TAC:MF3128, Clarify Application of Setpoint Methodology for LSSS Functions, Surveillance Test Interval Extensions for Components of the Reactor Protection System - WCAP-15376-P, RPS and ESFAS Test Times and Completion Times - WCAP-14333 (Approved, Closed) TAC:MF3129, Clarify Application of Setpoint Methodology for LSSS Functions, Surveillance Test Interval Extensions for Components of the Reactor Protection System - WCAP-15376-P, RPS and ESFAS Test Times and Completion Times - WCAP-14333 (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
|
MONTHYEARML13329A7172013-11-22022 November 2013 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) Project stage: Request ML14050A1202014-02-20020 February 2014 NRC Acceptance Review Meeting Slides on Sequoyah Nuclear Plant, Units 1 and 2, Improved Technical Specification Conversion Project stage: Meeting ML14071A1522014-03-13013 March 2014 Slide, ITS Project Electrical Systems Presentation March 13, 2014 Project stage: Request ML14162A2792014-07-0303 July 2014 03/25 and 04/03/2014 Summary of Conference Call and Public Meetings with the Tennessee Valley Authority Regarding Improved Technical Specifications Conversions for Sequoyah Nuclear Plant, Units 1 and 2 Project stage: Meeting ML14175B2862014-07-0303 July 2014 Summary of Meeting with Tennessee Valley Authority Regarding Improved Technical Specifications Conversions for Sequoyah Nuclear Plant, Units 1 and 2 Project stage: Meeting ML14223A6402014-08-22022 August 2014 8/5/2014, Summary of Meeting with Tennessee Valley Authority Regarding Improved Technical Specifications Conversion for Sequoyah Nuclear Plant, Units 1 and 2 Project stage: Meeting CNL-14-234, Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 12014-12-16016 December 2014 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 1 Project stage: Request ML15037A1732015-02-13013 February 2015 Summary of January 15, 2015, Meeting with Tennessee Valley Authority Regarding Improved Technical Specifications Conversion for Sequoyah Nuclear Plant, Units 1 and 2 Project stage: Meeting ML15205A4052015-07-24024 July 2015 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 9 Project stage: Request CNL-15-156, Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 9 of 92015-07-24024 July 2015 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 9 of 9 Project stage: Request CNL-15-163, Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Proposed License Conditions2015-08-0505 August 2015 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Proposed License Conditions Project stage: Request ML15254A5092015-08-11011 August 2015 Revised ITS Conversion Change Tables Project stage: Request CNL-15-188, Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Correction to ITS 3.3.7, Control Room Emergency Ventilation System (CREVS) Actuation Instrumentation2015-08-31031 August 2015 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Correction to ITS 3.3.7, Control Room Emergency Ventilation System (CREVS) Actuation Instrumentation Project stage: Request ML15258A5162015-09-30030 September 2015 Technical Specifications for NRC Appendix a to License No. DPR-79 Project stage: Request ML15258A5112015-09-30030 September 2015 Technical Specification for NRC Appendix a to License No. DPR-77 Project stage: Request ML15238B4602015-09-30030 September 2015 Issuance of Amendments for the Conversion to the Improved Technical Specifications with Beyond Scope Issues Project stage: Approval ML15238B6332015-09-30030 September 2015 Request for Publication in Biweekly Fr Notice of Issuance of Amendments to Renewed Facility Operating License Project stage: Approval ML15236A3512015-09-30030 September 2015 Improved Technical Specifications with Beyond Scope Issues License Amendment Request Safety Evaluations Project stage: Approval CNL-17-010, Submittal of Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (SQN-TS-17-06)2018-03-16016 March 2018 Submittal of Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (SQN-TS-17-06) Project stage: Request 2015-02-13
[Table View] |
Text
September 30, 2015 MEMORANDUM TO: Biweekly Notice Coordinator FROM:
Andrew Hon, Project Manager /RA/
Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
REQUEST FOR PUBLICATION IN BIWEEKLY FR NOTICE - NOTICE OF ISSUANCE OF AMENDMENTS TO RENEWED FACILITY OPERATING LICENSE (TAC NOS. MF3128 and MF3129)
Tennessee Valley Authority, Docket Nos. 50-327 and 50-328, Sequoyah Nuclear Plant (SQN), Units 1 and 2, Hamilton County, Tennessee Date of amendment requests: November 22, 2013, as supplemented by letters dated December 16, 2014; June 19, 2015; July 24, 2015; August 5, 2015; and August 31, 2015.
Brief description of amendments: The amendments convert the current technical specifications to the improved technical specifications (ITSs) and relocate certain requirements to other licensee-controlled documents. The ITSs are based on NUREG-1431, Rev. 3.0, Standard Technical Specifications, Westinghouse Plants, Rev. 3.0; NRC Final Policy Statement on Technical Specification Improvements for Nuclear Power Reactors, dated July 22, 1993 (58 FR 39132); and 10 CFR 50.36, Technical Specifications. Technical Specification Task Force changes were also incorporated. The purpose of the conversion is to provide clearer and more readily understandable requirements in the technical specifications for SQN to ensure safe operation. In addition, the amendments include a number of issues that were considered beyond the scope of NUREG-1431.
Date of issuance: September 30, 2015.
Biweekly Notice Coordinator Effective date: As of its date of issuance and shall be implemented within 30 days of issuance.
Amendment Nos.: 334 - Unit 1 and 327 - Unit 2. A publicly-available version is in ADAMS under Accession No. ML15238B499; documents related to these amendments are listed in the Safety Evaluation (SE) enclosed with the amendments.
Facility Operating License Nos. DPR-77 and DPR-79. The amendments revised the TSs.
Date of initial notice in Federal Register: June 24, 2014 (79 FR 35807). The supplemental letters dated December 16, 2014, June 19, July 24, August 5, and August 31, 2015, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staffs original proposed no significant hazards consideration determination as published in the Federal Register.
The Commission's related evaluation of the amendments is contained in an SE dated September 30, 2015.
No significant hazards consideration comments received: No.