ML18193A060
| ML18193A060 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/12/2018 |
| From: | Arizona Nuclear Power Project |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| 9.2-4 | |
| Download: ML18193A060 (1) | |
Text
KV PROGRAMMER CONTROLS TO SPENT REGENERANT SUMP FROM SLOWDOWN TREATMENT FACILITY WATER MAKEUP LINES (TYPICAL)FROM PLANT RESERVOIR QHS I MAKEUP WATER BOOSTER PUMPS)~HS Pl HS COAGULANT MIXING TEE FE (TYPICAL THREE UNITS)I PDT PD I FILL ACTIVATED CARBON FILTER TO SPENT REGENERANT SUMP TO SPENT CARBON DISPOSAL FT LI FILL VENT COAGULANT STORAGE TANK PSV Pl PSV Ir 111 UJ O 41 1r AT FILL PD I ACTIVATED CARBON FILTER TO WATER.DEMINERALIZER SUBSYSTEM TO SPENT CARBON DISPOSAL Pl COAGULANT METERING PUMPS UNIT NO.I FILTERED WATER SYSTEM UNIT NO.2 FILTERED WATER SYSTEM NOT E: SYSTEM IS NON NUCLEAR SAFETY PRESSURE FILTERS UNIT NO.3 FILTERED WATER SYSTEM Ar)zona Nuclear Power Prolect u Palo Verde Nuclear Generating Station Units 1, 2&3 DEMINERALIZED WATER SYSTEM WATER PRETREATMENT SUBSYSTEM Figure 9.2-4 10401 114 29MR4 441