ML18193A917
| ML18193A917 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde (NPF-041, NPF-051, NPF-074) |
| Issue date: | 03/01/1978 |
| From: | Arizona Nuclear Power Project |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| 10.4-3 | |
| Download: ML18193A917 (1) | |
Text
I I I I I I I I I I I-I i I F F S O C I-I I II I I I.I I STEAM BYPASS CONTROL SYSTEM L I I I I I I HIC E/P FY L zT AS CR IC E/P FY AS CR HIC S EIP FY t ZT AS HID EIP FY AS L~HID E/P FY AS ZT L zT CONDENSER A HIC CR EIP FY AS CONDENSER S CONDE"ISER C ZT FROM MAISI SJEAIF NOTE.THIS SYSTEM IS NON-SEISMIC CATEGORYI Arizona Nuclear Pozrer Project Palo Verde Nuclear GcneratinN Station Units I, 2 tt 3 BASIC FLOW DIAGRAM TURBINE BYPASS SYSTEM CHANGE Figure 10.4-3 1235 March 1, 1978 Amendment 17