|
---|
Category:Technical Specifications
MONTHYEARRS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs ML22332A4502022-11-10010 November 2022 Attachment 2 - Markup of Technical Specification Pages ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21158A2282021-07-13013 July 2021 Issuance of Amendments to Renewed Facility Operating Licenses a License Amendment to Technical Specification 3.7.3, Ultimate Heat Sink ML21265A5362021-06-30030 June 2021 Attachment 2: LaSalle County Station Units 1 & 2 - Proposed Technical Specifications Markups ML21082A4222021-05-27027 May 2021 Issuance of Amendment Nos. 249 and 235 to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 RS-20-136, Response to Request for Additional Information Re License Amendment Requests for Amendments to Renewed Facility OL to Adopt 10CFR50.69 & to Adopt TSTF-505, Rev. 2 (EPID L-2020-LLA-0017 and EPID-L-2020-LLA-0018)2020-10-29029 October 2020 Response to Request for Additional Information Re License Amendment Requests for Amendments to Renewed Facility OL to Adopt 10CFR50.69 & to Adopt TSTF-505, Rev. 2 (EPID L-2020-LLA-0017 and EPID-L-2020-LLA-0018) RS-20-016, County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems2020-04-13013 April 2020 County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement RS-17-127, Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-12-13013 December 2017 Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. ML17257A3042017-10-30030 October 2017 Non-Proprietary - Issuance of Amendments Request to Revise Suppression Pool Swell Design Analysis and the Facility Licensing Basis ML16259A0592016-10-19019 October 2016 License Appendix a and B RS-16-035, County, and Quad Cities - Request for License Amendment to Address Secondary Containment Access Openings2016-02-0303 February 2016 County, and Quad Cities - Request for License Amendment to Address Secondary Containment Access Openings ML15324A4392015-12-17017 December 2015 Issuance of Amendments (CAC Nos. MF5471-MF5476) RS-15-279, Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls.2015-11-19019 November 2015 Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls. ML15202A5782015-11-19019 November 2015 Issuance of Amendment to Revise the Ultimate Heat Sink Temperature Limits ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) ML14323A5222015-04-0808 April 2015 Issuance of Amendments Regarding the Emergency Plan Definition of Annual Training ML14353A0832015-01-29029 January 2015 Issuance of Amendments Revising Peak Calculated Primary Containment Internal Pressure ML14220A5172014-11-25025 November 2014 Issuance of Amendment Revising Pressure and Temperature Limits ML14085A5322014-07-21021 July 2014 Issuance of Amendments Adoption of TSTF-522 Ventilation System Surveillance Requirements RS-13-092, License Amendment Request to Revise Peak Calculated Primary Containment Internal Pressure2013-09-0505 September 2013 License Amendment Request to Revise Peak Calculated Primary Containment Internal Pressure RS-13-137, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process2013-09-0303 September 2013 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process RS-11-149, Request for Technical Specification Change for Minimum Critical Power Ratio Safety Limit2011-10-12012 October 2011 Request for Technical Specification Change for Minimum Critical Power Ratio Safety Limit RS-11-036, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.2011-04-0404 April 2011 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. RS-11-014, Additional Information Supporting License Amendment Request Regarding the Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks2011-01-28028 January 2011 Additional Information Supporting License Amendment Request Regarding the Use of Neutron Absorbing Inserts in Unit 2 Spent Fuel Pool Storage Racks ML1018303612010-09-16016 September 2010 License Amendment, Measurement Uncertainty Recapture Power Uprate RS-10-080, License Amendment Request Regarding Reactor Coolant System Pressure and Temperature Limit Curves2010-04-19019 April 2010 License Amendment Request Regarding Reactor Coolant System Pressure and Temperature Limit Curves RS-10-015, Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System.2010-02-22022 February 2010 Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. RS-10-001, LaSalle, Units 1 and 2, Attachment 2 - Markup of Proposed Operating License and Technical Specifications Pages2010-01-27027 January 2010 LaSalle, Units 1 and 2, Attachment 2 - Markup of Proposed Operating License and Technical Specifications Pages ML1003213062010-01-27027 January 2010 Attachment 2 - Markup of Proposed Operating License and Technical Specifications Pages ML0927202312009-10-0202 October 2009 Correction Letter for License Amendment Nos. 195 and 182, Revise Local Power Range Monitor Calibration Frequency ML0924504042009-09-0303 September 2009 Correction Letter for License Amendment Nos. 193 and 180 Obsolete License Conditions and Revise Technical Specifications RS-09-110, Additional Information Supporting Request for License Amendment to Delete Obsolete License Conditions and Revise Technical Specifications2009-08-11011 August 2009 Additional Information Supporting Request for License Amendment to Delete Obsolete License Conditions and Revise Technical Specifications RS-09-020, Request for a License Amendment to Technical Specification 3.5.1, Emergency Core Cooling Systems (ECCS) Operating.2009-03-26026 March 2009 Request for a License Amendment to Technical Specification 3.5.1, Emergency Core Cooling Systems (ECCS) Operating. ML0823907072008-08-21021 August 2008 Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses ML0821301362008-07-25025 July 2008 Braidwood/Byron/Clinton/Dresden/Lasalle/Oyster Creek/Peach Bottom/Quad Cities/Three Mile Island - Tech