ML21341B435

From kanterella
Jump to navigation Jump to search
OMB 3150-0021, Draft Burden Spreadsheet for 10 CFR Part 51 Information Collection Renewal
ML21341B435
Person / Time
Issue date: 01/10/2022
From:
NRC/OCIO, NRC/OGC
To:
References
Download: ML21341B435 (2)


Text

10 CFR Part 51 Annual Reporting Burden Respondents Responses Total Burden Per Annual Cost at Requirement Description Per Per Total Burden Responses Response $288/hr Year Respondent 51.6 Request for exemptions 2.6 1 2.6 5 13 $3,744 Request to withhold 51.16(b) proprietary information 0 1 0 10 0 $0 from disclosure Establishes NRCs general authority to require environmental 51.41 5 1 5 20 100 $28,800 information from applicants, as required (License amendments)

Establishes general requirements of 51.45 applicants Burden included under the specific ER reporting requirements Environmental Reports (ER) 51.49, 51.50, 51.51, 51.52, and ER for Combined 0 1 0 28,000 0 $0 51.55 License 51.49, 51.50, 51.51, 51.52, and ER for Construction 0 1 0 20,000 0 $0 51.55 Permit 51.49, 51.50, 51.51, 51.52, and ER for Amended Design 0 1 0 60 0 $0 51.55 Certification 51.49, 51.50, 51.51, 51.52, and ER for Early Site Permit 0 1 0 25,000 0 $0 51.55 ER for Design 51.55 0.3 1 0.3 1,000 300 $86,400 Certification ER for Advanced Nuclear Reactor (all NEW- 51.49, 51.50, 51.51, 51.52 2.00 1.0 2 15,000 30,000 $8,640,000 application types) under current regulations ER for new non-power production or utilization NEW-51.49, and 51.50. 1 1 1 600 600 $172,800 facility (NPUF) [CP or COL]

Post-construction ER for 51.53 1 1 1 12,300 12,300 $3,542,400 License renewals Post-construction ER for 51.53 Research and Test 1 1 1 60 60 $17,280 Reactors Specific requirements 51.54 for applicants ER for 0 1 0 4000 0 $0 Manufacturing License (States the number of 51.58 Burden included under the specific ER reporting requirements copies required)

Specific requirements 51.60, 51.61, and 51.62 for applicants ER- 5 1 5 5,096 25,480 $7,338,240 Materials License (States the number of 51.66(a) and (b) Burden included under the specific ER reporting requirements copies to be filed)

Specific requirements 51.68 for petitioners ER- 1 1 1 80 80 $23,040 Rulemaking TOTAL 18.9 18.9 68,933.0 $19,852,704

Table 2 Annual Costs to the Federal Government Submissions NRC Staff Total Review Time Per Review Time Per Annual Cost at $288/hr Per Year Year Submission Request for exemptions 2.6 5 13.0 $3,744 Request to withhold proprietary information 0.0 10 0.0 $0 from disclosure License amendments 5.0 20.00 100.0 $28,800 ER for Combined 0.0 28,000.00 0.0 $0 License ER for Construction 0.0 20,000.00 0.0 $0 Permit ER for Amended Design 0.0 100.00 0.0 $0 Certification ER for Early Site Permit 0.0 25,000.00 0.0 $0 ER for Design 0.3 1,000.00 300.0 $86,400 Certification ER for Advanced Nuclear Reactor (all 2.0 15,000.00 30,000.0 $8,640,000 application types) under current regulations ER for new non-power production or utilization 1.0 3,500.00 3,500 $1,008,000 facility (NPUF) [CP or COL]

Post-construction ER for 1.0 5,600.0 5,600 $1,612,800 License renewals Post-construction ER for Research and Test 1.0 100.0 100 $28,800 Reactors Specific requirements for applicants ER for 0.0 4,000.00 0.0 $0 Manufacturing License Specific requirements for applicants ER-Materials 5.0 5,096.00 25,480.0 $7,338,240 License Specific requirements for petitioners ER- 1.0 80.00 80.0 $23,040 Rulemaking TOTAL 18.9 65,173.0 $18,769,824