West Lpr 2019 - NRC Slides Rev 1
ML19134A035
Person / Time
Issue date: 05/07/2019
From:
Division of Reactor Safety II
To:
References
Download: ML19134A035 (17)


Text

Performance Reviewhttps://www.nrc.gov/about

-nrc/contactus.htmlWestinghouse Electric CompanyColumbia Fuel Fabrication Facility (CFFF)South Carolina State Museum,Columbia, SCMay 7, 20196:00 PM 1 NRC's Fuel Cycle Oversight ComponentsInspectionsInvestigationsAllegationsIncident ResponseEnforcementPerformance Assessmenthttps://www.nrc.gov/about

-nrc/contactus.html 2

Licensee Performance Review Processhttps://www.nrc.gov/about

-nrc/contactus.htmlPlant EventsSafety Significance AssessmentReactive InspectionsInspection Follow

-upEmergent Performance or Generic Safety IssuesAssessmentInspection Program AdjustmentInputsNRC ReviewResultsNRC ResponseOther NRC Actions*Enforcement Actions*Previous Performance

  • Safety Significance
  • Performance Trends
  • Cross Cutting Issues
  • Corrective ActionsNo Performance Issues*Core Insp. Program
  • Inform the PublicArea Needing Improvement (ANI)*Insp. Program Changes
  • LPR Frequency
  • Inform the PublicOrLPR = Licensee Performance ReviewPerformance Areas 3

https://www.nrc.gov/about

-nrc/contactus.htmlPerformance AreasSafeguardsOther AreasSafety OperationsFacility SupportRadiological Controls 4 Licensee Performance Areas

  • Safety Controls
  • Supporting Safety ProgramsPlant Operations
  • Criticality Controls
  • Program Oversight
  • Criticality Incident ResponseNuclear Criticality Safety*Prevention, Detection, & Mitigation
  • Supporting Fire Safety ProgramsFire Protectionhttps://www.nrc.gov/about

-nrc/contactus.htmlSafety Operations 5

Licensee Performance Areas

  • Members of the Public
  • Plant WorkersRadiationProtection
  • Program Implementation
  • Liquid and Gaseous EffluentsEnvironmentalProtection
  • Processing, Handling, Storage & Transportation of WasteWaste Management
  • Receipt, Packaging & Delivery of Radioactive MaterialsTransportationhttps://www.nrc.gov/about

-nrc/contactus.htmlRadiological Controls 6

  • Safety Controls
  • Supporting Program ElementsMaintenance and Surveillance
  • Emergency Plan Implementation
  • Configuration Management Program
  • Request for NRC ApprovalPermanent Plant Modifications
  • Effective Organization and Controls Management Organization
  • Quality of Training Program
  • Frequency of Refresher TrainingOperator TrainingLicensee Performance Areashttps://www.nrc.gov/about

-nrc/contactus.htmlFacility Support 7

Licensee Performance AreasMaterial Control and AccountingPhysical Protection of SNMClassified Material and Information Securityhttps://www.nrc.gov/about

-nrc/contactus.htmlSafeguardsOther AreasSpecial IssuesLicensing SubmittalsConfirmatory Action Letters or Orders 8

NRC On-siteCore Inspection Efforthttps://www.nrc.gov/about

-nrc/contactus.htmlCategory III Fuel FacilityNote: The hours above represent the estimated effort allocated to on-site routine inspections every year.Safety Operations (152-214 hours)Plant Operations (60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br />)Criticality Safety (64 hours7.407407e-4 days <br />0.0178 hours <br />1.058201e-4 weeks <br />2.4352e-5 months <br />)Fire Protection (32-90 hours)Radiological Controls (32-160 hours)Radiation Protection (0-64 hours) Environmental Protection (32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br />)Waste Management (0-32 hours)Transportation (0-32 hours)(54-96 hours)Material Control & Accounting (54-72 hours)Physical Protection (0-24 hours)Facility Support (94-238 hours)Maintenance/ Surveillance (30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />) Emergency Preparedness (32-80 hours)Plant Modifications (32-128 hours)Safeguards 9

LPR Resultshttps://www.nrc.gov/about

-nrc/contactus.htmlAssessment PeriodJanuary 1, 2018

-December 31, 2018 10 https://www.nrc.gov/about

-nrc/contactus.html2018 Inspection Summary 5Core Team Inspections 1ANI Inspection 1Safety Culture Inspection 11Modules 13Inspectors

~ 630 Hours 11 Areas Needing Improvement (ANIs)https://www.nrc.gov/about

-nrc/contactus.html

  • In 2017, an ANI was identified in Safety Operations, due to a safety significant issue involving the S

-1030 scrubber.

  • The identified supplemental inspection activities associated with the ANI were completed in 2018, however, the ANI will remain open and the assessment period will remain at a 12

-month periodicity until the actions specified in the CO have been completed. CO V.2, CO V.3(3), CO V.5, and CO V.10.b remain open

-nrc/contactus.htmlSAFETY OPERATIONSThe core inspection effort will be implemented with the exception of the inspection effort required for CO item closure.This effort is estimated to be an additional 120-150 hours, including both on

-site and in-office review.RADIOLOGICAL CONTROLSMaintain core inspection programSAFEGUARDSMaintain core inspection programFACILITY SUPPORTMaintain core inspection programRecommended NRC Inspection Effort for Current Assessment Period (2019) 13 Westinghouse Remarkshttps://www.nrc.gov/about

-nrc/contactus.html 14 Informal Question and AnswerSession between the NRC and the Publichttps://www.nrc.gov/about

-nrc/contactus.html 15 https://www.nrc.gov/about

-nrc/contactus.htmlFeedback Options

  • Link on NRC Public Meeting Schedule website
  • Email directly to:
  • thomas.vukovinsky@nrc.gov
  • katherine.mccurry@nrc.gov 16 List of Publicly Available Documentshttps://www.nrc.gov/about

-nrc/contactus.html

  • NRC Program Adjustment Letter

-ML16355A078

  • 2018 License Performance Review report 2018

-001 -ML18064A119

  • 2018 NRC Public Meeting Presentation Slides

-ML18038A717

  • 2018 Westinghouse Public Meeting Presentation Slides

-ML18038A703

  • Augmented Inspection Team report 2016

-007 -ML16301A001

  • Enforcement actions report 2017

-007 -ML17058A448

  • Confirmatory Action Letter (CAL)

-ML16224B082

  • Confirmatory Order (CO)

-ML17221A103

  • ANI supplemental report 2017

-009 -ML17356A091

  • ANI supplemental report 2018

-006 -ML18089A060

  • 2018 CO status update public meeting

-ML18039A001

  • 2019 LPR letter

-ML19060A201 17