ENS 53023
ENS Event | |
---|---|
07:00 Oct 11, 2017 | |
Title | Part 21 Notification - Hpsi Motor Lead Insulation Gouged |
Event Description | On October 11, 2017, Arizona Public Service Company (APS) completed an evaluation of a deviation and concluded the condition represented a defect under 10 CFR 21.
On August 25, 2017, a 1000 horsepower, High Pressure Safety Injection critical spare pump motor was discovered to have a gouge in the insulation in one of the three primary leads providing three-phase power to the motor. This deviation was identified by Palo Verde Electrical Maintenance staff during a pre-storage inspection. The gouge was inside the main terminal box, close to the (T2) terminal landing and was deep enough to expose the internal conductive wire. This motor was received on April 5, 2017, following refurbishment at the Westinghouse, Waltz Mill, Pennsylvania, facility. APS concluded this condition could result in the motor failing to perform its safety function and thus could create a substantial safety hazard. The motor was shipped back to the Westinghouse, Waltz Mill facility on October 6, 2017 for repair. The NRC resident inspector has been informed. Vendor: WESTINGHOUSE INTERSTATE 70 MADISON EXIT 54, MADISON, PA 15663 Device: WESTINGHOUSE MOTOR, 1000 HP; 3557 RPM FULL LOAD 3600 SYNC., 4000 VAC, 3 PHASE, 60 HZ - S/N 76F60563 (No model number) |
Where | |
---|---|
Westinghouse Wintersburg, Arizona (NRC Region 4) | |
Organization: | Palo Verde Nuclear Generatiing |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+172.92 h7.205 days <br />1.029 weeks <br />0.237 months <br />) | |
Opened: | Jorge Rodriguez 11:55 Oct 18, 2017 |
NRC Officer: | Dong Park |
Last Updated: | Oct 18, 2017 |
53023 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 53023\u003C/a\u003E - \u003Ca href=\"/Westinghouse\" title=\"Westinghouse\"\u003EWestinghouse\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EPart 21 Notification - Hpsi Motor Lead Insulation Gouged\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 53023 - Westinghouse\n","link":"","lat":40.44738888888889,"lon":-79.30713888888889,"icon":""}],"imageoverlays":null} | |
Westinghouse with 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
WEEKMONTHYEARENS 544402019-12-12T05:00:00012 December 2019 05:00:00
[Table view]10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Fractured and Dislocated Control Rod Drive Mechanism Thermal Sleeve ENS 534222018-05-23T04:00:00023 May 2018 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Wear of Thermal Sleeve in Westinghouse Control Rod Drive Mechanisms ENS 530232017-10-11T07:00:00011 October 2017 07:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Notification - Hpsi Motor Lead Insulation Gouged ENS 523782016-11-18T05:00:00018 November 2016 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Notification - Control Rod Guide Card Excessive Wear ENS 523102016-08-31T15:26:00031 August 2016 15:26:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Westinghouse Life Line D Type Lac Induction Motor Failure 2019-12-12T05:00:00 | |