RA-16-0005, and H.B. Robinson, Unit 2 - Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5

From kanterella
Revision as of 15:15, 28 January 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
and H.B. Robinson, Unit 2 - Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5
ML16032A004
Person / Time
Site:  Duke Energy icon.png
Issue date: 02/01/2016
From: Repko R T
Duke Energy Progress
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML16032A174 List:
References
RA-16-0005 DPC-NE-3000-A, Rev.5a
Download: ML16032A004 (986)


Text

Regis T. Repko 526 South Church Street Charlotte, NC 28202 Mailing Address:

Mail Code EC07H / P.O. Box 1006 Charlotte, NC 28201

-1006 704-382-4126

PROPRIETARY INFORMATION - WITHHOLD UNDER 10 CFR 2.390 UPON REMOVAL OF ENCLOSURES 1 AND 3 THIS LETTER IS UNCONTROLLED PROPRIETARY INFORMATION - WITHHOLD UNDER 10 CFR 2.390 UPON REMOVAL OF ENCLOSURES 1 AND 3 THIS LETTER IS UNCONTROLLED

Serial: RA-16-0005 10 CFR 50.90 February 1, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

-0001 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50

-400 / RENEWED LICENSE NO. NPF

-63 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50

-261 / RENEWED LICENSE NO. DPR

-23

SUBJECT:

SUPPLEMENT TO APPLICATION TO REVISE TECHNICAL SPECIFICATIONS FOR METHODOLOGY REPORT DPC

-NE-2005-P, REVISION 5

REFERENCES:

1. Duke Energy letter, Application to Revise Technical Specifications for Methodology Report DPC

-NE-2005-P, Revision 5, "Thermal

-Hydraulic Statistical Core Design Methodology", dated March 5, 2015 (ADAMS Accession No.

ML15075A211) 2. Duke Energy letter, Response to NRC Request for Additional Information (RAI) Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5, dated September 9, 2015 In Reference 1, Duke Energy Progress, Inc., referred to henceforth as "Duke Energy," submitted a request for an amendment to the Technical Specifications (TS) for Shearon Harris Nuclear Power Plant, Unit 1 (SHNPP) and H. B. Robinson Steam Electric Plant, Unit No. 2 (HBRSEP). Specifically, Duke Energy requested NRC review and approval of DPC

-NE-2005-P, "Thermal-Hydraulic Statistical Core Design Methodology," Revision 5, and adoption of the methodology into the TS for SHNPP and HBRSEP. In Reference 2, Duke Energy responded to an NRC request for additional information (RAI) regarding this submittal. Reference 2 included a proprietary version (Enclosure 1 of Reference

2) and a redacted version (Enclosure 2 of Reference 2) of Revision 5a of the Duke Energy methodology DPC-NE-3000. Subsequent to submittal of Reference 2, the NRC staff brought to our attention that there were administrative errors in the way redacted information was marked in these two enclosures.

The enclosures included with this submittal provide corrections for the administrative errors identified by the NRC staff, as well as additional administrative errors identified during our

PROPRIETARY INFORMATION - WITHHOLD UNDER 10 CFR 2.390 UPON REMOVAL OF ENCLOSURES 1 AND 3 THIS LETTER IS UNCONTROLLED U.S. Nuclear Regulatory Commission RA-16-0005 Page 3 PROPRIETARY INFORMATION - WITHHOLD UNDER 10 CFR 2.390 UPON REMOVAL OF ENCLOSURES 1 AND 3 THIS LETTER IS UNCONTROLLED

Enclosures:

1. Corrected Pages for DPC-NE-3000-PA, Revision 5a , "Thermal-Hydraulic Transient Analysis Methodology" (Proprietary) 2.Corrected Pages for DPC-NE-3000-A, Revision 5a, "Thermal

-Hydraulic Transient Analysis Methodology" (Redacted)

3. DPC-NE-3000-PA, Revision 5a, "Thermal

-Hydraulic Transient Analysis Methodology" (Proprietary)

4. DPC-NE-3000-A, Revision 5a, "Thermal

-Hydraulic Transient Analysis Methodology" (Redacted) cc: (all with Enclosures unless otherwise noted)

L. Wert, Regional Administrator USNRC Region II (acting) J. D. Austin , USNRC Senior Resident Inspector - SHNPP K. M. Ellis , USNRC Senior Resident Inspector - HBRSEP M. C. Barillas, NRR Project Manager - SHNPP & HBRSEP R. F. Kuntz, NRR Senior Project Manager W. L. Cox, III, Section Chief, NC DHSR (Without Enclosures 1 and 3) S. E. Jenkins, Manager, Radioactive and Infectious Waste Management Section (SC)

(Without Enclosures 1 and 3) Attorney General (SC)

(Without Enclosures 1 and 3) A. Gantt, Chief, Bureau of Radiological Health (SC) (without Enclosures 1 and 3)

RA-16-0005

Enclosure 2 Corrected Pages for DPC-NE-3000-A, Revision 5a, "Thermal-Hydraulic Transient Analysis Methodology" (Redacted)

(24 pages attached)

NOTE DPC-NE-3000-A includes a section with copies of previous RAI responses. This enclosure includes replacement pages for three pages included in the RAI responses section: The 22 nd page of this enclosure, identified as Figure 11-1, with no page number in the footer, is part of the June 15, 1989 RAI respons

e. The 23 rd page of this enclosure, identified as page 14 in the footer, is part of the February 20, 1990 RAI response. The 24 th page of this enclosure, identified as page 2

-3 in the footer, is part of the May 21, 2003 RAI response.

