2012 LaSalle County Station Initial License Examination Proposed in Plant JPMs
ML12289A213
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 10/22/2012
From: McNeil D R
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
References
Download: ML12289A213 (27)


Text

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Place a Standby Battery Charger in Service JPM Number:

P-DC-02 Revision Number:

0 2 Date: 0 8/31/20 1 2 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date P-DC-02 Rev. 0 2 Page 2 of 8 SRRS: 3D.105 (when utilized for operator initial or continuing training)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in

-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev: Procedure Rev: Procedure Rev: ________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date P-DC-02 Rev. 0 2 Page 3 of 8 SRRS: 3D.105 (when utilized for operator initial or continuing training)

Revision Record (Summary)

1. Revision 00, New JPM 2. Revision 0 1, Added Initiating Cue to the Examinee's initial conditions. Updated to revision 7 of LOA

-DC-201. 3. Revision 02, Updated to current Procedures and Template for ILT 11

-1 NRC Exam.

P-DC-02 Rev. 0 2 Page 4 of 8 SRRS: 3D.105 (when utilized for operator initial or continuing training)

INITIAL CONDITIONS

1. A fire has occurred in the operating Unit 2 Division 2 125 VDC Battery Charger 2BA.
2. The Fire Brigade has extinguished the fire.
3. Battery Charger 2BA has been removed from service.
4. No damage has occurred to MCC

-236X-3 or DC Bus 2B[2DC15E].

5. The AC feed to 2BA battery charger is open and removed from service. (236X

-3, B5) 6. All C/O for the 2BB Unit 2 Division 2 125 VDC Battery Charger have been lifted.

7. All levels of the Auxiliary Building are open for personnel access.
8. You are an extra NSO.
9. You have a plant radio.

INITIATING CUE The Unit 2 NSO directs you to place the standby Unit 2 Division 2 125 VDC Battery Charger 2BB in service IAW LOA

-DC-201 starting at Section B.1 step 17.

Contact the Unit 2 NSO when Battery Charger 2BB float voltage is acceptable.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

P-DC-02 Rev. 0 2 Page 5 of 8 SRRS: 3D.105 (when utilized for operator initial or continuing training)

JPM Start Time:

(LOA-DC-201) STEP ELEMENT 1 SAT UNSAT Comment Number NOTE: The procedure states, steps 1 and 2 must 1. be done IN ORDER LISTED.

(B.1.17) At Battery Charger 2BB, LOCALLY OPEN the DC Output Breaker.

The Examinee verifies the DC Output Breaker on Battery Charger 2BB is open. (off)

____ ____ ____ CUE: The breaker is in the position you describe.

2. (B.1.17) At Battery Charger 2BB, LOCALLY OPEN the AC Input Breaker.

The Examinee verifies the AC Input Breaker on Battery Charger 2BB is open. (off)

____ ____ ____ CUE: The breaker is in the position you describe.

  • 3. (B.1.18) At MCC-236X-3, LOCALLY CLOSE AC Feed Breaker A6 for the 2BB Battery Charger.

The Examinee simulates closing the A6 Breaker on MCC-236X-3. ____ ____ ____ CUE: The breaker is in the position you describe.

NOTE: The Examinee may verify breaker 2B[2DC15E], 2D (DC Feed Breaker) for Battery Charger 2BA is open. If this occurs, inform the Examinee that breaker 2D is open. *4. (B.1.19) At DC Bus 2B[2DC15E],

LOCALLY CLOSE DC Feed Breaker 2A for the 2BB Battery Charger.

The Examinee simulates closing the 2A Breaker on 2B[2DC15E].

____ ____ ____ CUE: The breaker is in the position you describe.

NOTE: Steps 5, 6, and 7 are performed locally at Battery Charger 2BB and must*5. be done IN ORDER LISTED.

(B.1.20) CLOSE the AC Input Breaker. The Examinee simulates closing the AC Input Breaker on Div 2 Charger 2BB

____ ____ ____ CUE: The breaker is in the position you describe.

P-DC-02 Rev. 0 2 Page 6 of 8 SRRS: 3D.105 (when utilized for operator initial or continuing training)

(LOA-DC-201) STEP ELEMENT 1 SAT UNSAT Comment Number *6. (B.1.20) DEPRESS the pushbutton and VERIFY FLOAT light energized.

The Examinee depresses the pushbutton and verifies Float

-light energized on Div 2 Charger 2BB

____ ____ ____ CUE: The green light is lit.

  • 7. (B.1.20) CLOSE DC Output Breaker.

