ML19007A311

From kanterella
Revision as of 17:20, 12 February 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Applicant'S Response to NRC Staff'S Clarification Regarding the Admissibility of Proposed Cooling Tower Contentions
ML19007A311
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/07/2019
From: Bessette P M, Hamrick S, Lighty R K
Florida Power & Light Co, Morgan, Morgan, Lewis & Bockius, LLP
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-250-SLR, 50-251-SLR, ASLBP 18-957-01-SLR-BD01, RAS 54741
Download: ML19007A311 (11)


Text

See failure to comply with a legal requirementalready furtherand overlapping actually implementedSee, e.g.U.S. Dep't of EnergySee Id Idi.e.IdIdId

alreadymustIdId IdId

whetherexistingRobertson v. Methow Valley Citizens CouncilS. Fork Band Council of W. Shoshone of Nev. v. U.S. Dep't of InteriorMethow ValleyExelon Generation Co., LLCEntergy Nuclear Operations, Inc.

appropriate range every availablebesteffectivenessNextEra Energy Seabrook, LLCHeadwaters, Inc. v. BLMreh'g en banc deniedFla. Power & Light Co.See Crow Butte Res., Inc.In Situidid.See, e.g.

dutybackgroundno position conclusion attemptrangeIdSeabrookIdIdE.g.

sufficient complete absencesee also Entergy Nuclear Operations, Inc.See Entergy Nuclear Operations, Inc. DTE Elec. Co. See PalisadesFermiAriz. Pub. Serv. Co.

regulatory agenciesIdIdIdIdIdIdSee unlike Executed in Accord with 10 C.F.R. § 2.304(d)Executed in Accord with 10 C.F.R. § 2.304(d)

Signed (electronically) by Ryan K. Lighty

Counsel for Florida Power & Light Company Cf. Duke Energy Corp. See

Signed (electronically) by Ryan K. Lighty

Counsel for Florida Power & Light Company