RA-16-0005

Enclosure 4 DPC-NE-3000-A, Revision 5a, "Thermal-Hydraulic Transient Analysis Methodology" (Redacted)

Regis T. Repko 526 South Church Street Charlotte, NC 28202 Mailing Address:

Mail Code EC07H / P.O. Box 1006 Charlotte, NC 28201

-1006 704-382-4126

PROPRIETARY INFORMATION - WITHHOLD UNDER 10 CFR 2.390 UPON REMOVAL OF ENCLOSURES 1 AND 3 THIS LETTER IS UNCONTROLLED PROPRIETARY INFORMATION - WITHHOLD UNDER 10 CFR 2.390 UPON REMOVAL OF ENCLOSURES 1 AND 3 THIS LETTER IS UNCONTROLLED

Serial: RA-16-0005 10 CFR 50.90 February 1, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

-0001 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50

-400 / RENEWED LICENSE NO. NPF

-63 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50

-261 / RENEWED LICENSE NO. DPR

-23

SUBJECT:

SUPPLEMENT TO APPLICATION TO REVISE TECHNICAL SPECIFICATIONS FOR METHODOLOGY REPORT DPC

-NE-2005-P, REVISION 5

REFERENCES:

1. Duke Energy letter, Application to Revise Technical Specifications for Methodology Report DPC

-NE-2005-P, Revision 5, "Thermal

-Hydraulic Statistical Core Design Methodology", dated March 5, 2015 (ADAMS Accession No.

ML15075A211) 2. Duke Energy letter, Response to NRC Request for Additional Information (RAI) Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5, dated September 9, 2015 In Reference 1, Duke Energy Progress, Inc., referred to henceforth as "Duke Energy," submitted a request for an amendment to the Technical Specifications (TS) for Shearon Harris Nuclear Power Plant, Unit 1 (SHNPP) and H. B. Robinson Steam Electric Plant, Unit No. 2 (HBRSEP). Specifically, Duke Energy requested NRC review and approval of DPC

-NE-2005-P, "Thermal-Hydraulic Statistical Core Design Methodology," Revision 5, and adoption of the methodology into the TS for SHNPP and HBRSEP. In Reference 2, Duke Energy responded to an NRC request for additional information (RAI) regarding this submittal. Reference 2 included a proprietary version (Enclosure 1 of Reference

2) and a redacted version (Enclosure 2 of Reference 2) of Revision 5a of the Duke Energy methodology DPC-NE-3000. Subsequent to submittal of Reference 2, the NRC staff brought to our attention that there were administrative errors in the way redacted information was marked in these two enclosures.

The enclosures included with this submittal provide corrections for the administrative errors identified by the NRC staff, as well as additional administrative errors identified during our

PROPRIETARY INFORMATION - WITHHOLD UNDER 10 CFR 2.390 UPON REMOVAL OF ENCLOSURES 1 AND 3 THIS LETTER IS UNCONTROLLED U.S. Nuclear Regulatory Commission RA-16-0005 Page 3 PROPRIETARY INFORMATION - WITHHOLD UNDER 10 CFR 2.390 UPON REMOVAL OF ENCLOSURES 1 AND 3 THIS LETTER IS UNCONTROLLED

Enclosures:

1. Corrected Pages for DPC-NE-3000-PA, Revision 5a , "Thermal-Hydraulic Transient Analysis Methodology" (Proprietary) 2.Corrected Pages for DPC-NE-3000-A, Revision 5a, "Thermal

-Hydraulic Transient Analysis Methodology" (Redacted)

3. DPC-NE-3000-PA, Revision 5a, "Thermal

-Hydraulic Transient Analysis Methodology" (Proprietary)

4. DPC-NE-3000-A, Revision 5a, "Thermal

-Hydraulic Transient Analysis Methodology" (Redacted) cc: (all with Enclosures unless otherwise noted)

L. Wert, Regional Administrator USNRC Region II (acting) J. D. Austin , USNRC Senior Resident Inspector - SHNPP K. M. Ellis , USNRC Senior Resident Inspector - HBRSEP M. C. Barillas, NRR Project Manager - SHNPP & HBRSEP R. F. Kuntz, NRR Senior Project Manager W. L. Cox, III, Section Chief, NC DHSR (Without Enclosures 1 and 3) S. E. Jenkins, Manager, Radioactive and Infectious Waste Management Section (SC)

(Without Enclosures 1 and 3) Attorney General (SC)

(Without Enclosures 1 and 3) A. Gantt, Chief, Bureau of Radiological Health (SC) (without Enclosures 1 and 3)

RA-16-0005

Enclosure 2 Corrected Pages for DPC-NE-3000-A, Revision 5a, "Thermal-Hydraulic Transient Analysis Methodology" (Redacted)

(24 pages attached)

NOTE DPC-NE-3000-A includes a section with copies of previous RAI responses. This enclosure includes replacement pages for three pages included in the RAI responses section: The 22 nd page of this enclosure, identified as Figure 11-1, with no page number in the footer, is part of the June 15, 1989 RAI respons

e. The 23 rd page of this enclosure, identified as page 14 in the footer, is part of the February 20, 1990 RAI response. The 24 th page of this enclosure, identified as page 2

-3 in the footer, is part of the May 21, 2003 RAI response.

RA-16-0005

Enclosure 4 DPC-NE-3000-A, Revision 5a, "Thermal-Hydraulic Transient Analysis Methodology" (Redacted)