|
---|
Category:Safety Evaluation Report
MONTHYEARML21012A3632021-02-11011 February 2021 Safety Evaluation for NuScale Power, LLC, Control Room Staffing Topical Report TR-0420-69456 Public ML20199M4082020-07-20020 July 2020 Final SER for NuScale Chapter 15, Transient and Accident Analyses (Public Version) ML20181A4312020-06-22022 June 2020 Final SER for NuScale TR-0516-49416, Rev 3 (Encl. 1_PUBLIC Version) ML20181A2682020-06-22022 June 2020 Final SER for NuScale TR-0516-49422, Rev 2 (Encl. 1_PUBLIC Version) ML20157A2212020-06-0505 June 2020 Final SER for NuScale TR-0716-50350-P, Rod Ejection Accident Methodology, Revision 1 (Letter) & (Encl.1 Public Version) ML20056C9082020-02-27027 February 2020 Final SER for NuScale Power LLC TR-0716-50351, Areva Method for Evaluation of Fuel Assembly Structural Response to External Applied Forces, Revison 1 (Letter) & (Encl. 1 - Public Version) ML20049H5442020-02-18018 February 2020 Letter to NuScale NON-LOCA TR SER ML20049H5422020-02-18018 February 2020 NON-LOCA TR SE Final Redacted (Public) ML20044E3492020-02-18018 February 2020 Rod Ejection Accident Methodology SER ML20027A1082020-01-30030 January 2020 Accident Source Term TR Final SER Public ML20022A1782020-01-22022 January 2020 Design Certification Application - Chapter 9 Phase 4 SER Public ML19352E7782020-01-21021 January 2020 SER NuScale TR_0516_49417 Stability_Public_Encl 1 ML19336B5932020-01-16016 January 2020 Chapter 4 Phase 4 SER with No Ols ML19284A3722020-01-13013 January 2020 Chapter P4 SER, Reactor Coolant System and Connecting Systems ML20013D4372020-01-13013 January 2020 DCA - Safety Evaluation Report with No Open Items for Chapter 1, Introduction and General Discussion. ML19267A0862020-01-0808 January 2020 Phase 4 Chapter 14 SER ML19337A7872020-01-0808 January 2020 Phase 4 SE Input for Chapter 3 (Public) ML19330E0202019-12-27027 December 2019 LLC, Design Certification Application - Phase 4 Chapter 16 Safety Evaluation ML19352E7752019-12-19019 December 2019 Letter to NuScale Transmitting Final SER TR-0516-49417 Rev 1 Stability ML19343A0272019-12-18018 December 2019 Phase 4 SER - Chapter 6 ML19182A2412019-12-16016 December 2019 DCA - Chapter 13.6 SE with No Open Items ML19340A0652019-12-16016 December 2019 DCA - Chapter 18 SER with No Open Items ML19338B7832019-12-11011 December 2019 LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 20, Mitigation of Beyond-Design-Basis Events - Public SER ML19169A1312019-12-10010 December 2019 Letter to NuScale Transmitting SER ML19169A1322019-12-10010 December 2019 Memo to ACRS Transmitting SER ML19169A3122019-12-0404 December 2019 LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 16, Technical Specifications - Letter ML19318E3032019-12-0404 December 2019 Chapter 12 Phase 4 SE - Clean Version OGC Reviewed NLO ML19319A6842019-12-0303 December 2019 Phase 4 SER - Chapter 8 ML19165A2822019-11-27027 November 2019 DCA - Chapter 2 SER with No Open Items ML19169A2952019-11-26026 November 2019 Memo to ACRS Transmitting SER ML19169A2902019-11-22022 November 2019 Letter to NuScale Transmitting SER ML19169A1182019-11-22022 November 2019 Letter to NuScale Transmitting Phase 4 SER for Chapter 8 ML19169A2912019-11-22022 November 2019 Memo to ACRS Transmitting SER ML19169A2722019-10-23023 October 2019 DCA - Chapter 21 SER with No Open Items ML19289C1592019-10-18018 October 2019 Dnrl Memo to ACRS - Safety Evaluation for Topical Report, TR-0915-17565 ML19165A2862019-10-17017 October 2019 DCA - Chapter 13 SER with No Open Items ML19270F2782019-09-27027 September 2019 Public Version of Phase 4 SER for Chapter 7 ML19218A0372019-09-12012 September 2019 Phase 4 SER - Chapter 10 ML19254C8582019-09-11011 September 2019 Non-Proprietary Version - SER for NuScale TR-0516-49417 Evaluation Methodology for Stability Analysis of the NuScale Power Module, Rev 0 ML19169A1412019-09-0909 September 2019 Memo to ACRS Transmitting Chapter 10 (Phase 4) SER