10 CFR 40.60(b)(2)
From kanterella
Revision as of 23:23, 1 June 2014 by
StriderTol
(
talk
|
contribs
)
(Created page with "{{Reporting criterion-Nav}}")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation
Jump to search
v
t
e
Reporting criterion
10 CFR 40.60#b2
10 CFR 50.72
10 CFR 50.72(a)(1)(i), Emergency Class Declaration
10 CFR 50.72(b)(1), 50.54(x) TS Deviation
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown
10 CFR 50.72(b)(2)(iv)(A), ECCS System Actuation
10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge
10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release
10 CFR 50.72(b)(3)(ii)(A), Seriously Degraded
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition
10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition
10 CFR 50.72(b)(3)(iv)(A), System Actuation
10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor
10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat
10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident
10 CFR 50.72(b)(3)(v), Loss of Safety Function
10 CFR 50.72(b)(3)(xii), Transport of a Contaminated Person Offsite
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
10 CFR 50.73
10 CFR 50.73(a)(1), Submit an LER
10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown
10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications
10 CFR 50.73(a)(2)(i)(C), 50.54(x) TS Deviation
10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded
10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition
10 CFR 50.73(a)(2)(iv)(A), System Actuation
10 CFR 50.73(a)(2)(iv), System Actuation
10 CFR 50.73(a)(2)(ix)(A), Prevented Safety Function in Multiple System
10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor
10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat
10 CFR 50.73(a)(2)(v)(C), Loss of Safety Function - Release of Radioactive Material
10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident
10 CFR 50.73(a)(2)(v), Loss of Safety Function
10 CFR 50.73(a)(2)(vii), Common Cause Inoperability
10 CFR 72
10 CFR 72.75(b)(2), Offsite Notification
10 CFR 72.75(c)(1), ISFSI Defect
10 CFR 72.75(c)(2), ISFSI Degradation
10 CFR 72.75(d)(1), ISFSI Safety System Functional Failure
10 CFR 73
10 CFR 73.71(b)(1), Safeguards Event
10 CFR 73.77, Cyber security event notifications
Fitness for Duty
10 CFR 26.719, Reporting requirements
Blind Performance Test
10 CFR 26.719(c)(2)
, false positive
10 CFR 26.719(c)(3)
, false negative
10 CFR 26.719(c)(1)
, 30 day report
Other
10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect
10 CFR 70.50(a)
, SNM protective actions prevented
10 CFR 70.50(b)(1)
, SNM unplanned contamination
10 CFR 70.50(b)(2)
, SNM equipment failure
10 CFR 70.50(b)(3)
, SNM medical treatment
10 CFR 70.50(b)(4)
, SNM fire or explosion
All reporting criteria
WEEK
MONTH
YEAR
ENS 56586
2023-06-21T20:30:00
0
Start date
: 21 June 2023 20:30:00
Site
:
Honeywell International, Inc.
Reporting criterion
:
10 CFR 40.60(b)(2)
ENS 50875
2015-03-09T20:00:00
0
Start date
: 9 March 2015 20:00:00
Site
:
Honeywell International, Inc.
Reporting criterion
:
10 CFR 40.60(b)(2)
ENS 50858
2015-03-02T15:20:00
0
Start date
: 2 March 2015 15:20:00
Site
:
Honeywell International, Inc.
Reporting criterion
:
10 CFR 40.60(b)(2)
ENS 50088
2014-05-03T20:00:00
0
Start date
: 3 May 2014 20:00:00
Site
:
Manson Construction
Reporting criterion
:
10 CFR 40.60(b)(2)
ENS 49552
2013-11-17T20:00:00
0
Start date
: 17 November 2013 20:00:00
Site
:
Honeywell International, Inc.
Reporting criterion
:
10 CFR 40.60(b)(2)
ENS 46831
2011-05-08T12:30:00
0
Start date
: 8 May 2011 12:30:00
Site
:
Honeywell International, Inc.
Reporting criterion
:
10 CFR 40.60(b)(2)
ENS 46781
2011-04-23T22:00:00
0
Start date
: 23 April 2011 22:00:00
Site
:
Honeywell International, Inc.
Reporting criterion
:
10 CFR 40.60(b)(2)
ENS 46764
2011-04-16T19:30:00
0
Start date
: 16 April 2011 19:30:00
Site
:
Honeywell International, Inc.
Reporting criterion
:
10 CFR 40.60(b)(2)
ENS 46444
2010-11-30T11:00:00
0
Start date
: 30 November 2010 11:00:00
Site
:
Honeywell International, Inc.
Reporting criterion
:
10 CFR 40.60(b)(2)
ENS 42836
2006-09-10T20:30:00
0
Start date
: 10 September 2006 20:30:00
Site
:
Honeywell International, Inc.
Reporting criterion
:
10 CFR 40.60(b)(2)
ENS 41270
2004-12-17T18:00:00
0
Start date
: 17 December 2004 18:00:00
Site
:
Honeywell International, Inc.
Reporting criterion
:
10 CFR 40.60(b)(2)
ENS 40978
2004-08-23T14:00:00
0
Start date
: 23 August 2004 14:00:00
Site
:
Honeywell International, Inc.
Reporting criterion
:
10 CFR 40.60(b)(2)
ENS 40089
2003-08-19T16:00:00
0
Start date
: 19 August 2003 16:00:00
Site
:
Honeywell International, Inc.
Reporting criterion
:
10 CFR 40.60(b)(2)
[Table view]
NUREG-1022, Event Reporting Guidelines for 10 CFR 50.72 and 10 CFR 50.73
Category
:
Reporting criterion
Navigation menu
Personal tools
Create account
Log in
Namespaces
Page
Discussion
English
Views
Read
View source
View history
More
Search
Navigation
Main page
Recent changes
Random page
Community
Help
Patreon
Databases
ENS
LER
Findings
Inspections
TSTF
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
Browse properties