Spec Pages for Amds to Change TS Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators RS-08-091, Request for a License Amendment to Revise Local Power Range Monitor Calibration Frequency2008-07-25025 July 2008 Request for a License Amendment to Revise Local Power Range Monitor Calibration Frequency RA-08-024, Amergen, Energy LLC, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours.2008-04-21021 April 2008 Amergen, Energy LLC, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours. ML0807303512008-03-10010 March 2008 Tech. Spec. Pages, Issuance of Amendments Revise TS 3.7.5 RS-08-012, Amergen Company, Request for Amendment to Administrative Controls Section of Technical Specifications2008-02-28028 February 2008 Amergen Company, Request for Amendment to Administrative Controls Section of Technical Specifications ML0733310942007-11-19019 November 2007 Tech Specs for Amendments to Provide Consistency with Quality Assurance Topical Report ML0731003892007-10-31031 October 2007 Technical Specifications, Changes Resulting from the Incorporation of TSTF-448, Control Room Habitability. ML0728907472007-10-12012 October 2007 Technical Specifications, Revise Technical Specifications, Section 5.5.7, Inservice Testing Program. ML0727603342007-09-27027 September 2007 Technical Specifications, Issuance of Amendments Required Action End States Consistent with Technical Specification Task Force TSTF-423 2023-08-30
[Table view] |
Text
RHRSW System 3.7.1 3.7 PLANT SYSTEMS 3.7.1 Residual Heat Removal Service Water (RHRSW) System LCO 3.7.1 APPLICABILITY:
Two RHRSW subsystems shall be OPERABLE.MODES 1, 2, and 3.ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. --------NOTE--------
A.1 --------NOTE---------
Not applicable to Enter applicable Unit 2 during Conditions and replacement of the Required Actions of Division 1 CSCS LCO 3.4.9, "Residual isolation valves Heat Removal (RHR)during Unit 1 Shutdown Cooling Refueling 11 while System-Hot Unit 1 is in Mode 4,5, Shutdown," for RHR or defueled.
shutdown cooling subsystem made One RHRSW subsystem inoperable by RHRSW inoperable.
System.Restore RHRSW 7 days subsystem to OPERABLE status.(continued)
LaSalle 1 and 2 3 .7 .1- 1 Amendment N1o. 175/ 161 RHRSW System 3.7.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. --------NOTE--------
B.1 --------NOTE---------
Only applicable to Enter applicable Unit 2 during Conditions and replacement of the Required Actions of Division 1 CSCS LCO 3.4.9, "Residual isolation valves Heat Removal (RHR)during Unit 1 Shutdown Cooling Refueling 11 while System-Hot Unit 1 is in Mode 4,5, Shutdown," for RHR or defueled.
shutdown cooling subsystem made One RHRSW subsystem inoperable by RHRSW inoperable.
System.Restore RHRSW 10 davs subsystem to OPERABLE status.C. Both RHRSW subsystems C.1 --------NOTE---------
inoperable.
Enter applicable Conditions and Required Actions of LCO 3.4.9 for RHR shutdown cooling subsystems made inoperable by RHRSW System.Restore one RHRSW 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> subsystem to OPERABLE status.D. Required Action and D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met. AND D.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> LaSalle I and 2 3 .7. 1- 2 Amendment No.175 / 161 RHRSW System 3.7.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.1.1 Verify each RHRSW manual, power operated, 31 days and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position or can be aligned to the correct position.LaSalle 1 and 2 3..7. 1 -3 Amendment No. 175 / 161 DGCW System 3.7.2 3.7 PLANT SYSTEMS 3.7.2 Diesel Generator Cooling Water (DGCW) System LCO 3.7.2 The following DGCW subsystems shall be OPERABLE: a. Three DGCW subsystems; and b. The opposite unit Division 2 DGCW subsystem.
APPLICABILITY:
MODES 1, 2, and 3.ACTIONS-------------------------------------
NOTE-------------------------------------
Separate Condition entry is allowed for each DGCW subsystem.
.-- ----.------------.- ------I LaSalle 1 and 2 3 .7 .2-1I Amendment No. 175 / 161 DGCW System 3.7.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. --------NOTES--------
A.1 Declare supported Immediately
- 1. Not applicable to component(s)
Division 1 during inoperable.
replacement of the Division 1 CSCS isolation valves during Unit 1 Refueling 11 while Unit 1 is in MODE 4,5, or defueled.2. Not applicable to Division 2 during replacement of the Division 2 CSCS isolation valves during Unit 2 Refueling 11 while Unit 2 is in MODE 4,5, or defueled and during Unit 1 Refueling 12 while Unit 1 is in MODE 4,5, or defueled.One or more DGCW subsystems inoperable.(continued)
LaSalle I and 2 ,. 7 .2-2 Amendment No. 175k 161 DGCW System 3.7.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. --------NOTES--------
B.1 Restore DGCW 6 days 1. Only applicable to subsystem to OPERABLE Division 1 during status. OR replacement of the Division 1 CSCS 10 days if isolation valves Divis-ion 1 CSCS during Unit 1 inoperable Refueling 11 while Unit 1 is in Mode 4,5, or defueled.2. Only applicable to Division 2 during replacement of the Division 2 CSCS isolation valves during Unit 2 Refueling 11 while Unit 2 is in MODE 4,5, or defueled and during Unit 1 Refueling 12 while Unit 1 is in MODE 4,5, or defueled.One or more DGCW subsystems inoperable.
C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition B AND not met.C.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> LaSalle 1 and 2 3 .7. 2- 3 Amendment No175 / 161 DGCW System 3.7.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.2.1 Verify each DGCW subsystem manual, power 31 days operated, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.SR 3.7.2.2 Verify each DGCW pump starts automatically 24 months on each required actual or simulated initiation signal.LaSalle 1 and 2-!. 7 .2-4 Amendment No.175 / 161