The Examinee simulates closing the DC Output Breaker on Div 2 Charger 2BB ____ ____ ____ CUE: The breaker is in the position you describe.

CUE: Battery Charger Float voltage has been determined acceptable by another E O. The JPM is complete when the Unit 2 NSO is notified that Battery Charger Float Voltage is acceptable.

JPM Stop Time:

P-DC-02 Rev. 0 2 Page 7 of 8 JPM

SUMMARY

Operator's Name

Job Title: EO RO SRO FS STA/IA SRO Cert JPM Title: JPM Number: P lace a Standby Battery Charger in Service P-DC-02 Revision Number:

Task Number and Title:

02 6.008 K/A Number and Importance:Startup or shutdown a battery charger Suggested Testing Environment:

263000 (DC Electrical Systems) 2.1.30 4.4/4.0 Ability to locate and operate components, including local controls Alternate Path:

Yes No SRO Only: Yes No Time Critical:

Yes No In-Plant Reference(s):

LOA-DC-201 Unit 2 DC Power System Failure , Rev 14 Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete:

20EVALUATION

SUMMARY

minutes Actual Time Used:

minutes Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments: Evaluator's Name

(Print) Evaluator's Signature
Date:

Page 8 of 8 INITIAL CONDITIONS

1. A fire has occurred in the operating Unit 2 Division 2 125 VDC Battery Charger 2BA.
2. The Fire Brigade has extinguished the fire.
3. Battery Charger 2BA has been removed from service.
4. No damage has occurred to MCC

-236X-3 or DC Bus 2B[2DC15E].

5. The AC feed to 2BA battery charger is open and removed from service. (236X

-3, B5) 6. All C/O for the 2BB Unit 2 Division 2 125 VDC Battery Charger have been lifted.

7. All levels of the Auxiliary Building are open for personnel access.
8. You are an extra NSO.
9. You have a plant radio.

INITIATING CUE The Unit 2 NSO directs you to place the standby Unit 2 Division 2 125 VDC Battery Charger 2BB in service IAW LOA

-DC-201 starting at Section B.1 step 17.

Contact the Unit 2 NSO when Battery Charger 2BB float voltage is acceptable.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Local Emergency Start of 1C VP Chiller JPM Number:

P-VP-03 Revision Number: 12 Date: 0 8/31/20 1 2 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date P-VP-03 Rev. 12 Page 2 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in

-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev: Procedure Rev: Procedure Rev: ________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date P-VP-03 Rev. 12 Page 3 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)

Revision Record (Summary)

1. Revision 07, Reformatted and minor editorial changes.
2. Revision 08, Revised task numbers to reflect current task numbers Revised K/A numbers to reflect NUREG 1021 Rev 8 Revised format to meet NTAFT JLOR03 Rev 2 Revised to reflect Rev 6 of LGA

-VP-01 Made JPM specific to Unit 1.

Incorporated comments from TR 98

-2238 3. Revision 09, Minor corrections. Changed estimated time to complete to 10 minutes based on validation. 4. Revision 10, Changed procedure from LGA

-VP-01 to LOP-VP-02. Changed the task based on a new task in the operating matrix. Changed estimate completion time based on year 2000 data.

5. Revision 11, Added the initiating cue to the examinee's initial conditions. 6. Revision 12, Updated to current procedures and templates for ILT 11

-1 NRC Exam

P-VP-03 Rev. 12 Page 4 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)

Materials 1. The following material is required to be provided to examinee:

a. One copy of LOP

-VP-02 (after demonstrating knowledge of location of controlled copy)

b. One laser pointer

P-VP-03 Rev. 12 Page 5 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)

INITIAL CONDITIONS You are an extra NSO.

Unit scrammed due to high drywell pressure.

Drywell temperature is 141°F and increasing at approximately 1°F/minute.

LGA-03 has been entered.

LGA-VP-01 is in progress and completed up to and including Step C.9.b.

1C (2C) VP Chiller had been running prior to the scram on the 1A (2A) VP loop.

The SAT is supplying all AC buses.

All support systems are operating as expected.

Radiological conditions are at or below normal levels.

You have a plant radio.

