Responds to NRC 801028 Ltr Re Violations Noted in IE Insp Rept 50-272/80-24.Corrective Actions:Essential Personal Items Taped to Work Crew Personnel & Operating Personnel Instructed to Read & Follow Maint Procedure
ML18085A736
Person / Time
Site: Salem PSEG icon.png
Issue date: 11/17/1980
From: SCHNEIDER F W
Public Service Enterprise Group
To: CARLSON R T, GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18085A735 List:
References
NUDOCS 8102040134
Download: ML18085A736 (2)


See also: IR 05000272/1980024

Text

'--'.. -,*-.

W. Schneide;

Pub I ic Service Electric and Gas Company 80 Park Place Newark, N .J. 07101 201 /430-7373

Vice President

Production

  • November 17, 1980 Mr. Boyce H. Grier, Director Off ice of Inspection

and Enforcement

Region 1 U.S. Nuclear Regulatory

Commission

631 Park Avenue King of Prussia, PA 19406 Attention:

Mr. Robert T. Carlson, Chief Gentlemen:

Reactor Construction

and Engineering

Support Branch NRC INSPECTION

50-272/80-24

SALEM GENERATING

STATION, UNIT 1 We have reviewed the report of your inspection

conducted

by Mr. R. A. Brearty on October 6 and 7, 1980 and October 9 and 10, 1980. Our response to the item of noncompliance*

identified

in Appendix A is as follows: Item: Deficiency

The Salem Unit 1 technical

specification

6.8.1 states, in part, that "Written procedures

shall be established, .* ** covering the activities

referenced

below: a. The applicable

procedures

recommended

in Appendix "A" of Regulatory

Guide 1.33, November 1972 .*. " Regulatory

Guide 1. 3 3, .November

19 7 2 , Appendix "A" ,Section I .1 * states, in part, that "Maintenance

which can affect the formance of safety-related

equipment

should be .** performed

in accordance

with written procedures, .** " Maintenance

Procedure

MllF, paragraph

3.1, states, in part, that " .** when the reactor vessel is open, the control area is the reactor vessel pit *** " This procedure

further states, in part, that "Control of tools and items in an area is by securing essen-tial personal items *.* by taping to the body .*. " * Contrary to the above, on October 10, 1980, members of a work 102 040 J3tf

Boyce H. Grier, Dir. -2 -11-17-80 crew, including

a supervisor

working from a position over the reactor vessel pit, did not have essential

personal items taped to their bodies or otherwise

firmly secured. * Reply to Deficiency

The cause was .an oversight

on the part of some members of a Maintenance

Department.work

crew. This error was compounded

by the fact that tool control was being handled by the Operating ment which had responsibility

for the refueling

activities

being performed;-

the Operating

Department

refueling

procedure

did not include a formal procedure-

for tool control*.

The situation

was rectified

inimediately.

When the subject was brought to the *attention

of the maintenance

personnel

involved, essential

personal items were taped to their bodies or otherwise

firmly secured. Also, operating

personnel

responsible

for tool control were instructed

to read and follow Maintenance

Procedure

MllF. The Operating

Department

refueling

procedure

has been changed to .reference

a tool control procedure

and require its use and presence on the refueling

floor. If you have any further questions

with regard to this matter we will be pleased to discuss them with you. Sincerely, cc Director, Office of Inspection

and Enforcement.