ML14170A871
| ML14170A871 | |
| Person / Time | |
|---|---|
| Site: | Technical Specifications Task Force |
| Issue date: | 06/26/2014 |
| From: | Office of Nuclear Reactor Regulation |
| To: | |
| Honcharik M C, DPR/PRMB, 415-1774 | |
| References | |
| Download: ML14170A871 (2) | |
Text
Agenda for Technical Specifications Task Force (TSTF) / NRC Meeting OWFN Room 16-B4 July 10, 2014 9:30 a.m. - 4:00 p.m.
I. Administrative (9:30 a.m. - 9:45 a.m.) (NRC) A. Introductions B. Agenda Review C. Other Administrative Issues II. Process Issues (9:45 a.m. - 10:00 a.m.) A. Development of Industry Guidance on Nonconser vative Technical Specifications (TS) (TSTF) B. Status of Regulatory Issue Summary 2005-20 revision to reference Inspection Manual Chapter (IMC) 0326 (NRC) C. Other Process Issues III. Issues with Previously Approved Travelers (10:00 a.m. - 10:45 a.m.) A. NRC Response to TSTF Proposed Resolution of NRC Concerns with TSTF-471, TSTF-286, and TSTF-51 (NRC) B. NRC Clarification of Regulatory Guide 1.200 Revision Applicable to TSTF-425 Submittals (NRC) C. Plant-Specific Requests for Information Stating that Oversights Occurred During NRC Review of TSTF-505, "Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b" (TSTF) D. Resolution of NRC Questions on TSTF-412, "Provide Actions for One Steam Supply to Turbine Driven AFW/EFW [Auxiliary Feedwater/Emergency Feedwater] Pump Inoperable" (NRC) BREAK IV. Active Traveler Review Status (11:00 a.m. - 12:00 p.m.) A. Discuss Status of All Travelers Currently Under NRC Staff Review (All) 1. TSTF-454, Rev. 2, "Extend PCIV [Primary Containment Isolation Valve] Completion Times (NEDC-33046)" 2. TSTF-529, Rev. 1, "Clarify Use and Application Rules"
- 3. TSTF-531, Rev. 0, "Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2" 4. TSTF-537, Rev. 0, "Increase CIV [Containment Isolation Valve] Completion Time; Update of TSTF-373" 5. TSTF-540, Rev. 0, "Provide Completion Times in Lieu of Immediate Shutdown (RITSTF Initiative 6)" 6. TSTF-541, Rev. 0, "Add Exceptions to Surveillance Requirements When the Safety Function is Being Performed" 7. TSTF-542, Rev. 0, "Reactor Pressure Vessel Water Inventory Control"
- 9. TSTF-547, Rev. 0, "Clarification of Rod Position Requirements" B. TSTF Traveler Review Priority (TSTF)
LUNCH V. Technical Issues (1:00 p.m. - 3:30 p.m.) A. TSTF Response to NRC Position on Pressure Boundary Leakage (TSTF)
B. Status of NRC Enforcement Guidance Memorandum Regarding Boiling Water Reactor (BWR) Secondary Containment (NRC) C. BTP 8-9, "Open Phase Conditions in Electric Power Systems" Statements Regarding TS (TSTF) D. NRC Response to TSTF Regulatory Position Paper Regarding BWR/6 Division 3 Emergency Diesel Generator and High Pressure Core Spray Requirements (NRC) E. Discussion of Elimination of American Society of Mechanical Engineers Stroke Time Tests for CIVs (All) F. NRC Response to TSTF Proposal to Address Minimum Containment Temperature (NRC)
G. Status of Revision to IMC-0326, Appendix C.13 (NRC) BREAK VI. Future Planning (3:30 p.m. - 3:45 p.m.) A. Future Traveler submittals (TSTF) B. Next Meeting (All) VII. Designated Time for Public Comments VIII. Closing Remarks (All)
IX. Adjourn (4:00 p.m.)