ML19169A1392019-09-0909 September 2019 Letter to NuScale Transmitting Chapter 10 (Phase 4) SER ML19169A1492019-08-29029 August 2019 Letter to NuScale Transmitting SER with No Open Items for Chapter 11, Radioactive Waste Management. ML19169A1502019-08-29029 August 2019 Nuscale Power, LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 11, Radioactive Waste Management ML19240A4422019-08-29029 August 2019 LLC, Design Certification Application - Safety Evaluation with No Open Items for Chapter 11, Radioactive Waste Management - SER ML19238A0172019-08-23023 August 2019 Preliminary P2 SER NuScale Ch 15 Redacted Version - Clean ML19233A0712019-08-21021 August 2019 Ser_Areva Seismic Methodology TR-0716-50351_Non_Proprietary ML19207A3712019-08-0808 August 2019 Chapter 17 Phase 4 SER ML19224B3762019-08-0808 August 2019 Chapter 17 Phase 4 SER (Public) ML18220B3132019-04-24024 April 2019 DCA - Chapter 21 - Multi-Module Design Considerations - SE with Open Items ML19073A0712019-04-19019 April 2019 DCA - Safety Evaluation Report with Open Items - Chapter 19, Probabilistic Risk Assessment and Severe Accident Evaluation for New Reactors 2021-02-11
[Table view] |
Text
Code of Federal Regulations
- Code of Federal Regulations*
- General Human Factors Engineering Program Goals and Scope (Criteria 2.4.1(1)-(7))
- Human Factors Engineering Team and Organization (Criteria 2.4.2(1)-(4))
Human Factors Engineering Process and Procedures (Criteria 2.4.3(1)-(6))
Tracking Human Factors Engineering Issues (Criteria 2.4.4(1)-(4))
- Technical Program (Criteria 2.4.5(1)-(5))
Scope (Criteria 3.4.1(1)-(5))
- Issue Analysis, Tracking and Review (Criteria 3.4.2(1)-(4))
- Methodology (Criteria 4.4(1)-(2))
Functional Requirements Analysis Results (Criteria 4.4(3)-(4))
- Function Allocation Results (Criteria 4.4(5)-(7))
Verification that Functional Requirements Analysis/Function Allocation Is Complete (Criterion 4.4(8)) **
- Scope (Criterion 5.4(1)) Screening Methodology (Criterion 5.4(2))
Tasks Attributes and Iterative Process (Criteria 5.4(3)-(8)) *
Reliability and Feasibility (Criterion 5.4(9))
- Rationale for a Design-Specific Staffing Requirement
Evaluation of the Applicant's Technical Basis (Criterion 6.4(2))
o o
ooo oo*
- Other Review Criteria (Criteria 6.4(3)-(6))
- Identification of Important Human Actions (Criteria 7.4(1)-(2))
Treatment of Important Human Actions in the Human Factors Engineering Process (Criterion 7.4(3)) ***
- Human-System Interface Design Inputs (Criteria 8.4.1(1)-(4))
Concept of Use and Human-System Interface Design Overview (Criteria 8.4.2(1)-(2))
Human Factors Engineering Design Guidance for Human-System Interfaces (Criteria 8.4.3(1)-(5)) *
General Human-System Interface Design and Integration (Criteria 8.4.4.1(1)-(8))
Main Control Room Design (Includes Three Mile Island Requirements)
Technical Support Center Design
Emergency Operations Facility Design Remote Shutdown Facility Design (Criteria 8.4.4.5(1)-(2))
Local Control Station Design (Criteria 8.4.4.6(1)-(2))
Degraded Instrumentation and Control and Human-System Interface Conditions (Criteria 8.4.5(1)-(4))
Human-System Interface Tests and Evaluations (Criteria 8.4.6(1)-(2)) NUREG/CR-7202 Topics *
- Sampling of Operational Conditions
Design Verification
.
Integrated Systems Validation **
Plant Personnel (Criteria 11.4.3.4(1)-(4)) *
Human Engineering Discrepancy Resolution Review (Criteria 11.4.4(1)-(5))
- NUREG-0711, Section 12.3, "Applicant Products and Submittals"
Evaluation of Aspects of the Design Not Addressed in Verification and Validation (Criterion 12.4(1))
Comparison of Final Products to Planned Design and Identification of Discrepancies (Criterion 12.4(2))
as well as Verification that All Human Factors Engineering Issues Have Been Addressed (Criterion 12.4(3))
closed Description of How the Human Factors Engineering Program Addressed Important Human Actions (Criterion 12.4(4))
- Code of Federal Regulations**