INITIATING CUE The Unit 1 (2) NSO has directed you to perform an emergency restart 1C (2C) VP Chiller IAW LOP-VP-02. Inform the Unit NSO when 1C (2C) VP Chiller is restarted.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

P-VP-03 Rev. 12 Page 6 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)

JPM Start Time:

STEP (LOP-VP-02) ELEMENT SAT STANDARD UNSAT Comme nt 1. Obtain copy of LOP

-VP-02 Examinee identifies where copy of LOP

-VP-02 can be obtained. ___ ___ ___ CUE After examinee identifies where copy of LOP

-VP-02 can be obtained, provide examinee with copy of LOP

-VP-02. Note The following steps should be performed at 1C (2C) VP Chiller Unit, 1(2)VP01CC at PRIM. CNMT. WATER CHILLER 1VP14S (2VP14S) (U1 AB 786' L-19) (U2 AB 786' L

-19). *2. (E.2.1) DEPRESS RESET push button Examinee depresses the RESET pushbutton.

___ ___ ____ CUE The button you identified has been depressed.

3. (E.2.1) VERIFY no alarms except COMPRESSOR LOW OIL DIFFERENTIAL PRESSURE alarm. Examinee verifies that all alarms except COMPR. LOW OIL DIFFRNT'L PRESS. are clear. ___ ___ ____ CUE Alarm lights are all OFF except for COMPR. LOW OIL DIFFRNT'L PRESS.
4. (E.2.2) VERIFY Chiller Panel TROUBLE alarm power switch in ON position.

Examinee verifies that the Chiller Panel Trouble Alarm power switch in ON.

___ ___ ____ CUE The switch you have identified is in the ON position.

5. (E.2.3) Notify the NSO of pending chiller start.

Examinee notifies the Unit 1 (2) NSO of the pending start of 1 (2) VP01CC, C VP Chiller. ___ ___ ____ CUE As Unit 1 NSO, acknowledge the pending start of 1 (2) VP01CC, C VP Chiller. *6. (E.2.4) DEPRESS START pushbutton.

Examinee depresses START pushbutton.

___ ___ ____ CUE The START pushbutton has been depressed.

P-VP-03 Rev. 12 Page 7 of 9 SRRS: 3D.105 (when utilized for operator initial or continuing training)

STEP (LOP-VP-02) ELEMENT SAT STANDARD UNSAT Comme nt 7. (E.2.5.1) Verify start sequence as follows: Oil pump starts and COMPR OIL PUMP ON indicating light (amber) energized COMPR OIL PUMP ON indicating light verified energized ___ ___ ___ CUE The oil pump started and the COMPR OIL PUMP ON amber indicating light is energized. 8. (E.2.5.2) Verify start sequence as follows: Chiller Compressor Motor 1 (2) VP 14C starts. Chiller Compressor Motor 1 (2) VP 14 C verified running

___ ___ ___ CUE The 1 (2) VP1 4C Compressor Motor Ammeter indication spikes high and then indicates approximately 400 amps.

9. (E.2.5.2) Verify start sequence as follows: COMPR MOTOR ON indicating light (amber) is energized COMPR MOTOR ON indicating light verified energized ___ ___ ___ CUE The COMPR MOTOR ON amber indicating light is energized.

Note If the Examinee takes action to verify operating parameters per LOP

-VP-02, inform the examinee that operating parameters are per procedure.

10. NOTIFY the Unit 1 (2) NSO that the 1C (2C) VP Chiller has been restarted.

Examinee notifies the Unit 1 (2) NSO that the 1C (2C) VP Chiller has been restarted.

___ ___ ___ JPM Stop Time:

P-VP-03 Rev. 12 Page 8 of 9 JPM

SUMMARY

Operator's Name

Job Title: EO RO SRO FS STA/IA SRO Cert JPM Title:

JPM Number:

Local start of 1C VP Chiller P-VP-03 Revision Number:

Task Number and Title:

12 K/A Number and Importance: 96.006 Given a tripped PCCW chiller, perform an emergency start of that chiller. 295028 (High Drywell Temperature) EA1.03 3.9/3.9 Suggested Testing Environment:

Ability to operate and/or monitor the following as they apply to HIGH DRYWELL TEMPERATURE: Drywell Cooling System Alternate Path:

Yes No SRO Only: Yes No Time Critical:

Yes No In-Plant Reference(s):

LOP-VP-02 Startup Operatio n and shutdown of Primary Containment Chilled Water and Ventilation system, Rev 41 Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete:

11 EVALUATION

SUMMARY

minutes Actual Time Used:

minutes Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name

(Print) Evaluator's Signature
Date:

Page 9 of 9 INITIAL CONDITIONS You are an extra NSO.

Unit scrammed due to high drywell pressure.

