calhoun. This inspection is a part of the MC 0350 oversight inspection activities. Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff. The inspection will focus on information gathered from site personnel about the safety culture primarily from focus groups. The inspection team will also conduct interviews and review documents related to activities

identified in the safety culture assessment and other policies and procedures related to site safety culture. In addition, a selection of observations of various meetings and activities will be observed by the inspection team.

The inspection will include 2

-weeks of onsite inspection by the team. The inspection will consist

of 3 safety culture assessors and 2 NRC inspectors. The current inspection schedule is as follows: Preparation Week: January 7, 2013

Onsite weeks:

January 14, 2013

February 11, 2013

In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents and resources needed for this inspection.

The first group (Section

A of the enclosure) identifies information to be provided prior to the onsite portion of the inspection to support inspector preparation. The second group (Section

B U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O N R E G I O N I V1600 EAST LAMAR BLVD

A R L I N G T O N , T E X A S 7 6 0 1 1-4511

L. Cortopassi

- 2 - of the enclosure) identifies information the inspectors will need upon arrival at the site. It is important that all of these documents are up

-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be

M r. Erick Matz

ke. If there are any questions about this inspection or the material requested, please contact the lead inspector , Greg Warnick, at (949

) 492-2641 (Greg.Warnick@nrc.gov) or Kamishan Martin at (301) 415

-3469 (Kamishan.Martin@nrc.gov

).

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44

U.S.C. 3501 et seq.).

Existing information collection

requirements were approved by the Office of Management and Budget, control number

3150-0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

In accordance with 10

CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Sincerely, /RA/ Michael Hay, Chief

Reactor Projects Branch F

Division of Reactor Projects

Docket: 50

-285 License: DPR

-40 Enclosure:

Safety Culture Assessment Evaluation Inspection Document Request

cc w/enclosure: Electronic Distribution for Fort Calhoun Station

L. Cortopassi

- 3 - Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov

) Acting Deputy Regional Administrator (Steven.Reynolds@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov

) Acting DRP

Deputy Director (Barry.Westreich@nrc.gov)

Acting DRS Director (Tom.Blount@nrc.gov)

Acting DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (John.Kirkland@nrc.gov)

Resident Inspector (Jacob.Wingebach@nrc.gov)

Branch Chief, DRP/F (Mike.Hay@nrc.gov) Senior Project Engineer, DRP/F (Rick.Deese@nrc.gov)

Project Engineer, DRP/F (Chris.Smith@nrc.gov

) Branch Chief, NRR/AHPB (Undine.Shoop@nrc.gov

) Safety Culture Assessor (Kamishan.Martin@nrc.gov)

Lead Inspector 0350 (Greg.Warnick@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov

) Public Affairs Officer (Lara.Uselding@nrc.gov)

Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

Project Manager (Lynnea.Wilkins@nrc.gov

) RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov

) Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO

(Cayetano.Santos@nrc.gov)

R:\_REACTORS\_FCS\2012\FCS 2012 RFI LTR.docx

SUNSI Rev Compl.

Yes No ADAMS Yes No Reviewer Initials

M CH Publicly Avail.

Yes No Sensitive Yes No Sens. Type Initials

M CH SRI:Songs C:DRP/F GWarnick MHay /RA/ /RA/ 12/28/12 12/28/12 OFFICIAL RECORD COPY

T=Telephone E=E-Mail F=Fax

- 1 - Enclosure SAFETY CULTURE SUPPLEMENTAL INSPECTION DOCUMENT REQUEST

From: Kamishan Martin

Human Factors Engineer, NRC NRR/AHPB

301-415-3469 To: Erick Matzke

Senior Nuclear Licensing Engineer, Fort Calhoun Station

402-533-6032

Subject: Information Request to Support January

2013 Evaluation of Independent Safety Culture Assessment Inspection (IP 95003)

A. The following information is requested in order to support inspection preparation activities starting

January 7, 2013.

Electronically: Accessible Files on Certrec website for: Kamishan Martin, Molly Keefe, Stephanie Morrow, Alma Allen and Carey Bickett.

Document Requests

Site Wide Organizational Charts of Fort Calhoun Management through the first line

Supervisor Positions for the following departments

o Operations, Maintenance, Security, Engineering, Health Physics, Chemistry, Training

List of licensed operators (SRO & RO) by crew (operating & staff)

List of individuals on the root cause evaluation team for the following findings:

o 2011 Red finding involving electrical breakers

o 2009 Yellow finding related to flooding strategies

o 2010 White finding related to electrical automatic shutdown components

Documents detailing Safety Conscious Work Environment policies at Fort Calhoun

Change Management Procedures site wide

Independent Safety Culture Assessment Report including data charts

Independent Safety Culture Assessment Methodology

Most recent safety culture self

-assessment report and related documents

Root Cause Evaluations for the red, white, and yellow findings

Documents related to restart checklist activities

B. The following information is requested in order to support the onsite inspection activities. Requested materials should be available to the inspection team, either electronically or hardcopy, upon site arrival on January 14, 2013.

Personnel Resource and Document Request

Make available individuals to participate in focus groups from the following

departments:

o Operations, Maintenance, Engineering, health physics, chemistry and

security

- 2 - Enclosure Individuals must be randomly selected for involvement in focus group

Make available managers from organization charts as selected by the NRC inspectors for individual interviews

Access to Employee Concerns Program Manager/Ombudsman pertinent files for evaluating SCWE and safety culture

Access to Human Resource Manager and pertinent employee files for evaluating SCWE and safety culture