ML19148A680

From kanterella
Revision as of 23:35, 13 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Final Burden Spreadsheet for 10 CFR Part 51 OMB Renewal
ML19148A680
Person / Time
Issue date: 05/30/2019
From:
NRC/OCIO
To:
References
Download: ML19148A680 (2)


Text

RequirementDescriptionRespondentsPerYearResponses Per RespondentTotalResponsesBurden Per ResponseTotal BurdenAnnual Cost at $275/hr51.6Request for exemptions2.6 12.6 513$3,57551.16(b)Request to withhold proprietary information from disclosure 0 1 010 0$051.41Establishes NRC's general authority to require environmental information from applicants, as required (License amendments) 5 1 520100$27,50051.45Establishes general requirements of applicant's Environmental Reports (ER)51.49, 51.50, 51.51, 51.52, and 51.55ER for Combined License0.3 10.310,3003,090$849,75051.49, 51.50, 51.51, 51.52, and 51.55ER for Construction Permit 0 1 010,400 0$051.49, 51.50, 51.51, 51.52, and 51.55ER for Amended Design Certification 0 1 060 0$051.49, 51.50, 51.51, 51.52, and 51.55ER for Early Site Permit0.3 10.311,4003,420$940,50051.49, 51.50, 51.51, 51.52, and 51.55ER for Design Certification1.3 11.36078$21,45051.53Post-construction ER for License renewals1.3 11.312,30015,990$4,397,25051.53Post-construction ER for Research and Test Reactors0.3 10.36018$4,95051.54Specific requirements for applicant's ER for Manufacturing License 0 1 0 0 0$051.58(States the number of copies required)51.60, 51.61, and 51.62Specificrequirementsforapplicant'sER-MaterialsLicense4.6 14.61,6687,673$2,110,07551.66(a) and (b)(States the number of copies to be filed)51.68Specific requirements for petitioner's ER-Rulemaking 1 1 18080$22,000TOTAL16.730,462.0

$8,377,050Burden included under the specific ER reporting requirementsBurden included under the specific ER reporting requirementsBurden included under the specific ER reporting requirementsTable 110 CFR Part 51 Annual Reporting Burden SubmissionsPerYearNRC Staff Review Time Per SubmissionTotal Review TimePer YearAnnual Cost at $275/hrRequest for exemptions2.6 513.0$3,575Request to withhold proprietary information from disclosure 0 100.0$0License amendments 520.00100.0$27,500ER for Combined License0.34,000.001,200.0$330,000ER for Construction Permit 06,240.000.0$0ER for Amended Design Certification 0100.000.0$0ER for Early Site Permit0.37,300.002,190.0$602,250ER for Design Certification1.3200.00260.0$71,500Post-construction ER for License renewals1.34,100.005,330.0$1,465,750Post-construction ER for Research and Test Reactors0.360.0018.0$4,950Specific requirements for applicant's ER for Manufacturing License 04,000.000.0$0Specific requirements for petitioner's ER-Rulemaking 180.0080.0$22,000TOTAL32,632.6

$8,973,965$6,446,440Table 2Annual Costs to the Federal GovernmentSpecificrequirementsforapplicant'sER-MaterialsLicense4.65,096.0023,441.6