Drywell temperature is 141°F and increasing at approximately 1°F/minute.

LGA-03 has been entered.

LGA-VP-01 is in progress and completed up to and including Step C.9.b.

1C (2C) VP Chiller had been running prior to the scram on the 1A (2A) VP loop.

The SAT is supplying all AC buses.

All support systems are operating as expected.

Radiological conditions are at or below normal levels.

You have a plant radio.

INITIATING CUE The Unit 1 (2) NSO has directed you to perform an emergency restart 1C (2C) VP Chiller IAW LOP-VP-02. Inform the Unit NSO when 1C (2C) VP Chiller is restarted.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Lineup a Fire Hose To 2A TDRFP for Injection Into The RPV JPM Number:

P-FP-04 Revision Number:

0 0 Date: 0 8/31/20 1 2 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date P-FP-04 Rev. 00 Page 2 of 10 SRRS: 3D.105 (when utilized for operator initial or continuing training)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in

-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev: Procedure Rev: Procedure Rev: ________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date belo w: SME / Instructor Date SME / Instructor Date SME / Instructor Date P-FP-04 Rev. 00 Page 3 of 10 SRRS: 3D.105 (when utilized for operator initial or continuing training)

Revision Record (Summary)

1. Revision 00, New JPM based on bank JPM P-FP-03, Rev. 0.

Connects FP to the 2A TDRFP rather than the 1A TDRFP

. Updated to current template and procedures for ILT 11-1 NRC Exam

P-FP-04 Rev. 00 Page 4 of 10 SRRS: 3D.105 (when utilized for operator initial or continuing training)

SETUP INSTRUCTIONS

1. Be prepared to provide a copy of pages 1-7 and 34-40 of LGA-FP-01, Alternate Vessel Injection Using the Fire Protection System.

P-FP-04 Rev. 00 Page 5 of 10 SRRS: 3D.105 (when utilized for operator initial or continuing training)

INITIAL CONDITIONS

1. A reactor scram has occurred on Unit 2 and all rods are full in.
2. There is no injection into the vessel; Diesel Fire Pumps are the only injection source.
3. The Unit 2 NSO is coordinating LGA

-FP-01, "Diesel Fire Pump Makeup to the Reactor".

4. An Operator has just been assigned to perform the in

-plant actions to line up Fire Protection to the MDRFP.

5. The 2B TDRFP is OOS with the pump casing removed.
6. The Unit 2 NSO has verified that all Feedwater System valves are aligned per LGA

-FP-01 at control room panels 2PM03J and 2H13-P601. 7. Fire protection header pressure is normal.

8. There is NO fire.
9. The Chemical Feed system is out of service.
10. You have a plant radio.

INITIATING CUE The Unit 2 NSO directs you to connect the Fire Protection System to the 2 A TDRFP IAW LGA

-FP-01 Attachment 2 A. Inform the Unit 2 NSO when the alignment is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL step.

Tell examinee he may assume all second verifications and associated paperwork is simulated complete as necessary.

Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of page

. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

P-FP-04 Rev. 00 Page 6 of 10 SRRS: 3D.105 (when utilized for operator initial or continuing training)

JPM Start Time:

(LGA-FP-01 Attachment 2 A) STEP ELEMENT STANDARD SAT UNSAT Comment Number 1. Obtain a copy of LGA

-FP-01 and an LGA Support Locker Key Examinee simulates obtaining procedure and LGA Support Locker Key

____ ____ ____ CUE: Provide examinee with the prepared copy of LGA

-FP-01 when he/she describes/demonstrates where to get procedure and Support Locker Key

. NOTE: The Evaluator will act as Safety Person as required.

2. Obtain equipment from the Main L GA Support Locker Examinee simulates obtaining equipment from LGA Support Locker (Unit 2 LGA FP-01 Equipment Bag)

____ ____ ____ CUE: You have obtained the equipment you identified.

3. OBTAIN equipment from Local Examinee simulates obtaining equipment from Local LGA Support Locker LGA Support Locker

____ ____ ____ CUE: You have obtained the equipment you identified.

  • 4. (1st Line) Remove fire hose from Hose Station FB451 and install a wye connector Examinee simulates removing fire hose from Hose Station FB451 and installing a wye connector ____ ____ ____ CUE: The fire hose and wye connector are positioned as you describe.
  • 5. (2 nd Line) Connect fire station fire hose to one end of wye and run i t into 2A TDRFP Room Examinee simulates connecting fire station fire hose to one end of wye and running it into 2A TDRFP Room CUE: The fire hose and wye connector are positioned as you describe.

