ML18192B912

From kanterella
Revision as of 15:41, 11 December 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Palo Verde - Table 8A-1, PVNGS-1,2&3 Er Short-Term Power Shortages, Operations Committee Load Shedding and Restoration Summary, 1973 (Sheet 2 of 2).
ML18192B912
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/10/1975
From:
Arizona Public Service Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18192B912 (1)


Text

Area and Utility Estimated Area Load Estimated Generating Capacity 59.6 and above 59.5 to 59.1 59.0 to 58.6 58.5 to 58.1 58.0 to 57.6 Automatic Load Shedding Schedule MW Frequency Setting of Relays Hz 57.5 to 57.0 Manual Shedding MW and Hz Total Est.Load Shed MW 59.9 59'59.7 59.6 59.5 59.4 59.3 59.2 Load Restoration Automatic Relay Setting and Megawatts 59.1 Time Delay in Minutes Manual or Superv.MW PVNGS-1,2&3 ER SHORT TERM POWER SHORTAGFS Table BA-1 OPFRATIONS COMMITTEE LOAD SHEDDING AND RESTORATION SUMMARy, 1973 (Sheet 2 of 2)Area No.11 Arizona Public Service 1670 1948 (b)142 423 330 149 1044 63 867 Area No.11 USBR Reg 3 (Lo.Co.)]2 (c)563 368 155(f)297(f)452 (f)20 432 Area No.11 Salt River Project 1525 1265 44 446 305 151 946 946 Area No.11 Tucson Gas&Electric 640 765 39 70 169 268 286 Area No.11 Citizens Information Not Available Utilities Area No.11 Nevada Power Company 934 7 3 8 (e)205 169 94 468 468 Area No.15 Southern California Edison 10390 13400 68 1893 2052 1960 1102 7075 7075 Area No.15 Municipal Water District 317 317 317 317 317 b.Does not include 203.7 MW of firm capacity purchases c.CRSP Firm Schedule to AZ d.Does not include 584 MW of firm capacity purchases e.Does not include 309 MW of firm capacity purchases f.Includes Parker-Davis

&CRSP Loads S6-BA-3 (BA-5)Supplement No.6 October 10 1975 126