Response Letter Dated 04/11/2017 to Debbie Grinnell Regarding C10 Emails 03-2017
ML17096A412
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 04/11/2017
From: Fred Bower
Reactor Projects Branch 3
To: Grinnell D
C-10 Research & Education Foundation
References
Download: ML17096A412 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.

KING OF PRUSSIA, PA 19406

-2713 April 1 1, 2017 Ms. Debbie Grinnell Emeritus Research Director C-10 Research and Education Foundation, Inc.

44 Merrimac Street Newburyport, MA 01950

Dear Ms. Grinnell:

Ms. Angela Buford forwarded me your email to her dated March 1, 2017, and I am writing to acknowledge its receipt. You sent Ms. Buford a clarifying email later the same day. Your emails have been entered into the NRC's Agencywide Documents Access and Management System (ADAMS) as public ly available records (ML17069A049 1 and ML17069A064) at http://www.nrc.gov/reading

-rm/adams.html

. To begin a search for these documents, select "ADAMS Public Documents" and then select "Begin Web

-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at

1-800-397-4209, 301-415-4737, or by e

-mail to pdr.resource@nrc.gov. As Ms. Buford stated to you in a n email dated March 10, 2017 (ML17069A077), at this point, the agency has accept ed NextEra's license amendment requests (LAR) only for review by the staff. This means that the NRC considers the LAR to be acceptable for review upon the NRC staff's conclusion that the application for a license amendment reasonably appears to contain sufficient technical information, both in scope and depth, for the NRC staff to complete the detailed technical review and render, in an appropriate time frame, an independent assessment of the proposed action with regard to applicable regulatory requirements and the protection of public health, safety, and security.

More information on the NRC's acceptance review process can be found at:

https://www.nrc.gov/docs/ML0918/ML16144A521.pdf The NRC staff's technical review and processing of the license amendment is expected to take a considerable period of time as described in the acceptance letter dated October 12, 2016 (ML16265A440

). Specifically, the letter stated that NRC staff has estimated this licensing request will take about 2 ,000 hours0 days <br />0 weeks <br />0 months <br /> to complete and it further stated that the NRC staff expects to complete this review in 22 months, which is August 2018.

More information on the review and processing of LAR s can be found at: https://www.nrc.gov/docs/ML0918/ML16061A451.pdf. We are aware that the NRR Project Manager for Seabrook, Mr. Justin Poole, informed you and your organization (C-1 0) by an email dated February 7, 2017 (ML17069A039), that the comment period for the Seabrook

's alkali silica reaction (ASR) LAR was noticed in the Federal Register. We further understand that C

-10 submitted comments by the deadline and the comments have been entered into ADAMS as a public record (ML17081A015). The document located at ML16061A451 also provides guidance for addressing comments received

, from the public , in the safety evaluation report (SER) for the license amendment. As I previously

1 Designation in parentheses refers to an Agency

-wide Documents Access and Management System (ADAMS) accession number. Unless otherwise noted, documents referenced in this letter are publicly

-available using the accession number in ADAMS.

D. Grinnell 2 indicated to you in an email dated October 12, 2016 (ML16286A058), any questions regarding the LAR should be directed to Mr. Poole.

We would urge you and C

-10 to continue to review the long list of documents and information on our website page for ASR at Seabrook: https://www.nrc.gov/reactors/operating/ops

-experience/concrete

-degradation.html

. This webpage is frequently updated and includes every significant piece of correspondence on this subject issued since 2010.

I plan to file this response to you in ADAMS at ML17096A412 and make it publically available.

I trust that this is responsive to your questions.

Sincerely,

/RA/ Fred L. Bower III, Chief Reactor Projects Branch 3 Division of Reactor Projects

D. Grinnell 3 DISTRIBUTION: (via email):

[2016-SST-0 948] DDorman, RA DLew, DRP MScott, DRP DPelton, DRP RLorson, DRS JYerokun, DRS MGray, DRS WCook, DRS FBower, DRP RBarkley, DRP PCataldo, DRP, SRI PMeier, DRP, RI JBowen, RI, OEDO DScrenci, PAO NSheehan, PAO JGreives, SLO DTifft, SLO ABuford, NRR JPoole, NRR BLehman, NRR JDanna, NRR BWittick, NRR LJames, NRR RidsNrrPMSeabrookResource RidsNRRDorlLp1Resource Natalie@C-10.org Debbie@C-10.org Info@C-10.org DOCUMENT NAME: G:\DRP\BRANCH3\Action Items

\2017\2017-SST-0948-Grinnell Emails Response_2017

\Resp Ltr to DGrinnell_C10_emails_03

-2017_final revision.docx ADAMS Accession No.

ML17096A412 (document)

SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP NRR/DORL RI/DRP NAME RBarkley JPoole/RB FBower DATE 4/6/1 7 4/6/17 4/11/17 OFFICIAL RECORD CO PY