NOTE: The next step of LGA-FP-01 Attachment 2A is N/A because it performs the same action on the 2B TDRFP, which is out of service per initiating cue.

  • 6. (4th Line)

(In 2A TDRFP Room)

Install wye connector at end of fire hose Examinee simulates installing wye connector at end of fire hose P-FP-04 Rev. 00 Page 7 of 10 SRRS: 3D.105 (when utilized for operator initial or continuing training)

(LGA-FP-01 Attachment 2 A) STEP ELEMENT STANDARD SAT UNSAT Comment Number *7. (5th Line)

Connect fire hoses to the two ends of this wye connector.

Examinee simulates connecting fire hoses to the two ends of this wye connector CUE: The Fire hose is connected as you describe

  • 8. (6th Line)

Install FP to 1" converter on 2FW041A/42A, 2A TDRFP Dsch Line Upstrm/Dwnstr Lo Point Drain Examinee simulates installing FP to 1" converter on 2FW041A/42A CUE: The converter is installed as you described.

  • 9. (7th Line)

Connect one fire hose to 1" converter Examinee simulates connecting one fire hose to 1" converter CUE: The Fire hose is connected as you describe

  • 10. (8th Line)

Install FP to 3/4" converter on 2CB022C, A TDRFP Suct Lo Point Drain Valve Examinee simulates installing FP to 3/4" converter o n 2CB022C CUE: The converter is installed as you described.

  • 11. (9th Line)

Connect other fire hose to 3/4" converter Examinee simulates connecting other fire hose to 3/4" converter CUE: The Fire hose is connected as you describe

12. Notify Unit 2 NSO that alignment of FP to 2A TDRFP is complete The Examinee simulates notifying the Unit 2 NSO that alignment of FP to 2A TDRFP is complete

____ ____ ____ CUE: As the Unit 2 NSO, acknowledge the report that FP is aligned to the 2 A TDRFP. 13. Complete all required signatures, dates, and times on Attachment 2A The Examinee completes or simulates completing all required signatures, dates, and times on Attachment 2A TERMINATING CUE The JPM is complete when the Unit 2 NSO is notified.

JPM Stop Time:

P-FP-04 Rev. 00 Page 8 of 10 JPM

SUMMARY

Operator's Name

Job Title: EO RO SRO FS STA/IA SRO Cert JPM Title:

JPM Number:

Lineup a Fire Hose to 2A TDRFP for Injection into the R PV P-FP-0 4 Revision Number:

Task Number and Title:

00 K/A Number and Importance:414.0 2 0 Evaluate plant conditions and control RPV water level using FP Suggested Testing Environment:

295031 (Reactor Low Water Level) EA1.08 3.8/3.9 Ability to operate and/or monitor the following as they apply to REACTOR LOW WATER LEVEL: Alternate Injection Systems Alternate Path:

Yes No SRO Only: Yes No Time Critical:

Yes No In-Plant Reference(s):

LGA-FP-01 Alternate Vessel Injection Using the Fire Protection System, Rev 15 Actual Testing Environment:

Simulator Control Room In-Plant Ot her Testing Method:

Simulate Perform Estimated Time to Complete:

10EVALUATION

SUMMARY

minutes Actual Time Used:

minutes Were all the Critical Elements performed satisfactorily?

Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments: Evaluator's Name

(Print) Evaluator's Signature: Date:

Page 9 of 10 KEY Page 10 of 10 INITIAL CONDITIONS

1. A reactor scram has occurred on Unit 2 and all rods are full in.
2. There is no injection into the vessel; Diesel Fire Pumps are the only injection source.
3. The Unit 2 NSO is coordinating LGA

-FP-01, "Diesel Fire Pump Makeup to the Reactor".

4. An Operator has just been assigned to perform the in

-plant actions to line up Fire Protection to the MDRFP.

5. The 2B TDRFP is OOS with the pump casing removed.
6. The Unit 2 NSO has verified that all Feedwater System valves are aligned per LGA

-FP-01 at control room panels 2PM03J and 2H13-P601. 7. Fire protection header pressure is normal.

8. There is NO fire.
9. The Chemical Feed system is out of service.
10. You have a plant radio.

INITIATING CUE The Unit 2 NSO directs you to connect the Fire Protection System to the 2 A TDRFP IAW LGA

-FP-01 Attachment 2 A. Inform the Unit 2 NSO when the alignment is complete.