Letter Sequence Request |
|---|
TAC:MF3128, Clarify Application of Setpoint Methodology for LSSS Functions, Surveillance Test Interval Extensions for Components of the Reactor Protection System - WCAP-15376-P, RPS and ESFAS Test Times and Completion Times - WCAP-14333 (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
|
MONTHYEARML13329A7172013-11-22022 November 2013 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) Project stage: Request ML14050A1202014-02-20020 February 2014 NRC Acceptance Review Meeting Slides on Sequoyah Nuclear Plant, Units 1 and 2, Improved Technical Specification Conversion Project stage: Meeting ML14071A1522014-03-13013 March 2014 Slide, ITS Project Electrical Systems Presentation March 13, 2014 Project stage: Request ML14162A2792014-07-0303 July 2014 03/25 and 04/03/2014 Summary of Conference Call and Public Meetings with the Tennessee Valley Authority Regarding Improved Technical Specifications Conversions for Sequoyah Nuclear Plant, Units 1 and 2 Project stage: Meeting ML14175B2862014-07-0303 July 2014 Summary of Meeting with Tennessee Valley Authority Regarding Improved Technical Specifications Conversions for Sequoyah Nuclear Plant, Units 1 and 2 Project stage: Meeting ML14223A6402014-08-22022 August 2014 8/5/2014, Summary of Meeting with Tennessee Valley Authority Regarding Improved Technical Specifications Conversion for Sequoyah Nuclear Plant, Units 1 and 2 Project stage: Meeting CNL-14-234, Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 12014-12-16016 December 2014 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 1 Project stage: Request ML15037A1732015-02-13013 February 2015 Summary of January 15, 2015, Meeting with Tennessee Valley Authority Regarding Improved Technical Specifications Conversion for Sequoyah Nuclear Plant, Units 1 and 2 Project stage: Meeting ML15205A4052015-07-24024 July 2015 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 9 Project stage: Request CNL-15-156, Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 9 of 92015-07-24024 July 2015 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 9 of 9 Project stage: Request CNL-15-163, Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Proposed License Conditions2015-08-0505 August 2015 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Proposed License Conditions Project stage: Request ML15254A5092015-08-11011 August 2015 Revised ITS Conversion Change Tables Project stage: Request CNL-15-188, Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Correction to ITS 3.3.7, Control Room Emergency Ventilation System (CREVS) Actuation Instrumentation2015-08-31031 August 2015 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Correction to ITS 3.3.7, Control Room Emergency Ventilation System (CREVS) Actuation Instrumentation Project stage: Request ML15258A5162015-09-30030 September 2015 Technical Specifications for NRC Appendix a to License No. DPR-79 Project stage: Request ML15258A5112015-09-30030 September 2015 Technical Specification for NRC Appendix a to License No. DPR-77 Project stage: Request ML15238B4602015-09-30030 September 2015 Issuance of Amendments for the Conversion to the Improved Technical Specifications with Beyond Scope Issues Project stage: Approval ML15238B6332015-09-30030 September 2015 Request for Publication in Biweekly Fr Notice of Issuance of Amendments to Renewed Facility Operating License Project stage: Approval ML15236A3512015-09-30030 September 2015 Improved Technical Specifications with Beyond Scope Issues License Amendment Request Safety Evaluations Project stage: Approval CNL-17-010, Submittal of Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (SQN-TS-17-06)2018-03-16016 March 2018 Submittal of Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (SQN-TS-17-06) Project stage: Request 2015-02-13
[Table View] |
Text
U.S. Nuclear Regulatory Commission CNL-15-163 Page2 August 5, 2015 The purpose of this letter is to request two new License Conditions for SQN, which are necessary for the transition from the Current Technical Specifications (CTS) to the ITS. These new License Conditions are associated with technical specification items relocated to other licensee controlled documents and the performance of new or revised surveillance items. A License Condition is proposed to address the schedule for relocating certain SQN CTS requirements to licensee-controlled documents, as approved by the NRC, as follows. Relocation of Certain Technical Specification Requirements License Amendment No. XXX authorizes the relocation of certain Technical Specifications previously included in Appendix A to other licensee-controlled documents.
Implementation of this amendment shall include relocation of the requirements to the specified documents, as described in Table R, Relocated Specifications and Removed Detail Changes, attached to the NRC staff's Safety Evaluation, which is enclosed in this amendment.
A License Condition is proposed to address the schedule for implementing new and revised Surveillance Requirements, as approved by the NRC, as follows. Schedule for New and Revised Surveillance Requirements (SRs) The schedule for performing SRs that are new or revised in Amendment No. XXX shall be as follows. (a) For SRs that are new in this amendment, the first performance is due at the end of the first Surveillance interval, which begins on the date of implementation of this amendment. (b) For SRs that existed prior to this amendment, whose intervals of performance are being reduced, the first reduced Surveillance interval begins upon completion of the first Surveillance performed after implementation of this amendment. (c) For SRs that existed prior to this amendment, whose intervals of performance are being extended, the first extended Surveillance interval begins upon completion of the last Surveillance performed prior to implementation of this amendment. (d) For SRs that existed prior to this amendment that have modified acceptance criteria, the first performance subject to the modified acceptance criteria is due at the end of the Surveillance interval that began on the date the Surveillance was last performed prior to the implementation of this amendment.
U.S. Nuclear Regulatory Commission CNL-15-163 Page 3 August 5, 2015 There are no new regulatory commitments associated with this submittal.
If there are any questions or if additional information is needed, please contact Mr. Tom Hess at 423-751-3487.
I declare under penalty of perjury that the foregoing is true and correct. Executed on this 5th day of August 2015 . .......___...._, 0 µ_ . Shea Vi e President, Nuclear Licensing cc: NRC Regional Administrator
-Region II NRC Senior Resident Inspector
-Sequoyah Nuclear Plant NRC Project Manager -Sequoyah Nuclear Plant